Permit GraphShortlistSan Francisco building permits since 2000

Block 5517, lot 039

23 Mirabel Ave

City’s use
Multi-Family Residential
Built
1905
Stories
3
Units
3
Rooms
3 bathrooms
Building
3,000 sq ft
Lot
3,123 sq ft
Zoning
RH2
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

11 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jan 9, 2026In progress
issued Jan 2026
23 Mirabel AvElias Hom Improvements#a & #b -replace water heater (2 gas) with a electrical water heater heat pump. connect plumbing. connect electrical (2) 30 amp breaker through the electrical panel (disconnect existing tanks)
Details
Permit
202601093570
Status
issued
Filed
Jan 9, 2026
Permit issued
Jan 9, 2026
Declared cost
$8,100
Address
23 Mirabel Av

#a & #b -replace water heater (2 gas) with a electrical water heater heat pump. connect plumbing. connect electrical (2) 30 amp breaker through the electrical panel (disconnect existing tanks)

Open the permit page

$8,100
Dec 2, 2025In progress
issued Dec 2025
23 Mirabel AvGil Construction & Assoc Inc.reduce size of decks at 1-3 floors. replace (e) stair run from 3rd floor to 2nd floor with (n) stair run. replace all (n) guardrails with (n). replace (e) decking with (n)
Details
Permit
202512020775
Status
issued
Filed
Dec 2, 2025
Permit issued
Dec 11, 2025
Declared cost
$45,000
Address
23 Mirabel Av

reduce size of decks at 1-3 floors. replace (e) stair run from 3rd floor to 2nd floor with (n) stair run. replace all (n) guardrails with (n). replace (e) decking with (n)

Open the permit page

$45,000
Jan 27, 2023Expired or cancelled
withdrawn Jul 2025
23 Mirabel AvBoaz Mor Design & Constructiondeck changes reducing size of 3rd story deck. widening 2nd story deck. removal of existing stair case between 2nd & 3rd story. adding spiral staircase between 2nd & 3rd story.
Details
Permit
202301270934
Status
withdrawn
Filed
Jan 27, 2023
Declared cost
$30,000
Address
23 Mirabel Av

deck changes reducing size of 3rd story deck. widening 2nd story deck. removal of existing stair case between 2nd & 3rd story. adding spiral staircase between 2nd & 3rd story.

Open the permit page

$30,000
Dec 8, 2022Completed
final sign-off May 2023
23 Mirabel AvJemico Llc Dba Renewal By Andersen Of Sfreplace (1) window, non street visible, same size and location. in rear of home. proposed: alum wood clad. < .30 u factor
Details
Permit
202212087904
Status
complete
Filed
Dec 8, 2022
Permit issued
Dec 8, 2022
Final sign-off
May 12, 2023
Declared cost
$3,808
Address
23 Mirabel Av

replace (1) window, non street visible, same size and location. in rear of home. proposed: alum wood clad. < .30 u factor

Open the permit page

$3,808
Mar 9, 2021Completed
final sign-off Mar 2022
23 Mirabel Avadd kitchen cabinets on the 1st floor. add island (3ft clarance on all sides) and separate electrical/plumbing permits. replace cabinets in small kitchenette upstairs.
Details
Permit
202103096162
Status
complete
Filed
Mar 9, 2021
Permit issued
Mar 9, 2021
Final sign-off
Mar 22, 2022
Declared cost
$50,000
Address
23 Mirabel Av

add kitchen cabinets on the 1st floor. add island (3ft clarance on all sides) and separate electrical/plumbing permits. replace cabinets in small kitchenette upstairs.

Open the permit page

$50,000
Mar 9, 2021Completed
final sign-off Feb 2022
23 Mirabel AvUntitled Labs Inc Dba Made Renovation2 bathroom remodels in-kind. floor 2. (n) tub shower (n) toilet, (n) vanity, (n) fixtures. floor 3 (n) curbed shower (n) toilet (n) vamoty (n) fixtures. all in kind.
Details
Permit
202103096185
Status
complete
Filed
Mar 9, 2021
Permit issued
Mar 9, 2021
Final sign-off
Feb 14, 2022
Declared cost
$29,000
Address
23 Mirabel Av

2 bathroom remodels in-kind. floor 2. (n) tub shower (n) toilet, (n) vanity, (n) fixtures. floor 3 (n) curbed shower (n) toilet (n) vamoty (n) fixtures. all in kind.

Open the permit page

$29,000
Feb 4, 2021Completed
final sign-off Feb 2022
23 Mirabel AvJemico Llc Dba Renewal By Andersen Of Sfreplacing in kind 22 wood andersen e series windows insert into wood pockets 7 4 non-street visible wood composite sd's insert into existing wood pockets. u-factor. 0.30 max.
Details
Permit
202102043943
Status
complete
Filed
Feb 4, 2021
Permit issued
Feb 4, 2021
Final sign-off
Feb 7, 2022
Declared cost
$111,519
Address
23 Mirabel Av

replacing in kind 22 wood andersen e series windows insert into wood pockets 7 4 non-street visible wood composite sd's insert into existing wood pockets. u-factor. 0.30 max.

Open the permit page

$111,519
May 23, 2007Completed
final sign-off Jul 2007
23 Mirabel Avdry rot-deck repair. less than 50% of structure at rear
Details
Permit
200705232070
Status
complete
Filed
May 23, 2007
Permit issued
May 23, 2007
Final sign-off
Jul 13, 2007
Declared cost
$250
Address
23 Mirabel Av

dry rot-deck repair. less than 50% of structure at rear

Open the permit page

$250
Apr 23, 2004Completed
final sign-off Jun 2004
23 Mirabel AvSine Electricinstall flat to roof (at pitch) 21 solar modules, connected to 1 ea 3500 watt power inverter.
Details
Permit
200404232102
Status
complete
Filed
Apr 23, 2004
Permit issued
Apr 23, 2004
Final sign-off
Jun 23, 2004
Declared cost
$16,500
Address
23 Mirabel Av

install flat to roof (at pitch) 21 solar modules, connected to 1 ea 3500 watt power inverter.

Open the permit page

$16,500
Apr 18, 2000Expired or cancelled
expired Aug 2000
23 Mirabel AvLewis & Nadell Const.renewal of pa 9903151
Details
Permit
200004187488
Status
expired
Filed
Apr 18, 2000
Permit issued
Apr 18, 2000
Address
23 Mirabel Av

renewal of pa 9903151

Open the permit page

Jan 10, 2000Expired or cancelled
expired Aug 2000
23 Mirabel Avretrofit foundation
Details
Permit
20000110597
Status
expired
Filed
Jan 10, 2000
Permit issued
Feb 9, 2000
Declared cost
$15,000
Address
23 Mirabel Av

retrofit foundation

Open the permit page

$15,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Jemico Llc Dba Renewal By Andersen Of Sf (2), Boaz Mor Design & Construction, Elias Hom Improvements, Gil Construction & Assoc Inc., Lewis & Nadell Const., Sine Electric, Untitled Labs Inc Dba Made Renovation
Architects
Michael Schulte
Engineers
Victor Ramos

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.