Green City Construction Inc
- Based in
- Millbrae
- On San Francisco permits
- Dec 2010 to Jul 2026
- Last 24 months
- 12 permits filed
151 permits since 2000: 112 completed, 10 in progress, 22 never finaled, 7 expired or cancelled.
Of the 22 never-finaled permits, 1 is 3 to 5 years old, 16 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
22 deck permits: 17 completed, 2 in progress, 3 never finaled. Typically 24 days from filing to permit and 277 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2026 | In progress filed Jul 2026, not yet issued | 346 32nd Av | 2nd & 3rd floor interior remodel, open kitchen, dining & family room, relocate powder room, remodel stair at 2nd floor, remodel 3 bedrooms, add a new master bathroom, remodel existing roofdeck, replace all rear & side windows with aluminum & replace all doors, add a new deck at rear of the house forDetails
2nd & 3rd floor interior remodel, open kitchen, dining & family room, relocate powder room, remodel stair at 2nd floor, remodel 3 bedrooms, add a new master bathroom, remodel existing roofdeck, replace all rear & side windows with aluminum & replace all doors, add a new deck at rear of the house for | $120,000 |
| Jun 4, 2024 | In progress issued Jun 2025 | 1887 Funston Av | revision to permit# 202108307421: repair dry rot at window sills and 1/f and 4/f decks, strengthen cantilver with c 10 x 25 steel channels.Details
revision to permit# 202108307421: repair dry rot at window sills and 1/f and 4/f decks, strengthen cantilver with c 10 x 25 steel channels. | $20,000 |
| Jun 21, 2022 | Completed final sign-off Jul 2023 | 3150 Baker St | 1st/f: remodel bath, add family, office, 1 bedroom and 1 full bath. 2nd fl: remodel kitchen, bath, add 1 full bath. infill lightwell, repair deck.Details
1st/f: remodel bath, add family, office, 1 bedroom and 1 full bath. 2nd fl: remodel kitchen, bath, add 1 full bath. infill lightwell, repair deck. | $128,000 |
| Jun 17, 2022 | Completed final sign-off Jun 2024 | 1340 Dolores St | replace front windows + door with hung wood with og windows. remodel + add 1 bedroom, bathroom, family room, cooking counter with sink, at ground fl. remodel kitchen, bath & living room at 2nd fl. remodel 2 bathrooms + bedrooms at 3rd fl. repair (e) front + rear decks. repair front stair. 50% lessDetails
replace front windows + door with hung wood with og windows. remodel + add 1 bedroom, bathroom, family room, cooking counter with sink, at ground fl. remodel kitchen, bath & living room at 2nd fl. remodel 2 bathrooms + bedrooms at 3rd fl. repair (e) front + rear decks. repair front stair. 50% less | $200,000 |
| Feb 28, 2022 | Completed final sign-off Oct 2022 | 149 03rd Av | revision to pa#202105210774 with as buid plans and add a new rear deck.Details
revision to pa#202105210774 with as buid plans and add a new rear deck. | $5,000 |
| Jul 31, 2019 | Completed final sign-off Nov 2021 | 1976 Quesada Av | rear deck with staircase to ground, change single door to sliding double door. new windows same size.Details
rear deck with staircase to ground, change single door to sliding double door. new windows same size. | $9,000 |
| Oct 24, 2018 | Never finaled issued Jul 2019, no final | 2427 Bay St | horizontal extension on the 1st flr, stepped horizontal extension on the 2nd flr w/ 5 ft. rear facing deck over 1st flr. fill in (e) deck on 2nd flr on right side. 3rd flr extension incline with neighbor (2415) to right. a roofdeck of 464 sq ft with clr glassrail 42" high.Details
horizontal extension on the 1st flr, stepped horizontal extension on the 2nd flr w/ 5 ft. rear facing deck over 1st flr. fill in (e) deck on 2nd flr on right side. 3rd flr extension incline with neighbor (2415) to right. a roofdeck of 464 sq ft with clr glassrail 42" high. | $162,000 |
