Back to bathroom remodel contractors
Level 8 Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2004 to Aug 2026
- Last 24 months
- 22 permits filed
485 permits since 2000: 325 completed, 24 in progress, 65 never finaled, 71 expired or cancelled.
Of the 65 never-finaled permits, 12 are 3 to 5 years old, 17 are 5 to 10 years old, 36 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
147 bathroom remodel permits: 103 completed, 4 in progress, 19 never finaled, 21 expired or cancelled. Typically 0 days from filing to permit and 204 days from permit to final inspection.
Showing the 100 most recent of 147.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2026 | In progress issued Jun 2026 | 24 John St | add (n) bathroom on 2nd floor. add (n) door from bedroom to bathroom, reconfigure (e) bathroom at 2nd floor, add (n) powder/laundry room in basement, remove (e) bearing wall in kitchen on 2nd floorDetails
add (n) bathroom on 2nd floor. add (n) door from bedroom to bathroom, reconfigure (e) bathroom at 2nd floor, add (n) powder/laundry room in basement, remove (e) bearing wall in kitchen on 2nd floor | $125,000 |
| Feb 6, 2026 | In progress issued May 2026 | 2260 Greenwich St | 1)remodel existing 1st floor including converting 62 sf of storage space to habitable space, enlarge(e) bathroom 2) remodel (e) kitchen at 2nd floor - this project does not remove a unit protectedunder section 317 of the planning code.Details
1)remodel existing 1st floor including converting 62 sf of storage space to habitable space, enlarge(e) bathroom 2) remodel (e) kitchen at 2nd floor - this project does not remove a unit protectedunder section 317 of the planning code. | $100,000 |
| Jun 26, 2025 | In progress issued Aug 2025 | 465 Harkness Av | remodel (e) kitchen, open to living room. remodel 2nd fl bath; add family room, new bath & a media room on 1st fl; change windows not visible from street. add 1 column & new footing @ garage. general mep upgradesDetails
remodel (e) kitchen, open to living room. remodel 2nd fl bath; add family room, new bath & a media room on 1st fl; change windows not visible from street. add 1 column & new footing @ garage. general mep upgrades | $170,000 |
| Aug 15, 2024 | Completed final sign-off Jan 2025 | 30 Cunningham Pl | remodel primary bathroom add steam unit convert bath tub to shower electric heated floors no structural workDetails
remodel primary bathroom add steam unit convert bath tub to shower electric heated floors no structural work | $2,500 |
| Apr 23, 2024 | Completed final sign-off Aug 2024 | 1718 10th Av | remodel kitchen and partial bathroom. shower, vanity, and shower pan. (no structural work). all work in kind. no moving walls. kitchen approx. 110 sq ft. bathroom remodel area approx. 12 sq ft.Details
remodel kitchen and partial bathroom. shower, vanity, and shower pan. (no structural work). all work in kind. no moving walls. kitchen approx. 110 sq ft. bathroom remodel area approx. 12 sq ft. | $20,000 |
| Oct 12, 2023 | In progress issued Oct 2023 | 1470 Leavenworth St | revision to permit# 202205254943: ada counter location. door swing at entry. bathroom location due to (e) gray beam.Details
revision to permit# 202205254943: ada counter location. door swing at entry. bathroom location due to (e) gray beam. | |
| Sep 25, 2023 | Completed final sign-off Jan 2024 | 600 20th Av | remodel 2nd floor bathroom, replace 2nd floor upper kitchen cabinets (4 cabinets only)Details
remodel 2nd floor bathroom, replace 2nd floor upper kitchen cabinets (4 cabinets only) | $30,000 |
| Sep 25, 2023 | Never finaled issued Sep 2023, no final | 1629 Washington St | remodel partial bathroom. replace bathtub with new. replace vanity sink with new. replace toilet with new. same locations for all three fixtures. no strcutural work.Details
remodel partial bathroom. replace bathtub with new. replace vanity sink with new. replace toilet with new. same locations for all three fixtures. no strcutural work. | $15,000 |
| Nov 15, 2022 | Completed final sign-off Jan 2024 | 254 Roosevelt Wy | unit 4: amend pa 202204122080, bathroom remodel: convert tub to shower, new fixtures, replace tiles on walls and floorsDetails
unit 4: amend pa 202204122080, bathroom remodel: convert tub to shower, new fixtures, replace tiles on walls and floors | $5,000 |
| Oct 17, 2022 | Completed final sign-off Dec 2022 | 480 Colon Av | remodel hallway bathroom: no structural work approx 45 sqft no wall demoDetails
remodel hallway bathroom: no structural work approx 45 sqft no wall demo | $20,000 |
| May 25, 2022 | Never finaled issued Jun 2022, no final | 1470 Leavenworth St | laundry space (1470 leavenworth): lighting, flooring, window, ada push button & entrance slope. commercial space (1273 jackson): lighting, flooring, window, ada push button, bathroom & entrance slope. jackson store front not to be touched. no fiber glass or plastics@store front windowsDetails
laundry space (1470 leavenworth): lighting, flooring, window, ada push button & entrance slope. commercial space (1273 jackson): lighting, flooring, window, ada push button, bathroom & entrance slope. jackson store front not to be touched. no fiber glass or plastics@store front windows | $80,000 |
