Green City Construction Inc
- Based in
- Millbrae
- On San Francisco permits
- Dec 2010 to Jul 2026
- Last 24 months
- 12 permits filed
151 permits since 2000: 112 completed, 10 in progress, 22 never finaled, 7 expired or cancelled.
Of the 22 never-finaled permits, 1 is 3 to 5 years old, 16 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
38 stairs permits: 28 completed, 3 in progress, 5 never finaled, 2 expired or cancelled. Typically 32 days from filing to permit and 371 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2026 | In progress filed Jul 2026, not yet issued | 346 32nd Av | 2nd & 3rd floor interior remodel, open kitchen, dining & family room, relocate powder room, remodel stair at 2nd floor, remodel 3 bedrooms, add a new master bathroom, remodel existing roofdeck, replace all rear & side windows with aluminum & replace all doors, add a new deck at rear of the house forDetails
2nd & 3rd floor interior remodel, open kitchen, dining & family room, relocate powder room, remodel stair at 2nd floor, remodel 3 bedrooms, add a new master bathroom, remodel existing roofdeck, replace all rear & side windows with aluminum & replace all doors, add a new deck at rear of the house for | $120,000 |
| Dec 26, 2025 | In progress issued Feb 2026 | 860 Moultrie St | 1st floor/basement improvement w (n) family room w kitchenette, bedrm, bathrm, & vestibule/laundry. (n) reduced garage area (n) door & windows replace rear (n) water heater & furnace (n) interior connecting stair. comply w nov#20201961 replace stairs. replace front door, windows, garage doorDetails
1st floor/basement improvement w (n) family room w kitchenette, bedrm, bathrm, & vestibule/laundry. (n) reduced garage area (n) door & windows replace rear (n) water heater & furnace (n) interior connecting stair. comply w nov#20201961 replace stairs. replace front door, windows, garage door | $150,000 |
| Dec 26, 2025 | In progress issued Mar 2026 | 346 32nd Av | replace 10 front wood windows, door, garage door. 1st/f: rework entry/foyer, new interior hallway to habitable space bedroom, remodel e) stair to 2nd/f, relocate laundry area, remodel e) bedroom, new bathroom, remodel e) 1 car garage to 2 cars. basement/f: remodel e) exercise room w/ new bathroomDetails
replace 10 front wood windows, door, garage door. 1st/f: rework entry/foyer, new interior hallway to habitable space bedroom, remodel e) stair to 2nd/f, relocate laundry area, remodel e) bedroom, new bathroom, remodel e) 1 car garage to 2 cars. basement/f: remodel e) exercise room w/ new bathroom | $150,000 |
| Sep 30, 2024 | Completed final sign-off Nov 2025 | 3300 Jackson St | ref 202405152223- ground floor (e) to remain except to provide a (n) elevator to 4 floors. 1st floor to redesign and remodel kitchen, bathroom, bedroom, powder room. 2nd floor to redesign and remodel bedrooms, bathrooms, laundry and (n) int. stair w/handrails to top floor. 3rd floor redesign (n) denDetails
ref 202405152223- ground floor (e) to remain except to provide a (n) elevator to 4 floors. 1st floor to redesign and remodel kitchen, bathroom, bedroom, powder room. 2nd floor to redesign and remodel bedrooms, bathrooms, laundry and (n) int. stair w/handrails to top floor. 3rd floor redesign (n) den | $250,000 |
| Aug 29, 2024 | Completed final sign-off Mar 2026 | 2750 Cabrillo St | as built revision to approved 201907024930. 1) eliminate some windows at property line north elev. (2) reconfigure space at kitchen area at 2nd flr and bedroom area at 3rd flr. 3)remove 2nd interior stairs at 3rd flr to/from 4th flrDetails
as built revision to approved 201907024930. 1) eliminate some windows at property line north elev. (2) reconfigure space at kitchen area at 2nd flr and bedroom area at 3rd flr. 3)remove 2nd interior stairs at 3rd flr to/from 4th flr | $10,000 |
| May 15, 2024 | Completed final sign-off Nov 2025 | 3300 Jackson St | interior remodel basement improvement into habitable space for new bedroom w bath, family room with kitchenette, powder room and laundry area and wineroom, interior stairDetails
