Block 2607, lot 029
254 Roosevelt Way
- City’s use
- Multi-Family Residential
- Built
- 1904
- Stories
- 2
- Units
- 3
- Rooms
- 4 bathrooms
- Building
- 2,500 sq ft
- Lot
- 2,750 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 20, 2023 | In progress filed Nov 2023, not yet issued | 254 Roosevelt Wy | Level 8 Construction Inc | reroofing.Details
reroofing. | $10,000 |
| Sep 8, 2023 | Completed final sign-off Jan 2024 | 254 Roosevelt Wy | Level 8 Construction Inc | unit #2 - replace dry rotted back door & 2 windows in kind not visible from street. new door, partial new hardwood floors, new appliances, paint. new wall furnace. no structural workDetails
unit #2 - replace dry rotted back door & 2 windows in kind not visible from street. new door, partial new hardwood floors, new appliances, paint. new wall furnace. no structural work | $20,000 |
| Aug 29, 2023 | Completed final sign-off Mar 2024 | 254 Roosevelt Wy | Level 8 Construction Inc | comply w/nov 202308750 replacement of exterior stair in the top floor unit. replacement consist of new 42' stair railing, new post sistered to existing and add new beam under (e) stringer. replace in kind 4 new windows at rearDetails
comply w/nov 202308750 replacement of exterior stair in the top floor unit. replacement consist of new 42' stair railing, new post sistered to existing and add new beam under (e) stringer. replace in kind 4 new windows at rear | $7,000 |
| Nov 15, 2022 | Completed final sign-off Jan 2024 | 254 Roosevelt Wy | Level 8 Construction Inc | unit 4: amend pa 202204122080, bathroom remodel: convert tub to shower, new fixtures, replace tiles on walls and floorsDetails
unit 4: amend pa 202204122080, bathroom remodel: convert tub to shower, new fixtures, replace tiles on walls and floors | $5,000 |
| Apr 12, 2022 | Completed final sign-off Jan 2024 | 254 Roosevelt Wy | Level 8 Construction Inc | # 4: minor repairs <50% to interior, common stairs, not visible from street, replace kichen appliances, replace gas wall furnaceDetails
# 4: minor repairs <50% to interior, common stairs, not visible from street, replace kichen appliances, replace gas wall furnace | $10,000 |
| Apr 8, 2022 | Completed final sign-off Jan 2023 | 254 Roosevelt Wy | Level 8 Construction Inc | front stairs dry rot repair, not exceeding 50%.Details
front stairs dry rot repair, not exceeding 50%. | $40,000 |
| Feb 12, 2019 | Expired or cancelled cancelled Nov 2024 | 254 Roosevelt Wy | horizontal addition to existing 3 story/3 unit home, create 2 new basement levels below grade (total 5) aligning with neighbors. top floor is set back to avoid shadowsDetails
horizontal addition to existing 3 story/3 unit home, create 2 new basement levels below grade (total 5) aligning with neighbors. top floor is set back to avoid shadows | $350,000 | |
| Apr 1, 2010 | Completed final sign-off Nov 2010 | 254 Roosevelt Wy | merging unit 2 & 3 by removing sheetrock to reveal (e) doorways between living rooms of unit 2 & 3 & between kitchens of unit 2 & 3. remove kitchen appliances & fixtures unit 2. convert living room & kitchen of unit 2 to bedrooms.Details
merging unit 2 & 3 by removing sheetrock to reveal (e) doorways between living rooms of unit 2 & 3 & between kitchens of unit 2 & 3. remove kitchen appliances & fixtures unit 2. convert living room & kitchen of unit 2 to bedrooms. | $300 | |
| Oct 3, 2008 | Never finaled issued Oct 2008, no final | 254 Roosevelt Wy | street spaceDetails
street space | ||
| Sep 18, 2008 | Completed final sign-off Nov 2008 | 254 Roosevelt Wy | 2nd floor, unit 2 &3 - unit 3: reconfigure bath into kitchen, kitchen to bath. add new wall with pocket door at new bath location. upgrade elec/plumb. unit 2: remodel bathr, remove wall and doorway.Details
2nd floor, unit 2 &3 - unit 3: reconfigure bath into kitchen, kitchen to bath. add new wall with pocket door at new bath location. upgrade elec/plumb. unit 2: remodel bathr, remove wall and doorway. | $6,000 | |
| Apr 10, 2007 | Completed final sign-off May 2007 | 254 Roosevelt Wy | Pella Window & Door Company | unit #4- remove & replace 3 (e) windows with new pella wood windows. all replacement are like for like with no change in the size or location of the opening. u min. 0.67.Details
unit #4- remove & replace 3 (e) windows with new pella wood windows. all replacement are like for like with no change in the size or location of the opening. u min. 0.67. | $7,200 |
| Apr 28, 2006 | Completed final sign-off Jun 2006 | 254 Roosevelt Wy | Pacific General Elec Co | (unit# 4 only). install new electrical wiring in bathroom. install new plumbing & relocate bath tub in bathroom. install new drywall & insullation in bathroom. (bathroom area only). install new floor with new tile in bathroom on 3rd floor.Details
(unit# 4 only). install new electrical wiring in bathroom. install new plumbing & relocate bath tub in bathroom. install new drywall & insullation in bathroom. (bathroom area only). install new floor with new tile in bathroom on 3rd floor. | $18,000 |
| Apr 14, 2006 | Never finaled issued Apr 2006, no final | 254 Roosevelt Wy | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Level 8 Construction Inc (6), Pacific General Elec Co, Pella Window & Door Company
- Architects
- Neeraj Bhatia
- Engineers
- John Lau
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.