| May 9, 2022 | Completed final sign-off Aug 2022 | 65 Castenada Av | modification to permit #202112083999 - remove half bathroom at basement from original scope of work under pa#202112083999. remodel existing laundry room only.Details
modification to permit #202112083999 - remove half bathroom at basement from original scope of work under pa#202112083999. remodel existing laundry room only. | |
| Apr 7, 2022 | Completed final sign-off Jan 2024 | 2864 24th St | lower unit second fl: remodel 1-kitchen & 1-bathroom &1-powder rm, install new electricl, install radiant heat throughout the unit replace all windows w/ wood clad(6) street facing; same size same location; u=0.3max. no alteration of wall & door.Details
lower unit second fl: remodel 1-kitchen & 1-bathroom &1-powder rm, install new electricl, install radiant heat throughout the unit replace all windows w/ wood clad(6) street facing; same size same location; u=0.3max. no alteration of wall & door. | $60,000 |
| Dec 8, 2021 | Completed final sign-off Aug 2022 | 65 Castenada Av | two (2) bath remodels, one (1) half-bath remodel. replace forced air furnace, replace water heater, replace garage door. all work inkind, non structural.Details
two (2) bath remodels, one (1) half-bath remodel. replace forced air furnace, replace water heater, replace garage door. all work inkind, non structural. | $35,000 |
| Nov 23, 2021 | Never finaled issued Dec 2021, no final | 3678 18th St | to comply with nov #202180048 for unit 4. remodel unit 1 and 3. replace wall furnace with hydronic radiant heating, remodel kitchen and bath to each unit. add washer/dryer.Details
to comply with nov #202180048 for unit 4. remodel unit 1 and 3. replace wall furnace with hydronic radiant heating, remodel kitchen and bath to each unit. add washer/dryer. | $90,000 |
| Sep 15, 2021 | Never finaled issued Oct 2021, no final | 1282 Stanyan St | renovate the (e) kitchen & bathroom. replace (e) patio door to rear. modify closet upstairs. add cabinets in upstairs bedroom.Details
renovate the (e) kitchen & bathroom. replace (e) patio door to rear. modify closet upstairs. add cabinets in upstairs bedroom. | $30,000 |
| Sep 8, 2021 | Completed final sign-off Apr 2022 | 2032 Mission St | comply w/nov #202181454: adding bathroom fan,relocating water heaters connect to flue run, correction to the rear stairs reinforcement, repair/replace windows.Details
comply w/nov #202181454: adding bathroom fan,relocating water heaters connect to flue run, correction to the rear stairs reinforcement, repair/replace windows. | $15,000 |
| Aug 24, 2021 | Completed final sign-off Oct 2021 | 506 Grove St | unit 205: repair plumbing. remodel 1 bathroom. no structural work. comply to complain # 202179275.Details
unit 205: repair plumbing. remodel 1 bathroom. no structural work. comply to complain # 202179275. | $10,000 |
| Aug 16, 2021 | Completed final sign-off Feb 2023 | 996 South Van Ness Av | 1) split 1 bath into 2 bathrooms. 2)reconfigure bedroom. 3)add kitchen island.Details
1) split 1 bath into 2 bathrooms. 2)reconfigure bedroom. 3)add kitchen island. | $60,000 |
| Aug 6, 2021 | Completed final sign-off Jul 2023 | 2542 Sacramento St | remodel kitchen and bathroom. recess lights in hallway, living room. no structural work. lights perr (ec 150.0k)Details
remodel kitchen and bathroom. recess lights in hallway, living room. no structural work. lights perr (ec 150.0k) | $38,000 |
| Jul 16, 2021 | Completed final sign-off Oct 2022 | 3678 18th St | unit 4: remodel kitchen & bath. recess lights. convert (e) hall closet to laundry room. dryer shall comply w/ cmc 504.4 and 502.2.1. lights per cec 150.0 (k).Details
unit 4: remodel kitchen & bath. recess lights. convert (e) hall closet to laundry room. dryer shall comply w/ cmc 504.4 and 502.2.1. lights per cec 150.0 (k). | $56,000 |
| Jul 7, 2021 | Expired or cancelled expired Jan 2023 | 400 Avila St | apt 105: remodel 1 bathroom: new tub, recessed lights, tiles, paint. no structural work.Details
apt 105: remodel 1 bathroom: new tub, recessed lights, tiles, paint. no structural work. | $6,000 |
| Jun 23, 2021 | Completed final sign-off Feb 2023 | 996 South Van Ness Av | apt 1.remodel kitchen and bathroom. add recessed lights in living room, hallway, kitchen and bath. new hardwood floors. no structural work.Details
apt 1.remodel kitchen and bathroom. add recessed lights in living room, hallway, kitchen and bath. new hardwood floors. no structural work. | $40,000 |
| Jun 18, 2021 | Completed final sign-off Dec 2023 | 4276 22nd St | new stair connecting 1st, 2nd, 3rd fl. 1st fl - lower slab height @ back half, new flush beam @ media/multi purpose rm; remove (e) half bath & add f ull bath. 2nd fl - create(n) room in space of (e) bedrm & mud rm. remodel (e) bathrm, (n) stairs to grade from (e) deckDetails
new stair connecting 1st, 2nd, 3rd fl. 1st fl - lower slab height @ back half, new flush beam @ media/multi purpose rm; remove (e) half bath & add f ull bath. 2nd fl - create(n) room in space of (e) bedrm & mud rm. remodel (e) bathrm, (n) stairs to grade from (e) deck | $158,885 |
