Level 8 Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2004 to Aug 2026
- Last 24 months
- 22 permits filed
485 permits since 2000: 325 completed, 25 in progress, 64 never finaled, 71 expired or cancelled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
Roof deck permits
15 roof deck permits: 13 completed, 1 never finaled, 1 expired or cancelled. Typically 4 days from filing to permit and 165 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 22, 2024 | Completed | 150 Randall St | change material type for railings - pa# 201704033878. cable rail to glass panel at roof deck @ front of bldg | |
| Aug 8, 2019 | Completed | 1533 Pacific Av | per approved variance build separation of rear building 2 stories with 1-hour separation construction @ all demising walls. add kitchen to second fl. finish previously approved spiral stair & roof deck. add fire rated cabinet to meters in exist corridor. | $25,000 |
| Jan 18, 2018 | Expired or cancelled | 2536 Greenwich St | minor framing (non-structural) in ceiling and sheetrock patchong for new electrical ceiling lights throughout house. new electrival wiring throughout. add hose bib on roof deck. | |
| Jun 7, 2017 | Completed | 585 Ortega St | investigate leak and potential dry rot. apply epoxy coating over roof deck including water proof membrane. 150 sq ft. | $5,000 |
| Nov 29, 2011 | Never finaled | 1535 Pacific Av | remodel current kitchen & bathrooms. add (2) 1/2 bathrooms & bedrooms. add roof deck. add 1 car space. enclose & remove an exterior staircase. add a pentroom for deck. replace skylight. sprinklers under separate permit. | $200,000 |
| May 29, 2009 | Completed | 2762 Union St | dryrot repair less than 50% 1 ceiling joist & 1 post waterproof deck walkway. deck measures approx 8'x10' repair work only. all work is non structural only. | $5,100 |
| May 28, 2009 | Completed | 400 Avila St | work @ unit# 105 only. add 1 overflor drain on roof deck. patch wall around over flow drain. additional to (e) drain @ side. | $600 |
| May 7, 2009 | Completed | 400 Avila St | work @ unit# 105 only. replace roof deck surface boards in kind. replace kitchen cabinets. non structural work. in kind. 8 linear ft. no lighting. | $4,400 |
| Jul 1, 2008 | Completed | 2829 Steiner St | revision to pa# 2008-0211-4504. revision of stairs from 3/f to roof deck. remove ceiling joists @ rear bedrom location. | $1,000 |
| Feb 11, 2008 | Completed | 2829 Steiner St | new roof deck & stair penthouse to roof. new downlights (louvered) @ roof deck windscreen (glass) over ipe railing | $20,000 |
| Jan 30, 2008 | Completed | 941 North Point St | construct new roof deck and spiral staircase per plan. | $25,000 |
| Mar 20, 2007 | Completed | 2665 Leavenworth St | new roof deck over 3rd level, new entry door at landing between 2nd and 3rd level units to create roof access from 1 unit only. structure was approved separately | $10,000 |
| Feb 20, 2007 | Completed | 52 Iris Av | new roof deck. new private stair to roof deck per plan | $25,000 |
| Feb 8, 2007 | Completed | 57 Iris Av | add new private 400 sq ft roof deck and new private access stair from unit 2 to roof deck. max 4'0" above extg parapet | $25,000 |
| Jun 30, 2006 | Completed | 2328 Francisco St | horizontal & vertical addition at rear (20' at 1st flr. w/ roof deck, 8' at 2nd & 3rd floors) balcony at third floor, roof deck over 3rd floor. new conditioned space & full bath at 1st floor. | $300,000 |