Block 0249, lot 023
1575 Sacramento St
- City’s use
- Multi-Family Residential
- Built
- 1909
- Stories
- 3
- Units
- 13
- Rooms
- 11 bedrooms, 13 bathrooms
- Building
- 8,075 sq ft
- Lot
- 3,056 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 26, 2021 | Never finaled issued Jun 2022, no final | 1575 Sacramento St | Ipower Sf Electric Inc, Halyard Inc | like for like fire alarm system replacement & 2023 mandate installation of fire alarm system in non-sprinklered building to comply with sffc 1103.7.6.Details
like for like fire alarm system replacement & 2023 mandate installation of fire alarm system in non-sprinklered building to comply with sffc 1103.7.6. | $8,000 |
| Jul 9, 2019 | Never finaled issued Jul 2019, no final | 1575 Sacramento St | street spaceDetails
street space | ||
| Mar 15, 2019 | Completed final sign-off Oct 2022 | 1575 Sacramento St | Allied Teamwork Construction Co | seismic retrofit to comply with mandatory soft story program per ordinance 66-13. 2016 cebc appendix a-4Details
seismic retrofit to comply with mandatory soft story program per ordinance 66-13. 2016 cebc appendix a-4 | $40,000 |
| Oct 11, 2018 | Completed final sign-off Jun 2019 | 1575 Sacramento St | Us Construction California, Inc | unit #11: renovation of 3rd floor: new kitchen,new bathroom, new plmbg fixtures, nw lighting, add washer and dryer, add dishwasher. no exterior work. no structural work. no fire alarm or sprinkler work.Details
unit #11: renovation of 3rd floor: new kitchen,new bathroom, new plmbg fixtures, nw lighting, add washer and dryer, add dishwasher. no exterior work. no structural work. no fire alarm or sprinkler work. | $35,000 |
| Apr 20, 2018 | Never finaled issued Apr 2018, no final | 1575 Sacramento St | street spaceDetails
street space | ||
| Mar 23, 2018 | Never finaled issued Oct 2019, no final | 1575 Sacramento St | Halyard Inc | add 1 new unit on ground level per adu ordinance# 162-16. convert (e) storage into new unit within (e) envelope. 2 new bathrooms, 1 new dishwasher, 1 new washer & dryer. new kitchen, cabinets, new plumbing fixtures. new lighting @ (e) j-box locations. sprinkler & fire alarm under separate applicatioDetails
add 1 new unit on ground level per adu ordinance# 162-16. convert (e) storage into new unit within (e) envelope. 2 new bathrooms, 1 new dishwasher, 1 new washer & dryer. new kitchen, cabinets, new plumbing fixtures. new lighting @ (e) j-box locations. sprinkler & fire alarm under separate applicatio | $75,000 |
| Jan 26, 2018 | Completed final sign-off Jun 2018 | 1575 Sacramento St | Us Construction California, Inc | work in unit #9: kitchen and bath remodel, tile floor, new fixturesDetails
work in unit #9: kitchen and bath remodel, tile floor, new fixtures | $40,000 |
| Nov 28, 2017 | Never finaled issued Nov 2017, no final | 1575 Sacramento St | street spaceDetails
street space | ||
| Nov 13, 2017 | Never finaled issued Nov 2017, no final | 1571 Sacramento St | street space permitDetails
street space permit | ||
| Mar 28, 2017 | Never finaled issued Mar 2017, no final | 1575 Sacramento St | Northbay Builders | street spaceDetails
street space | |
| Dec 29, 2016 | Never finaled issued Dec 2016, no final | 1571 Sacramento St | street spaceDetails
street space | ||
| Oct 18, 2016 | Completed final sign-off Apr 2017 | 1571 Sacramento St | Cook Construction | replace tile, flooring, patch drywall, cabinets, counters in kitchens and baths at units 1,3 and 5 on first and second floors.Details
replace tile, flooring, patch drywall, cabinets, counters in kitchens and baths at units 1,3 and 5 on first and second floors. | $120,000 |
| Oct 14, 2016 | Never finaled issued Oct 2016, no final | 1575 Sacramento St | Cook Construction | reconfigure unit 8 on 3rd fl. demolition of interior kitchen walls. new plumbing fixtures, new lighting and electrical. no exterior work. no fire alarm or sprinkler work. convert living room to new bedroomDetails
reconfigure unit 8 on 3rd fl. demolition of interior kitchen walls. new plumbing fixtures, new lighting and electrical. no exterior work. no fire alarm or sprinkler work. convert living room to new bedroom | $10,000 |
| Sep 18, 2012 | Never finaled issued Sep 2012, no final | 1575 Sacramento St | street spaceDetails
street space | ||
| Jun 21, 2010 | Completed final sign-off Jun 2010 | 1575 Sacramento St | Sure Roofing Systems/R.O.Choy | reroofingDetails
reroofing | $11,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cook Construction (2), Halyard Inc (2), Us Construction California, Inc (2), Allied Teamwork Construction Co, Ipower Sf Electric Inc, Northbay Builders, Sure Roofing Systems/R.O.Choy
- Architects
- Jacob Herczeg (3)
- Engineers
- Tyler Moser