| Feb 23, 2021 | Completed final sign-off Jul 2021 | 3678 18th St | unit #2:remodel in-kind kitchen & bath. new painting. no change in layout of walls & openings. maintain 1 hr separation between units at area of work.Details
unit #2:remodel in-kind kitchen & bath. new painting. no change in layout of walls & openings. maintain 1 hr separation between units at area of work. | $25,000 |
| Feb 9, 2021 | Completed final sign-off Dec 2021 | 443 Cole St | remodel hallway bathroom, legalize laundry room, add car charger oulet in garageDetails
remodel hallway bathroom, legalize laundry room, add car charger oulet in garage | $11,000 |
| May 29, 2020 | Completed final sign-off Sep 2020 | 1700 Gough St | replace kitchen cabinets. plumbing fixtures in bathroom. bathtub replaced with another bathtub of same dimensions. 2nd floor. unit #201. kitchen and bothroom remodel in-kind.Details
replace kitchen cabinets. plumbing fixtures in bathroom. bathtub replaced with another bathtub of same dimensions. 2nd floor. unit #201. kitchen and bothroom remodel in-kind. | $10,000 |
| Nov 21, 2019 | Completed final sign-off Jun 2020 | 1339 16th Av | reconfigure interior layout on 2nd floor unit #2 with four bedrooms, 2 bath, and kitchen/living room. no structural work.Details
reconfigure interior layout on 2nd floor unit #2 with four bedrooms, 2 bath, and kitchen/living room. no structural work. | $30,000 |
| Nov 5, 2019 | Completed final sign-off Oct 2021 | 2104 Divisadero St | replace a single back door. replace 3 windows, kitchen lower level and 2nd floor bathroom area. -- repair existing deck 40%. all work at rear.Details
replace a single back door. replace 3 windows, kitchen lower level and 2nd floor bathroom area. -- repair existing deck 40%. all work at rear. | $40,000 |
| Oct 9, 2019 | Completed final sign-off Dec 2021 | 2104 Divisadero St | rooms down project - adding a family room with a bathroom. includes new underground plumbing, new electrical, new plumbing. adding new led lights, new high eff forced air system, new patio,Details
rooms down project - adding a family room with a bathroom. includes new underground plumbing, new electrical, new plumbing. adding new led lights, new high eff forced air system, new patio, | $200,000 |
| Sep 30, 2019 | Completed final sign-off Oct 2021 | 2104 Divisadero St | 2 bathrooms - remodel - master: new shower stall, new vanity, new plumbing fixtures, new tile & slab, adding ceiling fan, adding lights, gfi, new shower drain. guest bathroom: existing bathtub, only new tile & plumbing fixtures.Details
2 bathrooms - remodel - master: new shower stall, new vanity, new plumbing fixtures, new tile & slab, adding ceiling fan, adding lights, gfi, new shower drain. guest bathroom: existing bathtub, only new tile & plumbing fixtures. | $40,000 |
| Jul 15, 2019 | Completed final sign-off Nov 2019 | 2428 Bush St | repair exterior stair (50% less) in backyard, install bathroom exhaust fan, change tub faucet. exhaust shall terminate min 3 feet away from property line/openings. shower less/greater than 1.8 pgm. lav less/greater than 1.2 gpmDetails
repair exterior stair (50% less) in backyard, install bathroom exhaust fan, change tub faucet. exhaust shall terminate min 3 feet away from property line/openings. shower less/greater than 1.8 pgm. lav less/greater than 1.2 gpm | $4,000 |
| Jul 9, 2019 | Completed final sign-off Dec 2020 | 450 Grant Av | kitchen renovation & minor bathroom renovation of finishes & fixtures in existing units. mep will be deferred. 3rd fll, all 5 units.Details
kitchen renovation & minor bathroom renovation of finishes & fixtures in existing units. mep will be deferred. 3rd fll, all 5 units. | $200,000 |
| Jul 8, 2019 | Completed final sign-off Jul 2019 | 501 Beale St | add new outlet in bathroom. replace existing toilet with new toilet. patch & paint.Details
add new outlet in bathroom. replace existing toilet with new toilet. patch & paint. | $4,500 |
| Jun 10, 2019 | Completed final sign-off Sep 2019 | 2814 Laguna St | convert extg walking closet to a new bathroom at 1st floorDetails
convert extg walking closet to a new bathroom at 1st floor | $7,000 |
| May 7, 2019 | Completed final sign-off Sep 2019 | 1950 Leavenworth St | convert pantry to bathroom at lower 2 unitsDetails
convert pantry to bathroom at lower 2 units | $16,000 |
| Mar 22, 2019 | Completed final sign-off Sep 2019 | 1950 Leavenworth St | 2 unit remodels, 1950 & 1952. upgrade of infrastructure outside of unit not included. demo & remodel kitchen 60 sq ft & bath 35-40 sq ft. laundry room at each unit, upgrade subpanelDetails
2 unit remodels, 1950 & 1952. upgrade of infrastructure outside of unit not included. demo & remodel kitchen 60 sq ft & bath 35-40 sq ft. laundry room at each unit, upgrade subpanel | $70,000 |
| Feb 6, 2019 | Completed final sign-off Apr 2020 | 101 Balboa St | add 2 roof dormers at attic at west hipped roof. new attic space to have (n) bedroom and spiral stair connection to 3rd floor. (n) bathroom at 3rd floorDetails
add 2 roof dormers at attic at west hipped roof. new attic space to have (n) bedroom and spiral stair connection to 3rd floor. (n) bathroom at 3rd floor | $30,000 |
