Fredrick Charles Walovich
- License
- C15409
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Jul 2021 to Aug 2024
6 permits since 2000 (architect on 6 permits): 4 completed, 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Robert L Brown Construction Inc. (2), Axis Construction, Blackstone Construction Services Inc, Fulcrum Point Construction
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 5
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 14, 2024 | In progress issued Aug 2024 | 3240 Sacramento St | Blackstone Construction Services Inc | scope includes repair of exterior stucco walls, decks, windows and sliding glass doors as noted on the plans facing front. facade will not change and will be like for like replacment of materials damaged by water. facing front,replacement of 4 windows and 2 sliding glass doors with fiberglass modelsDetails
scope includes repair of exterior stucco walls, decks, windows and sliding glass doors as noted on the plans facing front. facade will not change and will be like for like replacment of materials damaged by water. facing front,replacement of 4 windows and 2 sliding glass doors with fiberglass models | $257,358 |
| Jul 7, 2023 | Completed final sign-off Mar 2024 | 677 Arguello Bl | unit# 109: remove & replace sliding door and deck tiling in-kind.Details
unit# 109: remove & replace sliding door and deck tiling in-kind. | $8,550 | |
| Jul 7, 2023 | Completed final sign-off Mar 2024 | 677 Arguello Bl | Robert L Brown Construction Inc. | unit# 106: remove & replace window. no exterior facade changes.Details
unit# 106: remove & replace window. no exterior facade changes. | $1,800 |
| Jul 7, 2023 | Completed final sign-off Mar 2024 | 677 Arguello Bl | Robert L Brown Construction Inc. | remove & replace door at roof penthouse, provide necessary waterproofing. remove & replace doorat second floor light well.Details
remove & replace door at roof penthouse, provide necessary waterproofing. remove & replace doorat second floor light well. | $2,400 |
| Apr 6, 2023 | Never finaled issued Apr 2023, no final | 1378 York St | Fulcrum Point Construction | revise pa# 2022-1115-6502: to revise property line foundaation detailingDetails
revise pa# 2022-1115-6502: to revise property line foundaation detailing | |
| Jul 1, 2021 | Completed final sign-off Apr 2022 | 35 Dolores St | Axis Construction | unit 206: move interior door and wall to create bike room. remove and replace upper and lower kitchen cabinet. add build in cabinetry.Details
unit 206: move interior door and wall to create bike room. remove and replace upper and lower kitchen cabinet. add build in cabinetry. | $110,000 |