Block 1642, lot 001
101 Balboa St
- City’s use
- Multi-Family Residential
- Built
- 1906
- Stories
- 3
- Units
- 7
- Rooms
- 8 bathrooms
- Building
- 6,325 sq ft
- Lot
- 2,374 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 4, 2026 | Completed final sign-off Feb 2026 | 101 Balboa St | Peak General Contractors Inc | to comply with nov # 202542712. remove (e) dryer ducts and exterior wall vents. restore the fire resistive assembly of the exterior wall (exterior siding and drywall).Details
to comply with nov # 202542712. remove (e) dryer ducts and exterior wall vents. restore the fire resistive assembly of the exterior wall (exterior siding and drywall). | $1,000 |
| Oct 24, 2024 | Completed final sign-off Nov 2024 | 109 Balboa St | Project Contractor Inc | unit #: 5; as built revise of 202406114187. add (1) upright at attic and (2) pendent sprinkler in bedroom.Details
unit #: 5; as built revise of 202406114187. add (1) upright at attic and (2) pendent sprinkler in bedroom. | |
| Aug 16, 2024 | Completed final sign-off Nov 2024 | 101 Balboa St | Crime Watch Security Sys Llc | upgrade (e) fire alarm system to comply with sffc 1103.7.6.1Details
upgrade (e) fire alarm system to comply with sffc 1103.7.6.1 | $22,800 |
| Jun 11, 2024 | Completed final sign-off Nov 2024 | 101 Balboa St | Project Contractor Inc | unit #5: installation of 11 fire sprinklers at ground floor. new dwelling unit under pa# 202205204673 per nfpa 13 2022 & underground pipe per nfpa 24 (trench backfill & sidewalk repair under separate permit)Details
unit #5: installation of 11 fire sprinklers at ground floor. new dwelling unit under pa# 202205204673 per nfpa 13 2022 & underground pipe per nfpa 24 (trench backfill & sidewalk repair under separate permit) | $8,700 |
| Jul 20, 2022 | Completed final sign-off Dec 2024 | 101 Balboa St | Peak General Contractors Inc | mandatory seismic retrofit. soft story retrofit per sfebc chapter 4d 2019 cebc appendix a-4 (commercial portion)Details
mandatory seismic retrofit. soft story retrofit per sfebc chapter 4d 2019 cebc appendix a-4 (commercial portion) | $30,000 |
| May 20, 2022 | Completed final sign-off Dec 2024 | 101 Balboa St | Peak General Contractors Inc | conversion of commercial space to add an adu unit at the first floor per the local adu program. work on first floor only to include adding one living room, one kitchen, two bedrooms, one office and two batrhrooms.Details
conversion of commercial space to add an adu unit at the first floor per the local adu program. work on first floor only to include adding one living room, one kitchen, two bedrooms, one office and two batrhrooms. | $80,000 |
| Apr 20, 2022 | Completed final sign-off Dec 2024 | 101 Balboa St | Peak General Contractors Inc | mandatory seismic retrofit per sfebc ch 4d, 2019 cebc appedix a4. (residential portion)Details
mandatory seismic retrofit per sfebc ch 4d, 2019 cebc appedix a4. (residential portion) | $30,000 |
| Sep 16, 2019 | Never finaled issued Sep 2019, no final | 105 Balboa St | street spaceDetails
street space | ||
| Jul 30, 2019 | Never finaled issued Jul 2019, no final | 105 Balboa St | streetspaceDetails
streetspace | ||
| Jul 30, 2019 | Never finaled filed Jul 2019, never issued | 105 Balboa St | streetspaceDetails
streetspace | ||
| Jun 24, 2019 | Completed final sign-off Apr 2020 | 101 Balboa St | in-kind replacement of 15 windows, aluminum clad wood windows to match (e) size and shape of window openingsDetails
in-kind replacement of 15 windows, aluminum clad wood windows to match (e) size and shape of window openings | $7,500 | |
| May 2, 2019 | Completed final sign-off Apr 2020 | 101 Balboa St | Level 8 Construction Inc | 3 skylights and new storage rooms at approved dormers (pa#201902062168), infill gap between 3/f structures to accomodate new bedrooms.Details
3 skylights and new storage rooms at approved dormers (pa#201902062168), infill gap between 3/f structures to accomodate new bedrooms. | $30,000 |
| Apr 25, 2019 | Never finaled issued Apr 2019, no final | 105 Balboa St | street spaceDetails
street space | ||
| Mar 29, 2019 | Expired or cancelled cancelled Jan 2026 | 101 Balboa St | remove and replace extg windows in kind at unit 105 at 2nd floor with vinyl windows. unit is located at 3rd floor west side of structure(facing balboa street) 13 total windows to be replaced.Details
remove and replace extg windows in kind at unit 105 at 2nd floor with vinyl windows. unit is located at 3rd floor west side of structure(facing balboa street) 13 total windows to be replaced. | $15,000 | |
| Mar 18, 2019 | Completed final sign-off Apr 2020 | 101 Balboa St | expose (e) structural & plumbing conditions in unit #105 to facilitate dormer/bathroom filed on pa#20190206168Details
expose (e) structural & plumbing conditions in unit #105 to facilitate dormer/bathroom filed on pa#20190206168 | $1,000 | |
| Feb 6, 2019 | Completed final sign-off Apr 2020 | 101 Balboa St | Level 8 Construction Inc | add 2 roof dormers at attic at west hipped roof. new attic space to have (n) bedroom and spiral stair connection to 3rd floor. (n) bathroom at 3rd floorDetails
add 2 roof dormers at attic at west hipped roof. new attic space to have (n) bedroom and spiral stair connection to 3rd floor. (n) bathroom at 3rd floor | $30,000 |
| Dec 7, 2017 | Completed final sign-off Dec 2017 | 101 Balboa St | for administrative purpose to verify building use as 4 dwelling unit and 3 stores per city records, assessor's , water dept. and dbi site visit.Details
for administrative purpose to verify building use as 4 dwelling unit and 3 stores per city records, assessor's , water dept. and dbi site visit. | ||
| Apr 28, 2010 | Completed final sign-off Sep 2010 | 101 Balboa St | Cenco | replace in like kind. repair blind wall patch, roof no walls being moved. (rewire) as needed. new plumbing fixtures one unit only. unit#103. provide smoke detectors as required. no plans required for this scope of workDetails
replace in like kind. repair blind wall patch, roof no walls being moved. (rewire) as needed. new plumbing fixtures one unit only. unit#103. provide smoke detectors as required. no plans required for this scope of work | $61,500 |
| May 4, 2005 | Never finaled issued May 2005, no final | 101 Balboa St | Nichols-Alan Construciton | replace tile in (e) bath enclosure of unit 105. replace 100 sqft stucco (e) 100 sqft int. sheetroDetails
replace tile in (e) bath enclosure of unit 105. replace 100 sqft stucco (e) 100 sqft int. sheetro | $7,000 |
| May 21, 2001 | Completed final sign-off Feb 2002 | 101 Balboa St | replace dryrot steps & riser&landing at rear stairway per nov #200117535.Details
replace dryrot steps & riser&landing at rear stairway per nov #200117535. | $300 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Peak General Contractors Inc (4), Level 8 Construction Inc (2), Project Contractor Inc (2), Cenco, Crime Watch Security Sys Llc, Nichols-Alan Construciton
- Architects
- Alex Santos
- Engineers
- Jeff Chow (2), Alexander Santos
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.