| Oct 11, 2018 | Completed final sign-off Jun 2019 | 220 Liberty St | kitchen and bath remodel and add full bathDetails
kitchen and bath remodel and add full bath | $75,000 |
| Jun 11, 2018 | Completed final sign-off Jan 2020 | 2487 41st Av | addition of master bedroom and bath, deck & remodel kitchen. replace front windows with a wood cladDetails
addition of master bedroom and bath, deck & remodel kitchen. replace front windows with a wood clad | $100,000 |
| May 29, 2018 | Completed final sign-off Jul 2018 | 403 Main St | #712: bathroom remodel - replace floor tiles, vanity sink. faucets in both master & hallway. replace bathroom lights.Details
#712: bathroom remodel - replace floor tiles, vanity sink. faucets in both master & hallway. replace bathroom lights. | $5,000 |
| May 29, 2018 | Completed final sign-off Jul 2018 | 695 44th Av | revision to pa #201803093351, revised scope of work. reduce rat proofing and installation of ventilation fan in bathroom only, to connect to existing duct or vent exterior 3 feet from the window and pl.Details
revision to pa #201803093351, revised scope of work. reduce rat proofing and installation of ventilation fan in bathroom only, to connect to existing duct or vent exterior 3 feet from the window and pl. | |
| Mar 9, 2018 | Never finaled issued Mar 2018, no final | 695 44th Av | separate air return of furnae. add one new exhaust fan in bathroom and replace the toilet. investigate water leakage on window and fix/repair. rat-proofing. returne air shall not discharge from one unit to another. exhaust shall terminate 3' from pl & openingDetails
separate air return of furnae. add one new exhaust fan in bathroom and replace the toilet. investigate water leakage on window and fix/repair. rat-proofing. returne air shall not discharge from one unit to another. exhaust shall terminate 3' from pl & opening | $4,000 |
| Jan 19, 2018 | Never finaled issued Nov 2019, no final | 3721 Quintara St | addition of new adu unit per ord#95-17. new bathroom, bedroom living room, and kitchen at new first floor unit. new exterior stair from 2nd fl to grade in rear yard.Details
addition of new adu unit per ord#95-17. new bathroom, bedroom living room, and kitchen at new first floor unit. new exterior stair from 2nd fl to grade in rear yard. | $74,561 |
| Dec 12, 2017 | Completed final sign-off Oct 2021 | 1339 16th Av | adu per ordinace 162-16. one sleeping area, one bath on 1st fl per plan.Details
adu per ordinace 162-16. one sleeping area, one bath on 1st fl per plan. | $30,000 |
| Nov 22, 2017 | Never finaled issued Nov 2017, no final | 1710 Larkin St | unit #11 remodel the kitchen , bathroom , install radiant flooring , counter top, sink, cabinets, tankless water heater, vanity sink shower pan, lighting outletsDetails
unit #11 remodel the kitchen , bathroom , install radiant flooring , counter top, sink, cabinets, tankless water heater, vanity sink shower pan, lighting outlets | $11,000 |
| May 12, 2017 | Completed final sign-off Mar 2018 | 1879 Palou Av | construct 2 bedrooms, one full bathroom & media room. all work at ground floor.Details
construct 2 bedrooms, one full bathroom & media room. all work at ground floor. | $45,000 |
| Apr 13, 2017 | Never finaled issued Jul 2017, no final | 150 Randall St | revision to 201106248922 s/1: moving of internal wall and relocation of the kitchen and master bathroom, add powder rm @3rd. move laundry into garage & remove shop space in garage. exterior windows revised. hvac system changed to hydronic system, framing changes. no heated space added.Details
revision to 201106248922 s/1: moving of internal wall and relocation of the kitchen and master bathroom, add powder rm @3rd. move laundry into garage & remove shop space in garage. exterior windows revised. hvac system changed to hydronic system, framing changes. no heated space added. | |
| Mar 8, 2017 | Completed final sign-off May 2017 | 1450 Post St | unit 716: renovate restroom & kitchen, paint walls/ceilings; no change in walls/openings/layout; high efficacy lighting, bathroom lighting high efficacy or high efficacy main lighting controlled by manual sensor.Details
unit 716: renovate restroom & kitchen, paint walls/ceilings; no change in walls/openings/layout; high efficacy lighting, bathroom lighting high efficacy or high efficacy main lighting controlled by manual sensor. | $25,000 |
| Nov 21, 2016 | Completed final sign-off May 2017 | 473 Jackson St | interior modification to office bld. demo all (e) walls, rebuild 4 offices, conference room, kitchen and bathroomDetails
interior modification to office bld. demo all (e) walls, rebuild 4 offices, conference room, kitchen and bathroom | $140,000 |
| Nov 17, 2016 | Completed final sign-off Jul 2017 | 3775 California St | apt 6: kitchen & bathroom remodel. upgrade electrical througout. new tankless w/h. no wall modification. no structural work.Details
apt 6: kitchen & bathroom remodel. upgrade electrical througout. new tankless w/h. no wall modification. no structural work. | $25,000 |
| Oct 6, 2016 | Completed final sign-off Apr 2017 | 1450 Post St | #901 - kitchen remodel: replacing flooring, plumbing fixtures, light fixtures. bathroom includes: fan, faucet, & light fixture replacement.Details
