Block 1036, lot 034
28 Parker Ave
- City’s use
- Multi-Family Residential
- Built
- 1929
- Stories
- 3
- Units
- 12
- Rooms
- 24 bedrooms, 24 bathrooms
- Building
- 13,632 sq ft
- Lot
- 5,510 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
27 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 30, 2023 | Completed final sign-off Mar 2024 | 28 Parker Av | Fire & Security & Alarm Co/ F.S.A.C. | like for like fire alarm system replacement with new control panel, smoke detectors and pull stations at same locations. install radio comm., lf horns in all units. replace existing bells w/ new horn/strobes.Details
like for like fire alarm system replacement with new control panel, smoke detectors and pull stations at same locations. install radio comm., lf horns in all units. replace existing bells w/ new horn/strobes. | $20,000 |
| Feb 21, 2020 | Never finaled issued Feb 2020, no final | 28 Parker Av | street spaceDetails
street space | ||
| Mar 24, 2017 | Completed final sign-off May 2017 | 28 Parker Av | Builder Max Inc. | #301: approximate deck size 8'-0"x2'-0" replace one double french wood door w/2 sidelights in kind with new wood clad door to match (e) style of doors, replace balcony roof deck membrance with torch on roof membrance under door sillDetails
#301: approximate deck size 8'-0"x2'-0" replace one double french wood door w/2 sidelights in kind with new wood clad door to match (e) style of doors, replace balcony roof deck membrance with torch on roof membrance under door sill | $20,000 |
| Oct 12, 2016 | Never finaled issued Oct 2016, no final | 28 Parker Av | street spaceDetails
street space | ||
| Feb 11, 2016 | Completed final sign-off Aug 2016 | 28 Parker Av | American Technologies Inc | unit 201: to replace with like & kind material damaged by a water leak; no structural, electrical or plumbing changes; drywall, baseboards, point, etc.Details
unit 201: to replace with like & kind material damaged by a water leak; no structural, electrical or plumbing changes; drywall, baseboards, point, etc. | $4,000 |
| Sep 4, 2014 | Completed final sign-off Oct 2014 | 28 Parker Av | W C S S Dba Solid Build Construction | unit 102: remove existing ceilings drywall approx 670 sqft. installation of recilient channels, insulation, double layer of dry wall, installation of 1 hr light coversDetails
unit 102: remove existing ceilings drywall approx 670 sqft. installation of recilient channels, insulation, double layer of dry wall, installation of 1 hr light covers | $9,950 |
| May 10, 2012 | Never finaled issued May 2012, no final | 28 Parker Av | street space and sidewalk permitDetails
street space and sidewalk permit | ||
| Jan 4, 2011 | Completed final sign-off Jun 2011 | 28 Parker Av | obtain final inspection for work approved under pa# 2008-1119-6961. all work completeDetails
obtain final inspection for work approved under pa# 2008-1119-6961. all work complete | ||
| Jan 4, 2011 | Completed final sign-off Jun 2011 | 28 Parker Av | obtain final inspection for work approved under pa# 2008-1112-6332. all work completeDetails
obtain final inspection for work approved under pa# 2008-1112-6332. all work complete | ||
| Jan 4, 2011 | Completed final sign-off Jun 2011 | 28 Parker Av | obtain final inspection for work approved under pa# 200902121973. all work complete (unit 103)Details
obtain final inspection for work approved under pa# 200902121973. all work complete (unit 103) | ||
| Jan 4, 2011 | Completed final sign-off Jun 2011 | 28 Parker Av | obtain final inspection for work approved under pa# 2008-1119-6962. all work complete (unit 202)Details
obtain final inspection for work approved under pa# 2008-1119-6962. all work complete (unit 202) | ||
| Dec 17, 2009 | Completed final sign-off Jun 2011 | 28 Parker Av | replace front windows & interior windows in-kind. replace (e) skylights in-kind total of 16. 36-windows @ front. 24-windows @ interior lightwell. 6-sliding doors @ rear.Details
replace front windows & interior windows in-kind. replace (e) skylights in-kind total of 16. 36-windows @ front. 24-windows @ interior lightwell. 6-sliding doors @ rear. | $19,800 | |