| Jun 25, 2018 | Completed final sign-off Aug 2019 | 3945 23rd St | filled-in 1st floor below (e) deck. create a new master bedroom with new bath room. re-work (e) deck guardrailing to provide new glass railing & re-work waterproofing.Details
filled-in 1st floor below (e) deck. create a new master bedroom with new bath room. re-work (e) deck guardrailing to provide new glass railing & re-work waterproofing. | $58,000 |
| Jun 1, 2018 | Completed final sign-off Dec 2020 | 130 09th Av | 1st fl: add family rm, 1 bdrm, 1 full, one 1/2 bath. new elevator to all 3 floor. 2nd fl:remodel kitchen,bath,reconfigure space. new deck rear. 3rd fl rmdl kitchen bath, add 1 full bath, cantilever deck at rear. new roof deck and replace front windows in kind alum clad wood wndwsDetails
1st fl: add family rm, 1 bdrm, 1 full, one 1/2 bath. new elevator to all 3 floor. 2nd fl:remodel kitchen,bath,reconfigure space. new deck rear. 3rd fl rmdl kitchen bath, add 1 full bath, cantilever deck at rear. new roof deck and replace front windows in kind alum clad wood wndws | $100,000 |
| Apr 24, 2018 | Completed final sign-off Aug 2019 | 3945 23rd St | remodel 2nd floor. add new bedrooms and bathroom, laundry at ground floor. replace windows. replace new rear deck, re-stucco rear house and replace the new roof. (tile to remain)Details
remodel 2nd floor. add new bedrooms and bathroom, laundry at ground floor. replace windows. replace new rear deck, re-stucco rear house and replace the new roof. (tile to remain) | $170,000 |
| Mar 2, 2018 | Completed final sign-off Mar 2018 | 575 35th Av | revision to opa 2017-0530-7931. add rear deck at 3rd fl. change location for bathroom, kitchen, doors and windows per plan. change the layout for bathroom for 2nd and 3rd floor.Details
revision to opa 2017-0530-7931. add rear deck at 3rd fl. change location for bathroom, kitchen, doors and windows per plan. change the layout for bathroom for 2nd and 3rd floor. | $2,000 |
| Jan 29, 2018 | Never finaled issued Jul 2018, no final | 58 Lapidge St | fill in space under (e) deck to create additional living space to (e) family room of 132 sqft. move (e) deck stairs to south side w/ (n) metal stairs - non combustible. (e) family room modified to create bedroom & family room. replace (e) rear windows & door @ 1st fl w/ (n) slider as shownDetails
fill in space under (e) deck to create additional living space to (e) family room of 132 sqft. move (e) deck stairs to south side w/ (n) metal stairs - non combustible. (e) family room modified to create bedroom & family room. replace (e) rear windows & door @ 1st fl w/ (n) slider as shown | $15,000 |
| Dec 20, 2017 | Completed final sign-off Aug 2019 | 58 Lapidge St | move (e) deck landing to south side of rear property line.Details
move (e) deck landing to south side of rear property line. | $20,000 |
| Oct 19, 2017 | Completed final sign-off Aug 2018 | 844 Duncan St | modify approved permit 201510028711 with changes to a2.1. add wine cellar, widen entry door and sidelites. 1st fl- a2.2, move e fireplace, increase window size in bedrm 2 and 3, add 10" deep picture balcony, a2.3 relocate m bath, add new bath, take out e roof in front, extend deck to part ofDetails
modify approved permit 201510028711 with changes to a2.1. add wine cellar, widen entry door and sidelites. 1st fl- a2.2, move e fireplace, increase window size in bedrm 2 and 3, add 10" deep picture balcony, a2.3 relocate m bath, add new bath, take out e roof in front, extend deck to part of | $35,000 |
| Mar 31, 2017 | Completed final sign-off Aug 2017 | 335 Ralston St | repair the existing deck, less than 50%. to comply with complaint #201766412Details