interior remodel basement improvement into habitable space for new bedroom w bath, family room with kitchenette, powder room and laundry area and wineroom, interior stair | $70,000 |
| Dec 6, 2022 | Completed final sign-off Nov 2023 | 1296 Dolores St | revision to bpa#202108196733, revise interior layout, add new bedroom @ 3/f, add mechanical room @garage for 1296-1298 dolores, revise kitchen, closet, remove stair skylight. dwg's rev. to reflect as built.Details
revision to bpa#202108196733, revise interior layout, add new bedroom @ 3/f, add mechanical room @garage for 1296-1298 dolores, revise kitchen, closet, remove stair skylight. dwg's rev. to reflect as built. | |
| Nov 29, 2022 | Completed final sign-off Jul 2023 | 3150 Baker St | revision to bpa#202206216769 reconfigure layouts, replace stairs to spiral staircase, change lightwell exterior wall from siding to stuccoDetails
revision to bpa#202206216769 reconfigure layouts, replace stairs to spiral staircase, change lightwell exterior wall from siding to stucco | $15,000 |
| Jun 17, 2022 | Completed final sign-off Jun 2024 | 1340 Dolores St | replace front windows + door with hung wood with og windows. remodel + add 1 bedroom, bathroom, family room, cooking counter with sink, at ground fl. remodel kitchen, bath & living room at 2nd fl. remodel 2 bathrooms + bedrooms at 3rd fl. repair (e) front + rear decks. repair front stair. 50% lessDetails
replace front windows + door with hung wood with og windows. remodel + add 1 bedroom, bathroom, family room, cooking counter with sink, at ground fl. remodel kitchen, bath & living room at 2nd fl. remodel 2 bathrooms + bedrooms at 3rd fl. repair (e) front + rear decks. repair front stair. 50% less | $200,000 |
| Jun 16, 2022 | Completed final sign-off Dec 2022 | 3159 Baker St | repair the extg front stair with brick to match existing. less than 50%. repair in-kind.Details
repair the extg front stair with brick to match existing. less than 50%. repair in-kind. | $5,000 |
| Feb 28, 2022 | Completed final sign-off Jun 2023 | 1864 09th Av | replace extg windows and patio doors with aluminum clad wood window. 1st floor change to 2 car garage, add cooking & sink bar counter, remodel 2 bedrooms & bath. add family room & interior stair connecting to living room. add 3 dormer with windows; voluntariy strengthen each level by adding new plwDetails
replace extg windows and patio doors with aluminum clad wood window. 1st floor change to 2 car garage, add cooking & sink bar counter, remodel 2 bedrooms & bath. add family room & interior stair connecting to living room. add 3 dormer with windows; voluntariy strengthen each level by adding new plw | $80,000 |
| May 21, 2021 | Completed final sign-off Nov 2022 | 149 03rd Av | improvement into habitable space on g/f per plans: interior remodel of kitchen, living room, 1/2bath,new laundry and new stair to g/f.remodeling (e) stair per plan 2/f.remodel bath,bedrooms; add (n) bath, new roof deck over (e) roof on 3/f.Details
improvement into habitable space on g/f per plans: interior remodel of kitchen, living room, 1/2bath,new laundry and new stair to g/f.remodeling (e) stair per plan 2/f.remodel bath,bedrooms; add (n) bath, new roof deck over (e) roof on 3/f. | $45,000 |
| Apr 1, 2021 | Completed final sign-off Mar 2023 | 536 40th Av | replace (e) wood siding to new wood siding repair (e) roof shingles repair (e) staircase less than 50% not visible from the streetDetails
replace (e) wood siding to new wood siding repair (e) roof shingles repair (e) staircase less than 50% not visible from the street | $21,000 |
| Nov 24, 2020 | Completed final sign-off Mar 2023 | 536 40th Av | new staircase from 2nd to 1st floor. 2nd floor: move (e) kitchen from rear to front. remove (e) fireplace. convert (e) kitchen to study rm on 2nd flr. relocate (e) bathroom from 2nd floor to 1st. relocate (e) bedroom to 1st floor & incorporate open area.Details