#901 - kitchen remodel: replacing flooring, plumbing fixtures, light fixtures. bathroom includes: fan, faucet, & light fixture replacement. | $20,000 |
| May 17, 2016 | Expired or cancelled cancelled Jun 2016 | 407 30th St | remodel of new kitchen and 2.5 bathrooms (added 1.5), new laundry and bedrooms. no walls removed or added.Details
remodel of new kitchen and 2.5 bathrooms (added 1.5), new laundry and bedrooms. no walls removed or added. | $35,000 |
| Jan 27, 2016 | Completed final sign-off Sep 2016 | 1380 Greenwich St | kitchen and bathroom remodel including plumbing & electrical. not removing any wlls (bearing or non-bearing)Details
kitchen and bathroom remodel including plumbing & electrical. not removing any wlls (bearing or non-bearing) | $28,000 |
| Dec 21, 2015 | Completed final sign-off Sep 2016 | 542 Union St | kitchen and bath remodel, replace windows, new sub panel, replace radiant heat baseboards (gas). no wals moved, removed, added or infilled. all existing layouts to remain unchanged.Details
kitchen and bath remodel, replace windows, new sub panel, replace radiant heat baseboards (gas). no wals moved, removed, added or infilled. all existing layouts to remain unchanged. | $30,000 |
| Sep 21, 2015 | Completed final sign-off Jun 2018 | 513 Potrero Av | dry rot investigation in kitchen & bathroom. not-to-exceed 100 sq. ft. ceiling, 100 sq. ft. walls in kitchen & bath only. all rated separations shall be maintained.Details
dry rot investigation in kitchen & bathroom. not-to-exceed 100 sq. ft. ceiling, 100 sq. ft. walls in kitchen & bath only. all rated separations shall be maintained. | $2,500 |
| Aug 24, 2015 | Completed final sign-off Sep 2015 | 1450 Post St | revision to application no. 201009221438. no gfi on balcony. no wall cabinet bathroom, no new lights and struct. work. cap water line to balcony.Details
revision to application no. 201009221438. no gfi on balcony. no wall cabinet bathroom, no new lights and struct. work. cap water line to balcony. | $100 |
| May 15, 2015 | Completed final sign-off Oct 2015 | 57 Bruce Av | ground floor remodel - add one game room, one gym room & one half bath (no more than 25 square feet in size) at ground floor per plan.Details
ground floor remodel - add one game room, one gym room & one half bath (no more than 25 square feet in size) at ground floor per plan. | $35,000 |
| Feb 2, 2015 | Completed final sign-off Aug 2015 | 246 Stonecrest Dr | 1)dining and living room renovation. 2)replace tile and fixutures in upper floor bathrooms.Details
1)dining and living room renovation. 2)replace tile and fixutures in upper floor bathrooms. | $75,000 |
| Jan 30, 2015 | Completed final sign-off May 2015 | 21 Whitney St | repair shower in 2/f bath, no structural work.Details
repair shower in 2/f bath, no structural work. | $3,000 |
| Sep 15, 2014 | Completed final sign-off Oct 2014 | 1450 Post St | remodel bath - convert bathtub to showerDetails
remodel bath - convert bathtub to shower | $5,000 |
| Sep 9, 2014 | Expired or cancelled expired Oct 2016 | 1376 Shafter Av | remodel bath, kitchen and repair dry rot at rear stairs, no change on walls.Details
remodel bath, kitchen and repair dry rot at rear stairs, no change on walls. | $25,000 |
| Sep 3, 2014 | Completed final sign-off Aug 2015 | 246 Stonecrest Dr | remodel kitchen and 2 baths on 2nd floor. no structural changes. no walls to be removed.Details
remodel kitchen and 2 baths on 2nd floor. no structural changes. no walls to be removed. | $25,000 |
| Sep 11, 2013 | Never finaled issued Sep 2013, no final | 25 Western Shore Ln | unit #3: bathroom and kitchen remodel - replacement in kind fixtures and fittings and appliances. rev. to application #201306199983. no strucvtural work.Details
unit #3: bathroom and kitchen remodel - replacement in kind fixtures and fittings and appliances. rev. to application #201306199983. no strucvtural work. | $5,000 |
| Apr 11, 2013 | Never finaled issued Apr 2013, no final | 895 Faxon Av | 1) main floor and 2nd floor remodel consisting of a new stair layout, 2 new bathrooms and rearranging bedroom layout on 2nd floor. upgrade electrical on main and 2nd floor.replace furnace to hydronic system.Details
1) main floor and 2nd floor remodel consisting of a new stair layout, 2 new bathrooms and rearranging bedroom layout on 2nd floor. upgrade electrical on main and 2nd floor.replace furnace to hydronic system. | $60,000 |
| Nov 28, 2012 | Completed final sign-off Aug 2013 | 2542 Sacramento St | remodel kitchen & bath, new hardwood floor, recess lighting throughout condo totaling 25 led lighting compliant to title 24, relocate electrical panel from closet to hallway.Details
remodel kitchen & bath, new hardwood floor, recess lighting throughout condo totaling 25 led lighting compliant to title 24, relocate electrical panel from closet to hallway. | $30,000 |
| Aug 13, 2012 | Expired or cancelled expired Sep 2021 | 1450 Post St | kitchen and bathroom remodel. bath tub to be replaced with shower (same szie as the bath tub, kitchen: replace counter top, cabinets, sink & oven. bath: replace toilet, tub & sink. no structrual work.Details
