Block 1362, lot 039
102 03rd Ave
- City’s use
- Single Family Residential
- Built
- 1902
- Stories
- 3
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 2,676 sq ft
- Lot
- 2,062 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 22, 2021 | Completed final sign-off Jan 2022 | 102 03rd Av | Magnum Construction Group Inc | install new fire alarm for fire sprinkler monitoring system. 1 pull, 1 heat detector and tamper. ref permit 202009033367Details
install new fire alarm for fire sprinkler monitoring system. 1 pull, 1 heat detector and tamper. ref permit 202009033367 | $5,000 |
| Apr 6, 2021 | Completed final sign-off Jan 2022 | 102 03rd Av | Magnum Construction Group Inc | new sprinkler system with nfpa 13r, system throughout the whole house including 1-1/2 underground service.Details
new sprinkler system with nfpa 13r, system throughout the whole house including 1-1/2 underground service. | $25,000 |
| Feb 26, 2021 | Completed final sign-off Jan 2022 | 102 03rd Av | Green City Construction Inc | revision to pa# 202010196784: add 2nd level juliet balcony includes windows into french doors per plan at 2nd fl. change full bathroom to powder room split with wine room at 1st fl. 3rd fl roof convert to roof deck with 42" high solid railing. re-arrange master bathroom layout. add 2 skylights.Details
revision to pa# 202010196784: add 2nd level juliet balcony includes windows into french doors per plan at 2nd fl. change full bathroom to powder room split with wine room at 1st fl. 3rd fl roof convert to roof deck with 42" high solid railing. re-arrange master bathroom layout. add 2 skylights. | $5,000 |
| Oct 19, 2020 | Completed final sign-off Jan 2022 | 102 03rd Av | Green City Construction Inc | improvement into habitable space area as per plan: add 2 new bathrooms, 1 bedroom, family room at g/f. add a new 1/2 bath, connecting stair to basement to be reconfigured. new replacement plus french doors, windows at rear bedroom, remodel 2 (e) bathrooms on 3/f.Details
improvement into habitable space area as per plan: add 2 new bathrooms, 1 bedroom, family room at g/f. add a new 1/2 bath, connecting stair to basement to be reconfigured. new replacement plus french doors, windows at rear bedroom, remodel 2 (e) bathrooms on 3/f. | $70,000 |
| Sep 3, 2020 | Completed final sign-off Jan 2022 | 102 03rd Av | Green City Construction Inc | remodeling (e) kitchen, two bathrooms, living room in kind, repair the front stair 50% or less. replace the existing windows with aluminum clad wood windows. replace the front with wood siding & replace the rear with stucco. hung windows no sliders - no changes to existing front windows with dividedDetails
remodeling (e) kitchen, two bathrooms, living room in kind, repair the front stair 50% or less. replace the existing windows with aluminum clad wood windows. replace the front with wood siding & replace the rear with stucco. hung windows no sliders - no changes to existing front windows with divided | $60,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Green City Construction Inc (3), Magnum Construction Group Inc (2)
- Engineers
- Horon Lee
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.