repair the existing deck, less than 50%. to comply with complaint #201766412 | $2,000 |
| Sep 4, 2014 | Completed final sign-off Dec 2015 | 470 Alvarado St | revision to app#201406300048 to allow an 18" horiz. (north) extension of the extg master bedroom deck with no fire walls.Details
revision to app#201406300048 to allow an 18" horiz. (north) extension of the extg master bedroom deck with no fire walls. | $1,800 |
| Aug 1, 2014 | Completed final sign-off Aug 2018 | 287 14th Av | revision to app#201307232514. relocation of (3) skylights, new roof at rear deck 4th flr. add roof deck and a fire place. relocate bath @ 4th flr. enlarge window at study @ 2nd flr.removing staircase to yard not reqd. as an exit. revise patio door, add side lts. @ grnd floor- enlard bedroom due toDetails
revision to app#201307232514. relocation of (3) skylights, new roof at rear deck 4th flr. add roof deck and a fire place. relocate bath @ 4th flr. enlarge window at study @ 2nd flr.removing staircase to yard not reqd. as an exit. revise patio door, add side lts. @ grnd floor- enlard bedroom due to | $4,500 |
| Jun 30, 2014 | Never finaled issued Jul 2014, no final | 470 Alvarado St | horizontal addition to the side and rear deck on 3rd floor and roof deck per plan shown. remove bay windows on second floor and third floor at the rear per plan. raised the front door overhead opening per plan and elevation. remodel stairways, bathrooms, kitchen, add new skylight per plan.Details
horizontal addition to the side and rear deck on 3rd floor and roof deck per plan shown. remove bay windows on second floor and third floor at the rear per plan. raised the front door overhead opening per plan and elevation. remodel stairways, bathrooms, kitchen, add new skylight per plan. | $130,000 |
| Feb 19, 2013 | Completed final sign-off May 2013 | 679 23rd Av | add a new bedroom, bath, laundry at ground fl. remodel kitchen, relocate half bath at 2nd fl. 2 new full baths and remodel (e) bath, add new laundry at 3rd fl. replace all new aluminum clad wood window, replace rear deck, new stucco at rear and side of houseDetails
add a new bedroom, bath, laundry at ground fl. remodel kitchen, relocate half bath at 2nd fl. 2 new full baths and remodel (e) bath, add new laundry at 3rd fl. replace all new aluminum clad wood window, replace rear deck, new stucco at rear and side of house | $72,000 |
| Sep 5, 2012 | Completed final sign-off Nov 2012 | 835 41st Av | remodel the 2nd floor kitchen, bathroom & remodel the ground floor bathroom. replace the 2nd floor bedroom & kitchen windows. replace the ground floor bedroom & family windows. repair the rear deckDetails
remodel the 2nd floor kitchen, bathroom & remodel the ground floor bathroom. replace the 2nd floor bedroom & kitchen windows. replace the ground floor bedroom & family windows. repair the rear deck | $25,780 |
| Apr 2, 2012 | Completed final sign-off Sep 2012 | 266 30th Av | remodel kitchen & bathroom. add new rear deck. replace 3rd floor ceiling sheetrock. replace the (e) side rear stair in kind. replace (e) french door in rear & replace 4 rear & side windows.Details
remodel kitchen & bathroom. add new rear deck. replace 3rd floor ceiling sheetrock. replace the (e) side rear stair in kind. replace (e) french door in rear & replace 4 rear & side windows. | $50,000 |
| Mar 10, 2011 | Completed final sign-off Feb 2012 | 219 Tingley St | add 1st & 2nd floor extension on 1st floor 20 ft rear expansion & on 2nd floor 16'-6" living space & 3'6" deck.Details
add 1st & 2nd floor extension on 1st floor 20 ft rear expansion & on 2nd floor 16'-6" living space & 3'6" deck. | $85,000 |