kitchen and bathroom remodel. bath tub to be replaced with shower (same szie as the bath tub, kitchen: replace counter top, cabinets, sink & oven. bath: replace toilet, tub & sink. no structrual work. | $9,000 |
| Aug 2, 2012 | Never finaled issued Aug 2012, no final | 2814 Laguna St | demo non-bearing wall in existing living room & bathroom to create a larger living room area. remodel existing bathroom replace existing beam in master bathroom. raise floor soffit beam to flush beam.Details
demo non-bearing wall in existing living room & bathroom to create a larger living room area. remodel existing bathroom replace existing beam in master bathroom. raise floor soffit beam to flush beam. | $40,000 |
| Jul 2, 2012 | Completed final sign-off Jan 2013 | 570 Mangels Av | revision to pa #2011.1102.8143 -convert (e) hallway & storage in lower flr to (n)office & family rm totaling to 422 sf; add (n) bathroom in lower flr, replace (e) fau to (n) hydronic heating system, replace (e) water tank to (n) on-demand water heater, revise proposed rear stair/deck (reduce size).Details
revision to pa #2011.1102.8143 -convert (e) hallway & storage in lower flr to (n)office & family rm totaling to 422 sf; add (n) bathroom in lower flr, replace (e) fau to (n) hydronic heating system, replace (e) water tank to (n) on-demand water heater, revise proposed rear stair/deck (reduce size). | $40,000 |
| May 22, 2012 | Completed final sign-off Dec 2012 | 179 Caine Av | convert existing storage area in new bedroom, den, bathroom, closets. reframe interior stair. new window at front. new window and door at rear.Details
convert existing storage area in new bedroom, den, bathroom, closets. reframe interior stair. new window at front. new window and door at rear. | $20,000 |
| Mar 26, 2012 | Completed final sign-off May 2012 | 2396 Pine St | #104- bathroom remodel, no structural work, no change on walls and opening.Details
#104- bathroom remodel, no structural work, no change on walls and opening. | $9,000 |
| Mar 12, 2012 | Never finaled issued May 2012, no final | 586 06th St | change of occupancy from m to a-3 with less than 49 occupants. new yoga studio (1700 sf) 2 unisex toilets, 2 unisex assissible shower/ bathroom. install new power door at entry,instll new incline stair at entry, install new lighting, instl new hvac, install fire rated doors at extg rear exit.Details
change of occupancy from m to a-3 with less than 49 occupants. new yoga studio (1700 sf) 2 unisex toilets, 2 unisex assissible shower/ bathroom. install new power door at entry,instll new incline stair at entry, install new lighting, instl new hvac, install fire rated doors at extg rear exit. | $100,000 |
| Jan 30, 2012 | Expired or cancelled expired Jun 2014 | 1097 Green St | bathroom remodel, electrical sub panel with new no structural work, replace, circuit for light and receptacle in the bathroomDetails
bathroom remodel, electrical sub panel with new no structural work, replace, circuit for light and receptacle in the bathroom | $9,000 |
| Jan 5, 2012 | Completed final sign-off Jul 2012 | 1931 Irving St | interior alateration of a vacant space, construct one unisex bathroom. one storage room,install motion sensor, automatic siding door and store front.Details
interior alateration of a vacant space, construct one unisex bathroom. one storage room,install motion sensor, automatic siding door and store front. | $222,000 |
| Dec 23, 2011 | Completed final sign-off May 2018 | 163 Jessie St | demolition of concrete bench. (e) door / entry modifications. (power - operated handrails). new ada unisex bathroom. new bar counters. tables. ground floor renovation. change use from printing shop to bar.Details
demolition of concrete bench. (e) door / entry modifications. (power - operated handrails). new ada unisex bathroom. new bar counters. tables. ground floor renovation. change use from printing shop to bar. | $120,000 |
| Nov 29, 2011 | Never finaled issued May 2013, no final | 1535 Pacific Av | remodel current kitchen & bathrooms. add (2) 1/2 bathrooms & bedrooms. add roof deck. add 1 car space. enclose & remove an exterior staircase. add a pentroom for deck. replace skylight. sprinklers under separate permit.Details
remodel current kitchen & bathrooms. add (2) 1/2 bathrooms & bedrooms. add roof deck. add 1 car space. enclose & remove an exterior staircase. add a pentroom for deck. replace skylight. sprinklers under separate permit. | $200,000 |
| Nov 9, 2011 | Completed final sign-off Nov 2011 | 2228 Clay St | revision to pa# 201011175174. eliminate all work in bathroom. remodel from original descriptionDetails
revision to pa# 201011175174. eliminate all work in bathroom. remodel from original description | |
| Sep 23, 2011 | Completed final sign-off Jan 2012 | 1450 Post St | 1. kitchen and 1 bathroom remodel. unit 416. no structural work. no change in wall and opening layout. a min of 50% of the total rated wattage of permanently installed lighting in kitchen to be high effiency. also he bathroom lighting unless has manuel occupancy control.Details
