- 20 permits filed
165 permits since 2000: 133 completed, 7 in progress, 16 never finaled, 9 expired or cancelled.
Of the 16 never-finaled permits, 3 are 3 to 5 years old, 6 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 4 completed, 1 never finaled. Typically 10 days from filing to permit and 544 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2022 | Completed final sign-off Nov 2025 | 161 Prentiss St | first floor single story addition at rear with roof deck. 1st and 2nd floor renovation. window & exterior door replacement. front facade stucco replacement. new rear deck.Details
first floor single story addition at rear with roof deck. 1st and 2nd floor renovation. window & exterior door replacement. front facade stucco replacement. new rear deck. | $200,000 |
| Jun 14, 2021 | Completed final sign-off Sep 2022 | 210 Yerba Buena Av | add habitable space to 1st floor/garage level-media room, bath & 2 bedrooms, rebuild interiror stair connecting levels 1 & 2. 2nd floor renovation:remodel kitchen & bathrooms, remove bay @ rear. rear yard deck @ grade.Details
add habitable space to 1st floor/garage level-media room, bath & 2 bedrooms, rebuild interiror stair connecting levels 1 & 2. 2nd floor renovation:remodel kitchen & bathrooms, remove bay @ rear. rear yard deck @ grade. | $253,000 |
| Nov 14, 2019 | Never finaled issued Nov 2019, no final | 850 Dolores St | repair rear deck, replace rotten decking w/ serveral joists, some handrail, less than 50%. replcae door to deckDetails
repair rear deck, replace rotten decking w/ serveral joists, some handrail, less than 50%. replcae door to deck | $10,000 |
| Nov 7, 2017 | Completed final sign-off Jan 2022 | 645 Peralta Av | addition of (1) dwelling unit. addition of (2) new decks.Details
addition of (1) dwelling unit. addition of (2) new decks. | $80,000 |
| Mar 2, 2012 | Completed final sign-off May 2012 | 338 Fillmore St | replace siding in kind in lightwell area where needed, approx 600 sq.ft., repair & replace siding in kind at rear of bldg from deck area upto fire escape area, approx. 500 sq.ft., repair misc. siding, crown moulding and decorative moulding at front of bldg.Details
replace siding in kind in lightwell area where needed, approx 600 sq.ft., repair & replace siding in kind at rear of bldg from deck area upto fire escape area, approx. 500 sq.ft., repair misc. siding, crown moulding and decorative moulding at front of bldg. | $7,000 |