K 2 Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2004 to Aug 2026
- Last 24 months
- 20 permits filed
165 permits since 2000: 133 completed, 7 in progress, 16 never finaled, 9 expired or cancelled.
Of the 16 never-finaled permits, 3 are 3 to 5 years old, 6 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Roof deck permits
8 roof deck permits: 7 completed, 1 never finaled. Typically 24 days from filing to permit and 447 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2025 | Completed final sign-off Jan 2026 | 2518 Buchanan St | to comply with nov 202538518 repair in kind (e) fence @ (e) roof deck.Details
to comply with nov 202538518 repair in kind (e) fence @ (e) roof deck. | $5,000 |
| Nov 8, 2023 | Completed final sign-off Feb 2025 | 1944 Great Hy | revision to 202308114295 to include roof deck & roof latch with interior stairs and move skylight over dinning.Details
revision to 202308114295 to include roof deck & roof latch with interior stairs and move skylight over dinning. | $10,000 |
| Aug 19, 2022 | Completed final sign-off Nov 2025 | 161 Prentiss St | first floor single story addition at rear with roof deck. 1st and 2nd floor renovation. window & exterior door replacement. front facade stucco replacement. new rear deck.Details
first floor single story addition at rear with roof deck. 1st and 2nd floor renovation. window & exterior door replacement. front facade stucco replacement. new rear deck. | $200,000 |
| Jun 8, 2022 | Completed final sign-off Dec 2022 | 676 Peralta Av | revision to pa# 202110150537. as-built structural changes to roof framing and 2nd fl framing. no change to roof deck layout.Details
revision to pa# 202110150537. as-built structural changes to roof framing and 2nd fl framing. no change to roof deck layout. | |
| Sep 15, 2021 | Never finaled issued Jul 2023, no final | 3821 Noriega St | alteration of ground floor commercial building of type v construction with the addition of 3 stories of r-2 residential type v-a construction above. the proposed addition will provide 1 residential unit per floor with a private terrace at the second floor rear yard and a common area roof deck.Details
alteration of ground floor commercial building of type v construction with the addition of 3 stories of r-2 residential type v-a construction above. the proposed addition will provide 1 residential unit per floor with a private terrace at the second floor rear yard and a common area roof deck. | $1,700,000 |
| May 19, 2016 | Completed final sign-off Dec 2017 | 1601 Larkin St | 5th floor, unit #502: private roof deck, less than 500 sq ft with glass railing and surface non-combustible pavers. ref to pa# 200412171712sDetails
5th floor, unit #502: private roof deck, less than 500 sq ft with glass railing and surface non-combustible pavers. ref to pa# 200412171712s | $20,000 |
| May 10, 2012 | Completed final sign-off May 2014 | 60 Gates St | revision to pa#201203236767. add bedroom and closet on 1st floor. replace all windows and new roof deck terrace and stair. windows shall be metal frame.Details
revision to pa#201203236767. add bedroom and closet on 1st floor. replace all windows and new roof deck terrace and stair. windows shall be metal frame. | $30,000 |
| Aug 18, 2010 | Completed final sign-off Apr 2011 | 5 Cyrus Pl | revision to pa@ 2008.11.10.6167 ( issued, not completed yet). add a private roof deck to top of bldg above the 4th fl roof. work to include new privated stair9 exterior) from 4th fl to roof, mionr relocation of powder roo, and filling in a previously approved/ proposed lighwell on the 4th flDetails
revision to pa@ 2008.11.10.6167 ( issued, not completed yet). add a private roof deck to top of bldg above the 4th fl roof. work to include new privated stair9 exterior) from 4th fl to roof, mionr relocation of powder roo, and filling in a previously approved/ proposed lighwell on the 4th fl | $8,000 |