new staircase from 2nd to 1st floor. 2nd floor: move (e) kitchen from rear to front. remove (e) fireplace. convert (e) kitchen to study rm on 2nd flr. relocate (e) bathroom from 2nd floor to 1st. relocate (e) bedroom to 1st floor & incorporate open area. | $72,000 |
| Oct 19, 2020 | Completed final sign-off Jan 2022 | 102 03rd Av | improvement into habitable space area as per plan: add 2 new bathrooms, 1 bedroom, family room at g/f. add a new 1/2 bath, connecting stair to basement to be reconfigured. new replacement plus french doors, windows at rear bedroom, remodel 2 (e) bathrooms on 3/f.Details
improvement into habitable space area as per plan: add 2 new bathrooms, 1 bedroom, family room at g/f. add a new 1/2 bath, connecting stair to basement to be reconfigured. new replacement plus french doors, windows at rear bedroom, remodel 2 (e) bathrooms on 3/f. | $70,000 |
| Sep 3, 2020 | Completed final sign-off Jan 2022 | 102 03rd Av | remodeling (e) kitchen, two bathrooms, living room in kind, repair the front stair 50% or less. replace the existing windows with aluminum clad wood windows. replace the front with wood siding & replace the rear with stucco. hung windows no sliders - no changes to existing front windows with dividedDetails
remodeling (e) kitchen, two bathrooms, living room in kind, repair the front stair 50% or less. replace the existing windows with aluminum clad wood windows. replace the front with wood siding & replace the rear with stucco. hung windows no sliders - no changes to existing front windows with divided | $60,000 |
| Sep 3, 2020 | Completed final sign-off Jan 2021 | 1035 Natoma St | to comply with nov #202041311 & city planning complaint 2020-007318enf - rebuild/repair front entry stair in kind.Details
to comply with nov #202041311 & city planning complaint 2020-007318enf - rebuild/repair front entry stair in kind. | $5,000 |
| Jul 8, 2020 | Completed final sign-off Jan 2021 | 307 Faxon Av | replace 17 windows w/ aluminum-clad wood windows; casement-fixed-casement @ front bay w/ dh in single window above stairs; replace wood siding at rear elevation & restucco front siding (same texture as existing); all wood window trim and decorative accents -wood posts/grill above stair under dhDetails
replace 17 windows w/ aluminum-clad wood windows; casement-fixed-casement @ front bay w/ dh in single window above stairs; replace wood siding at rear elevation & restucco front siding (same texture as existing); all wood window trim and decorative accents -wood posts/grill above stair under dh | $33,000 |
| Feb 24, 2020 | Never finaled filed Feb 2020, never issued | 34 Walter St | change wood stair to metal spiral stair per plan to comply with nov 201247583 item 2 rev 201805239898Details
change wood stair to metal spiral stair per plan to comply with nov 201247583 item 2 rev 201805239898 | |
| Jul 31, 2019 | Completed final sign-off Nov 2021 | 1976 Quesada Av | rear deck with staircase to ground, change single door to sliding double door. new windows same size.Details
rear deck with staircase to ground, change single door to sliding double door. new windows same size. | $9,000 |
| Jan 29, 2019 | Expired or cancelled withdrawn Aug 2019 | 34 Walter St | change rear wood stair to metal spiral stair. ref complaint 201247583Details
change rear wood stair to metal spiral stair. ref complaint 201247583 | |
| Aug 30, 2018 | Never finaled issued Sep 2018, no final | 2427 Bay St | 1/f: remodel/re-arrange (e) bathrm, closet @ bedrm, and laundry rm; 2/f: remodel/re-arrange (e) kitchen, powder rm & new pantry; 3/f: remodel (e) bathrm & put in new bathrm, add new residential elevator & spiral staircaseDetails
1/f: remodel/re-arrange (e) bathrm, closet @ bedrm, and laundry rm; 2/f: remodel/re-arrange (e) kitchen, powder rm & new pantry; 3/f: remodel (e) bathrm & put in new bathrm, add new residential elevator & spiral staircase | $160,000 |