1. kitchen and 1 bathroom remodel. unit 416. no structural work. no change in wall and opening layout. a min of 50% of the total rated wattage of permanently installed lighting in kitchen to be high effiency. also he bathroom lighting unless has manuel occupancy control. | $22,000 |
| Sep 6, 2011 | Never finaled issued Sep 2011, no final | 400 Avila St | surface replacement of bathroom wall tiles, floor tiles, replace bath fixtures, no structural work. no sink countertop or cabinet replacement. no tub replacement.Details
surface replacement of bathroom wall tiles, floor tiles, replace bath fixtures, no structural work. no sink countertop or cabinet replacement. no tub replacement. | $4,000 |
| May 18, 2011 | Completed final sign-off Aug 2011 | 1450 Post St | bedroom & bathroom remodel unit #608.Details
bedroom & bathroom remodel unit #608. | $40,000 |
| Mar 8, 2011 | Completed final sign-off Jul 2011 | 179 Caine Av | partial demo of non bearing wall to kitchen & bathroom. new kitchen remodel including cabinets, electrical, counter & seat bench. new bathroom remodel including new fixtures & electricalDetails
partial demo of non bearing wall to kitchen & bathroom. new kitchen remodel including cabinets, electrical, counter & seat bench. new bathroom remodel including new fixtures & electrical | $35,000 |
| Dec 29, 2010 | Completed final sign-off Jun 2012 | 1145 Vallejo St | remodel 3rd floor hallway bathroom. new tub sink, recess lights. remodel 1st floor bathroom - new tiles, vanity sink, recess lights. remodel 1st floor with existing sink. no stove. no structural work.Details
remodel 3rd floor hallway bathroom. new tub sink, recess lights. remodel 1st floor bathroom - new tiles, vanity sink, recess lights. remodel 1st floor with existing sink. no stove. no structural work. | $15,000 |
| Nov 30, 2010 | Never finaled issued Mar 2011, no final | 534 07th Av | -remodel (e) kitchen including new tile, cabinets -replace front windows on 1st &2nd floor - upgrade electrical -replace (e) front door -remodel 2nd floor bathroom & 1st floorDetails
-remodel (e) kitchen including new tile, cabinets -replace front windows on 1st &2nd floor - upgrade electrical -replace (e) front door -remodel 2nd floor bathroom & 1st floor | $150,000 |
| Nov 17, 2010 | Completed final sign-off Nov 2011 | 2228 Clay St | kitchen remodel with new gas stove, master bathroom remodel with shower pan & skylight. replace windows at rear, not visible from the street frontal street. no structural workDetails
kitchen remodel with new gas stove, master bathroom remodel with shower pan & skylight. replace windows at rear, not visible from the street frontal street. no structural work | $40,000 |
| Oct 15, 2010 | Completed final sign-off Jul 2011 | 4269 22nd St | interior remodel incl. kitchen and 2 (e) bathrooms, selected replacement windows, new openings and partitions. facade to be restored. legalize (e) 1st fl bathroom.Details
interior remodel incl. kitchen and 2 (e) bathrooms, selected replacement windows, new openings and partitions. facade to be restored. legalize (e) 1st fl bathroom. | $135,000 |
| Aug 19, 2010 | Never finaled issued Oct 2012, no final | 139 08th St | change use of basement from basement storage to additonal restaurant/bar seating. retile bath. establish new occupant load.Details
change use of basement from basement storage to additonal restaurant/bar seating. retile bath. establish new occupant load. | $2,000 |
| Jul 26, 2010 | Expired or cancelled expired Apr 2011 | 3350 Laguna St | unit # 201: replace bath tub with new shower. no structural workDetails
unit # 201: replace bath tub with new shower. no structural work | $7,000 |
| Jul 26, 2010 | Completed final sign-off Sep 2010 | 88 King St | unit # 307: remodel master bath. replace hardwood floors. no structural workDetails
unit # 307: remodel master bath. replace hardwood floors. no structural work | $12,000 |
| Jul 12, 2010 | Completed final sign-off Aug 2010 | 726 33rd Av | comply with condo conversion report#5819, subpanel relocate from closet to hallway, correct electrical outlets in kitchen, bathroom. add missiong vents to toilets, sinks, correct wiring in garage, legalize bathroom and kitchen remodel at both units, no new lighting.Details
comply with condo conversion report#5819, subpanel relocate from closet to hallway, correct electrical outlets in kitchen, bathroom. add missiong vents to toilets, sinks, correct wiring in garage, legalize bathroom and kitchen remodel at both units, no new lighting. | $10,000 |
| Apr 22, 2010 | Expired or cancelled expired May 2013 | 1998 Broadway | kit. remodel in-kind; fixtures, finishes, cabinets, add laundry to (e) closet @ kit. (ventless electric) lighting, gfi. mst. bath remodel: move toilet, enlarge shower, replace vanity, fixtures, finishes, steam @ shower & 3-shower, 2-fans, (n) high efficacy lights, (n) flrs. throughout (n) lts. @ livDetails
kit. remodel in-kind; fixtures, finishes, cabinets, add laundry to (e) closet @ kit. (ventless electric) lighting, gfi. mst. bath remodel: move toilet, enlarge shower, replace vanity, fixtures, finishes, steam @ shower & 3-shower, 2-fans, (n) high efficacy lights, (n) flrs. throughout (n) lts. @ liv | $20,000 |