| Nov 9, 2009 | Completed final sign-off Sep 2010 | 28 Parker Av | revision to pa# 2009.07.27.3517 per field conditions. show base reinforcement and new post base location per plans.Details
revision to pa# 2009.07.27.3517 per field conditions. show base reinforcement and new post base location per plans. | ||
| Jul 27, 2009 | Completed final sign-off Sep 2010 | 28 Parker Av | remove 4 existing steel postd and replace support with 2 new steel beams and 4 steel posts.Details
remove 4 existing steel postd and replace support with 2 new steel beams and 4 steel posts. | $20,000 | |
| Feb 12, 2009 | Completed final sign-off Jun 2011 | 28 Parker Av | unit #203-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new office and (e) closet to convert into new bathroom. removal of non bearing walls. built new partition walls to create new closet/laundry areas. installation of a new gas fireplaceDetails
unit #203-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new office and (e) closet to convert into new bathroom. removal of non bearing walls. built new partition walls to create new closet/laundry areas. installation of a new gas fireplace | $49,000 | |
| Feb 12, 2009 | Expired or cancelled expired Jun 2011 | 28 Parker Av | unit #103-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new office and (e) closet to convert into new bathroom. removal of non bearing walls. built new partition walls to create new closet/laundry areas. installation of a new gas fireplaceDetails
unit #103-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new office and (e) closet to convert into new bathroom. removal of non bearing walls. built new partition walls to create new closet/laundry areas. installation of a new gas fireplace | $49,000 | |
| Feb 12, 2009 | Completed final sign-off Jun 2011 | 28 Parker Av | unit #303-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new office and (e) closet to convert into new bathroom. removal of non bearing walls. built new partition walls to create new closet/laundry areas. installation of a new gas fireplaceDetails
unit #303-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new office and (e) closet to convert into new bathroom. removal of non bearing walls. built new partition walls to create new closet/laundry areas. installation of a new gas fireplace | $49,000 | |
| Dec 16, 2008 | Completed final sign-off May 2010 | 28 Parker Av | Level 8 Construction Inc | unit 104 - interior remodel: relocation of kitchen at living room area. (e) kitchen become a new bedroom #2 and (e) closet to convert into new bathroom. removal of non-bearing walls. built a new partition walls to create new closet/laundry areas. installation of new gas fireplace.Details
unit 104 - interior remodel: relocation of kitchen at living room area. (e) kitchen become a new bedroom #2 and (e) closet to convert into new bathroom. removal of non-bearing walls. built a new partition walls to create new closet/laundry areas. installation of new gas fireplace. | $49,000 |
| Dec 16, 2008 | Completed final sign-off Jun 2010 | 28 Parker Av | Level 8 Construction Inc | apt 204 - interior remodel: relocation of kitchen at living room area. (e) kitchen become a new bedroom #2 and (e) closet to convert into new bathroom. removal of non-bearing walls. built a (n) partition walls to create new closet/laundry areas. install a new gas fireplace.Details
apt 204 - interior remodel: relocation of kitchen at living room area. (e) kitchen become a new bedroom #2 and (e) closet to convert into new bathroom. removal of non-bearing walls. built a (n) partition walls to create new closet/laundry areas. install a new gas fireplace. | $49,000 |
| Dec 11, 2008 | Completed final sign-off Jun 2010 | 28 Parker Av | Level 8 Construction Inc | apt #304 - interior remodel only - relocation of ktichen at lviing room area. (e) kitchen to become a new bedroom #2 and (e) closet to convert into new bath. removal of a non-bearing wall built new partition walls to create new closet/laundry. installation of a new gas fire place.Details
apt #304 - interior remodel only - relocation of ktichen at lviing room area. (e) kitchen to become a new bedroom #2 and (e) closet to convert into new bath. removal of a non-bearing wall built new partition walls to create new closet/laundry. installation of a new gas fire place. | $49,000 |