| Apr 17, 2018 | Never finaled issued May 2018, no final | 58 Lapidge St | remodel and move extg kitchen and powder room on 2nd floor. put in new slidiers in rear on 2nd floor. remodel 2 extg bathrooms on 3rd floor . put in spiral stairs to attic above. put in 3 dormers. dormer area is 17.36 y. of roof area & rear dormer is well within 457 setbackline.Details
remodel and move extg kitchen and powder room on 2nd floor. put in new slidiers in rear on 2nd floor. remodel 2 extg bathrooms on 3rd floor . put in spiral stairs to attic above. put in 3 dormers. dormer area is 17.36 y. of roof area & rear dormer is well within 457 setbackline. | $283,000 |
| Jan 29, 2018 | Never finaled issued Jul 2018, no final | 58 Lapidge St | fill in space under (e) deck to create additional living space to (e) family room of 132 sqft. move (e) deck stairs to south side w/ (n) metal stairs - non combustible. (e) family room modified to create bedroom & family room. replace (e) rear windows & door @ 1st fl w/ (n) slider as shownDetails
fill in space under (e) deck to create additional living space to (e) family room of 132 sqft. move (e) deck stairs to south side w/ (n) metal stairs - non combustible. (e) family room modified to create bedroom & family room. replace (e) rear windows & door @ 1st fl w/ (n) slider as shown | $15,000 |
| Oct 16, 2017 | Completed final sign-off Mar 2019 | 34 Walter St | revise interior layout redesigned with pa 2015-0130-7146 r3. to comply with 201469471 - provide new additional attic dormers with access stair per plans. provide new roof deck per plan.Details
revise interior layout redesigned with pa 2015-0130-7146 r3. to comply with 201469471 - provide new additional attic dormers with access stair per plans. provide new roof deck per plan. | $30,000 |
| May 30, 2017 | Completed final sign-off Nov 2017 | 478 Anderson St | revision to pa 2017-0320-1891, remove the rear stair & foundation work revision per plan.Details
revision to pa 2017-0320-1891, remove the rear stair & foundation work revision per plan. | |
| Jul 14, 2015 | Completed final sign-off Nov 2016 | 11 Whitney St | renovate (e) kitchen & bath at 2nd floor. remodel (e) area to create (n) bedrooms, bath & laundry at 1st floor. infill below (e) building at rear. (n) interior stair from 1st to 2nd floor.Details
renovate (e) kitchen & bath at 2nd floor. remodel (e) area to create (n) bedrooms, bath & laundry at 1st floor. infill below (e) building at rear. (n) interior stair from 1st to 2nd floor. | $110,000 |
| Aug 1, 2014 | Completed final sign-off Aug 2018 | 287 14th Av | revision to app#201307232514. relocation of (3) skylights, new roof at rear deck 4th flr. add roof deck and a fire place. relocate bath @ 4th flr. enlarge window at study @ 2nd flr.removing staircase to yard not reqd. as an exit. revise patio door, add side lts. @ grnd floor- enlard bedroom due toDetails
revision to app#201307232514. relocation of (3) skylights, new roof at rear deck 4th flr. add roof deck and a fire place. relocate bath @ 4th flr. enlarge window at study @ 2nd flr.removing staircase to yard not reqd. as an exit. revise patio door, add side lts. @ grnd floor- enlard bedroom due to | $4,500 |
| Jun 30, 2014 | Never finaled issued Jul 2014, no final | 470 Alvarado St | horizontal addition to the side and rear deck on 3rd floor and roof deck per plan shown. remove bay windows on second floor and third floor at the rear per plan. raised the front door overhead opening per plan and elevation. remodel stairways, bathrooms, kitchen, add new skylight per plan.Details
horizontal addition to the side and rear deck on 3rd floor and roof deck per plan shown. remove bay windows on second floor and third floor at the rear per plan. raised the front door overhead opening per plan and elevation. remodel stairways, bathrooms, kitchen, add new skylight per plan. | $130,000 |