| Feb 16, 2010 | Completed final sign-off Jul 2010 | 1970 Sacramento St | investigate tear-out for dry-rot in bathroom. no structural tear-out. bathroom remodel with new plumbing fixtures and new electrical. high efficancy lighting of occupancy sensor control per cec 150 (k).Details
investigate tear-out for dry-rot in bathroom. no structural tear-out. bathroom remodel with new plumbing fixtures and new electrical. high efficancy lighting of occupancy sensor control per cec 150 (k). | $9,800 |
| Aug 18, 2009 | Completed final sign-off Mar 2010 | 1860 Washington St | proposed kitchen, replace cabinets hallway bathroom. demo non-bearing wall in living rm. & kitchen.Details
proposed kitchen, replace cabinets hallway bathroom. demo non-bearing wall in living rm. & kitchen. | $20,000 |
| Jul 24, 2009 | Completed final sign-off Apr 2010 | 9 Iris Av | work on unit#9 only. kitchen remodel, bath remodel. relocate electrical subpanel. add lights in living room. no structural work. provide h.e light per t-24.Details
work on unit#9 only. kitchen remodel, bath remodel. relocate electrical subpanel. add lights in living room. no structural work. provide h.e light per t-24. | $18,000 |
| Jun 29, 2009 | Completed final sign-off Apr 2010 | 1919 Union St | tenant improvement restaurant ( american cup cake ) on first floor. add ada bathroom, kitchen, hood, counters, tables and seats for less than 49 seats.Details
tenant improvement restaurant ( american cup cake ) on first floor. add ada bathroom, kitchen, hood, counters, tables and seats for less than 49 seats. | $125,000 |
| May 14, 2009 | Completed final sign-off Apr 2010 | 2864 24th St | add forced air unit, remodel kitchn, bath. repair wndws at rear. add laundry, update electrical forced air unit-70000 btu size. to comply with complaint #200883961Details
add forced air unit, remodel kitchn, bath. repair wndws at rear. add laundry, update electrical forced air unit-70000 btu size. to comply with complaint #200883961 | $25,000 |
| Dec 16, 2008 | Completed final sign-off May 2010 | 28 Parker Av | unit 104 - interior remodel: relocation of kitchen at living room area. (e) kitchen become a new bedroom #2 and (e) closet to convert into new bathroom. removal of non-bearing walls. built a new partition walls to create new closet/laundry areas. installation of new gas fireplace.Details
unit 104 - interior remodel: relocation of kitchen at living room area. (e) kitchen become a new bedroom #2 and (e) closet to convert into new bathroom. removal of non-bearing walls. built a new partition walls to create new closet/laundry areas. installation of new gas fireplace. | $49,000 |
| Dec 16, 2008 | Completed final sign-off Jun 2010 | 28 Parker Av | apt 204 - interior remodel: relocation of kitchen at living room area. (e) kitchen become a new bedroom #2 and (e) closet to convert into new bathroom. removal of non-bearing walls. built a (n) partition walls to create new closet/laundry areas. install a new gas fireplace.Details
apt 204 - interior remodel: relocation of kitchen at living room area. (e) kitchen become a new bedroom #2 and (e) closet to convert into new bathroom. removal of non-bearing walls. built a (n) partition walls to create new closet/laundry areas. install a new gas fireplace. | $49,000 |
| Dec 11, 2008 | Completed final sign-off Jun 2010 | 28 Parker Av | apt #304 - interior remodel only - relocation of ktichen at lviing room area. (e) kitchen to become a new bedroom #2 and (e) closet to convert into new bath. removal of a non-bearing wall built new partition walls to create new closet/laundry. installation of a new gas fire place.Details
apt #304 - interior remodel only - relocation of ktichen at lviing room area. (e) kitchen to become a new bedroom #2 and (e) closet to convert into new bath. removal of a non-bearing wall built new partition walls to create new closet/laundry. installation of a new gas fire place. | $49,000 |
| Nov 21, 2008 | Completed final sign-off Feb 2009 | 33 Iris Av | 1)demo extg bathroom and split into 2 bathroom unis.2) demo extg bathroom wndw and add 2 new wndow.3)demo extg wall between kichen and dining room. 4)remove extg built in seating in kchn. 5) replace kchn counters and cabinetsDetails
1)demo extg bathroom and split into 2 bathroom unis.2) demo extg bathroom wndw and add 2 new wndow.3)demo extg wall between kichen and dining room. 4)remove extg built in seating in kchn. 5) replace kchn counters and cabinets | $40,000 |
| Nov 19, 2008 | Expired or cancelled expired Jun 2011 | 28 Parker Av | unit #202-interior remodel only-relocation of kitchen at living room area. (e) kitchen to become a new bedroom #2, (e) closet to convert into new bathroom. removal of a non-bearing walls. built new partition walls to create new closet/laundry areas. installation of a new gas fireplaceDetails
unit #202-interior remodel only-relocation of kitchen at living room area. (e) kitchen to become a new bedroom #2, (e) closet to convert into new bathroom. removal of a non-bearing walls. built new partition walls to create new closet/laundry areas. installation of a new gas fireplace | $49,000 |