| Nov 19, 2008 | Expired or cancelled expired Jun 2011 | 28 Parker Av | Level 8 Construction Inc | unit #202-interior remodel only-relocation of kitchen at living room area. (e) kitchen to become a new bedroom #2, (e) closet to convert into new bathroom. removal of a non-bearing walls. built new partition walls to create new closet/laundry areas. installation of a new gas fireplaceDetails
unit #202-interior remodel only-relocation of kitchen at living room area. (e) kitchen to become a new bedroom #2, (e) closet to convert into new bathroom. removal of a non-bearing walls. built new partition walls to create new closet/laundry areas. installation of a new gas fireplace | $49,000 |
| Nov 19, 2008 | Expired or cancelled expired Jun 2011 | 28 Parker Av | Level 8 Construction Inc | unit #302-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new bedroom #2 and (e) closet to convert into new bathrooom. removal of a non-bearing walls. built new parition walls to create new closet/laundry areas. installation of a new gas fireplaceDetails
unit #302-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new bedroom #2 and (e) closet to convert into new bathrooom. removal of a non-bearing walls. built new parition walls to create new closet/laundry areas. installation of a new gas fireplace | $49,000 |
| Nov 18, 2008 | Completed final sign-off May 2010 | 28 Parker Av | Level 8 Construction Inc | unit #101-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new home office, (e) closet to convert into new bathroom. removal of non-bearing wall, build new partition walls to create new closet/laundry areas. installation of new gas fireplaceDetails
unit #101-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new home office, (e) closet to convert into new bathroom. removal of non-bearing wall, build new partition walls to create new closet/laundry areas. installation of new gas fireplace | $49,000 |
| Nov 18, 2008 | Completed final sign-off Jun 2010 | 28 Parker Av | Level 8 Construction Inc | unit #201-interior remodel only-relocation of kitchen at living room area. (e) kitchen to become new home office, (e) closet to convert into new bathroom. removal of non-bearing wall, built new partition walls to create new closet/laundry areas. installation of new gas fireplaceDetails
unit #201-interior remodel only-relocation of kitchen at living room area. (e) kitchen to become new home office, (e) closet to convert into new bathroom. removal of non-bearing wall, built new partition walls to create new closet/laundry areas. installation of new gas fireplace | $49,000 |
| Nov 18, 2008 | Completed final sign-off Jun 2010 | 28 Parker Av | Wins Construction Inc. | unit #301-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new bedroom 2, (e) closet to convert into new bathroom. removal of non-bearing walls, built new partition walls to create new closet/laundry areas. installation of new gas fireplaceDetails
unit #301-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new bedroom 2, (e) closet to convert into new bathroom. removal of non-bearing walls, built new partition walls to create new closet/laundry areas. installation of new gas fireplace | $69,000 |
| Nov 12, 2008 | Expired or cancelled expired Jun 2011 | 28 Parker Av | Level 8 Construction Inc | #102: interior remodel, relocation of kitchen to living rm area, new bedroom at e kitchen, convert e closet to new bath, removal of non bearing walls. new partition walls to create new closet area/laundry. new gas fireplaceDetails
#102: interior remodel, relocation of kitchen to living rm area, new bedroom at e kitchen, convert e closet to new bath, removal of non bearing walls. new partition walls to create new closet area/laundry. new gas fireplace | $69,000 |
| Jun 14, 2004 | Never finaled issued Sep 2004, no final | 28 Parker Av | Potter Fire Protection | add total 12 fire sprinklers on 3 floors in a res. apt. bldg. in open stair areas onlyDetails
add total 12 fire sprinklers on 3 floors in a res. apt. bldg. in open stair areas only | $5,720 |