| Jun 9, 2014 | Completed final sign-off Dec 2015 | 121 Junipero Serra Bl | 2nd floor:interior remodel and alteration. 1st floor interior remodel & alteration to lower down extg floor to have new minimum height 8'-o". remodel extg rear courtyard, new exterior stair at left side of the bldg, new & replacement of windows. see plans & elevations. voluntary strenghthening.Details
2nd floor:interior remodel and alteration. 1st floor interior remodel & alteration to lower down extg floor to have new minimum height 8'-o". remodel extg rear courtyard, new exterior stair at left side of the bldg, new & replacement of windows. see plans & elevations. voluntary strenghthening. | $280,000 |
| Dec 27, 2013 | Completed final sign-off Feb 2015 | 631 15th Av | residential renovations to an extg 3 story duplex. work includes kitchen and bath renovations to both units and a recreation room in the extg garage, new interior stairs to connect 1st and 2nd flrs, removal of extg columns in garage and widening of extg garage doors.Details
residential renovations to an extg 3 story duplex. work includes kitchen and bath renovations to both units and a recreation room in the extg garage, new interior stairs to connect 1st and 2nd flrs, removal of extg columns in garage and widening of extg garage doors. | $115,000 |
| Apr 19, 2013 | Completed final sign-off Aug 2013 | 143 Burnside Av | new exterior stair at rear, replace windows at front.Details
new exterior stair at rear, replace windows at front. | $15,000 |
| Dec 7, 2012 | Completed final sign-off May 2013 | 856 Moultrie St | repair the rear siding and stair less than 50%Details
repair the rear siding and stair less than 50% | $2,000 |
| Apr 24, 2012 | Completed final sign-off Aug 2012 | 219 Tingley St | remodel the existing kitchen,r eplace the living room ceiling sheetrock. restucco the front house, replace the 2 front windows with clad doown window, repair 50% of the front stairDetails
remodel the existing kitchen,r eplace the living room ceiling sheetrock. restucco the front house, replace the 2 front windows with clad doown window, repair 50% of the front stair | $19,500 |
| Apr 2, 2012 | Completed final sign-off Sep 2012 | 266 30th Av | remodel kitchen & bathroom. add new rear deck. replace 3rd floor ceiling sheetrock. replace the (e) side rear stair in kind. replace (e) french door in rear & replace 4 rear & side windows.Details
remodel kitchen & bathroom. add new rear deck. replace 3rd floor ceiling sheetrock. replace the (e) side rear stair in kind. replace (e) french door in rear & replace 4 rear & side windows. | $50,000 |
| Dec 27, 2011 | Completed final sign-off Feb 2013 | 6276 03rd St | reove existing delapidated stoarge shed at front per nov 201166250 and app 201108152477. install new stucco at front side and rear of house. relocate kitchen and bath. replace rear/side wood stairsDetails
reove existing delapidated stoarge shed at front per nov 201166250 and app 201108152477. install new stucco at front side and rear of house. relocate kitchen and bath. replace rear/side wood stairs | $4,000 |
| Aug 15, 2011 | Completed final sign-off Jan 2012 | 6276 03rd St | remodel kitchen, repair front & rear stair, repair siding & roof, replace windows, not visable from street, to comply with his nov#201030241 dated 1/5/2010. provide smoke alarm, sec.420sfbcDetails
remodel kitchen, repair front & rear stair, repair siding & roof, replace windows, not visable from street, to comply with his nov#201030241 dated 1/5/2010. provide smoke alarm, sec.420sfbc | $20,000 |
| Dec 22, 2010 | Expired or cancelled expired Jun 2018 | 71 Pierce St | remove exterior back stairs.move unit b fr 3/fl to 1/fl.return 3/fl to orig use as bedrooms for unit a.horizontal extension on 3/fl rear.small infill extension on 2/fl rear. excavate at 1/fl to create new unit b.Details
remove exterior back stairs.move unit b fr 3/fl to 1/fl.return 3/fl to orig use as bedrooms for unit a.horizontal extension on 3/fl rear.small infill extension on 2/fl rear. excavate at 1/fl to create new unit b. | $200,000 |