Green City Construction Inc
- Based in
- Millbrae
- On San Francisco permits
- Dec 2010 to Jul 2026
- Last 24 months
- 12 permits filed
151 permits since 2000: 112 completed, 11 in progress, 21 never finaled, 7 expired or cancelled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
Roof deck permits
15 roof deck permits: 11 completed, 1 in progress, 3 never finaled. Typically 46 days from filing to permit and 472 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2026 | In progress | 346 32nd Av | 2nd & 3rd floor interior remodel, open kitchen, dining & family room, relocate powder room, remodel stair at 2nd floor, remodel 3 bedrooms, add a new master bathroom, remodel existing roofdeck, replace all rear & side windows with aluminum & replace all doors, add a new deck at rear of the house for | $120,000 |
| Aug 19, 2021 | Completed | 1296 Dolores St | g/f: new habitable space. interior remodel of (e) bathrooms, ktichen & add 2 new bathroom on 2/f & 3/f. replace (e) all (e) windows with alum clad wood. add a roof deck. | $200,000 |
| May 21, 2021 | Completed | 149 03rd Av | improvement into habitable space on g/f per plans: interior remodel of kitchen, living room, 1/2bath,new laundry and new stair to g/f.remodeling (e) stair per plan 2/f.remodel bath,bedrooms; add (n) bath, new roof deck over (e) roof on 3/f. | $45,000 |
| Mar 12, 2021 | Never finaled | 350 Day St | one story vertical & horizontal addition with roof deck on (e) 2 story. | $400,000 |
| Feb 26, 2021 | Completed | 102 03rd Av | revision to pa# 202010196784: add 2nd level juliet balcony includes windows into french doors per plan at 2nd fl. change full bathroom to powder room split with wine room at 1st fl. 3rd fl roof convert to roof deck with 42" high solid railing. re-arrange master bathroom layout. add 2 skylights. | $5,000 |
| Oct 24, 2018 | Never finaled | 2427 Bay St | horizontal extension on the 1st flr, stepped horizontal extension on the 2nd flr w/ 5 ft. rear facing deck over 1st flr. fill in (e) deck on 2nd flr on right side. 3rd flr extension incline with neighbor (2415) to right. a roofdeck of 464 sq ft with clr glassrail 42" high. | $162,000 |
| Jun 1, 2018 | Completed | 130 09th Av | 1st fl: add family rm, 1 bdrm, 1 full, one 1/2 bath. new elevator to all 3 floor. 2nd fl:remodel kitchen,bath,reconfigure space. new deck rear. 3rd fl rmdl kitchen bath, add 1 full bath, cantilever deck at rear. new roof deck and replace front windows in kind alum clad wood wndws | $100,000 |
| Oct 16, 2017 | Completed | 34 Walter St | revise interior layout redesigned with pa 2015-0130-7146 r3. to comply with 201469471 - provide new additional attic dormers with access stair per plans. provide new roof deck per plan. | $30,000 |
| May 30, 2017 | Completed | 575 35th Av | remodel & addition living. half bathroom, kitchen & dining & family room at ground floor. remodel 3 bedrooms, 2 bathrooms @ 2nd floor. remodel bedroom & add a bathroom & 3rd floor. replace front windows with aluminum clad wood window. no roof deck | $120,000 |
| Mar 20, 2017 | Completed | 478 Anderson St | remodel kitchen, living room, dining room, bathroom, add a new bath @ 2nd floor. add 2 bathroom, 2 bedrooms, family room at ground floor. add a new roof deck. replace all windows | $120,000 |
| Aug 1, 2014 | Completed | 287 14th Av | revision to app#201307232514. relocation of (3) skylights, new roof at rear deck 4th flr. add roof deck and a fire place. relocate bath @ 4th flr. enlarge window at study @ 2nd flr.removing staircase to yard not reqd. as an exit. revise patio door, add side lts. @ grnd floor- enlard bedroom due to | $4,500 |
| Jun 30, 2014 | Never finaled | 470 Alvarado St | horizontal addition to the side and rear deck on 3rd floor and roof deck per plan shown. remove bay windows on second floor and third floor at the rear per plan. raised the front door overhead opening per plan and elevation. remodel stairways, bathrooms, kitchen, add new skylight per plan. | $130,000 |
| Aug 5, 2013 | Completed | 33 Mallorca Wy | 4th floor:adding roof deck to extg floor. no other changes. | $30,000 |
| Jul 23, 2013 | Completed | 287 14th Av | horizontal addition 15'-0" to rear at 1st fl. develop ground flr & add new 2nd unit. horizontal addtion ~3'0" to rear @ 2nd & 3rd flrs. roof deck over 1st flor ~240 sf. raise roof at reat ~ 24" high ~600 sf covert attic to habitable space & interior remodeling under separate permit. new foundation | $96,900 |
| Sep 21, 2012 | Completed | 2856 Scott St | to construct roof deck accessible by two units @ rear of the building @ rear level. | $60,000 |