San Francisco Design Build
- Based in
- San Francisco
- On San Francisco permits
- Aug 2009 to Sep 2026
- Last 24 months
- 19 permits filed
129 permits since 2000: 110 completed, 8 in progress, 6 never finaled, 5 expired or cancelled.
Of the 6 never-finaled permits, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
5 roof deck permits: 4 completed, 1 in progress. Typically 179 days from filing to permit and 362 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2026 | In progress issued Aug 2026 | 1528 11th Av | remodel of sfd,exterior changes to inc:rear addition @ basement level,with new roof deck,rear addition @ 2nd level,(n)stairs & door @ facade,1(e)window replacement.interior to inc:remodel of kitchen(n)stairs to basement,(n)primary bath,remodel(e)full bath & add(n)laundry@2nd levelDetails
remodel of sfd,exterior changes to inc:rear addition @ basement level,with new roof deck,rear addition @ 2nd level,(n)stairs & door @ facade,1(e)window replacement.interior to inc:remodel of kitchen(n)stairs to basement,(n)primary bath,remodel(e)full bath & add(n)laundry@2nd level | $125,000 |
| Aug 18, 2016 | Completed final sign-off Apr 2018 | 1530 12th Av | renovation of 3rd floor of a single family dwelling including a 280 sq ft addition at rear. 3rd flr addition to (e) 3rd flr bdrm.(n) roof deck at 3rd flr. (n) skylight in den, (n) windows & doors in bdrm. bathroom remodel. (n) interior fireplace in bdrm.Details
renovation of 3rd floor of a single family dwelling including a 280 sq ft addition at rear. 3rd flr addition to (e) 3rd flr bdrm.(n) roof deck at 3rd flr. (n) skylight in den, (n) windows & doors in bdrm. bathroom remodel. (n) interior fireplace in bdrm. | $85,000 |
| Jun 23, 2014 | Completed final sign-off Apr 2018 | 3544 Scott St | unit# 3544. remodel kitchen & bath. new finishes & fixtures. add new full bathroom, new stairs to new roof deck. replace 4 windows & 1 (e) door with new. garage: move 2 small walls in storage area. ** maher: compliance with ordinance no# 155-13 not required **Details
unit# 3544. remodel kitchen & bath. new finishes & fixtures. add new full bathroom, new stairs to new roof deck. replace 4 windows & 1 (e) door with new. garage: move 2 small walls in storage area. ** maher: compliance with ordinance no# 155-13 not required ** | $90,000 |
| Sep 9, 2011 | Completed final sign-off Mar 2013 | 1070 Hampshire St | exterior front facade remodel to include garage extension at first floor w/ new roof deck, new entry stairs, replace 1 window w/ doors, 1 window w/ (n) , remove 1 (e) window, replace 2 exterior doors & replace tree.Details
exterior front facade remodel to include garage extension at first floor w/ new roof deck, new entry stairs, replace 1 window w/ doors, 1 window w/ (n) , remove 1 (e) window, replace 2 exterior doors & replace tree. | $50,000 |
| Feb 22, 2010 | Completed final sign-off Jul 2011 | 2950 Jackson St | replacement of entry stairs and partial replacement of existing garage and roof deckDetails
replacement of entry stairs and partial replacement of existing garage and roof deck | $75,000 |