Back to bathroom remodel contractors
San Francisco Design Build
- Based in
- San Francisco
- On San Francisco permits
- Aug 2009 to Sep 2026
- Last 24 months
- 19 permits filed
129 permits since 2000: 110 completed, 8 in progress, 6 never finaled, 5 expired or cancelled.
Of the 6 never-finaled permits, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
46 bathroom remodel permits: 40 completed, 2 in progress, 1 never finaled, 3 expired or cancelled. Typically 2 days from filing to permit and 212 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2026 | In progress issued Aug 2026 | 1528 11th Av | remodel of sfd,exterior changes to inc:rear addition @ basement level,with new roof deck,rear addition @ 2nd level,(n)stairs & door @ facade,1(e)window replacement.interior to inc:remodel of kitchen(n)stairs to basement,(n)primary bath,remodel(e)full bath & add(n)laundry@2nd levelDetails
remodel of sfd,exterior changes to inc:rear addition @ basement level,with new roof deck,rear addition @ 2nd level,(n)stairs & door @ facade,1(e)window replacement.interior to inc:remodel of kitchen(n)stairs to basement,(n)primary bath,remodel(e)full bath & add(n)laundry@2nd level | $125,000 |
| Aug 25, 2025 | Completed final sign-off May 2026 | 3625 19th St | remodel kitchen and bathroom, replace bath, kitchen and hallway windows. move bedroom wall, add closet.Details
remodel kitchen and bathroom, replace bath, kitchen and hallway windows. move bedroom wall, add closet. | $68,000 |
| May 21, 2025 | In progress issued Jun 2025 | 715 Duboce Av | remodel unfinished space to create in office, bathroom, laundry, gym, and media room. replace in kind stree facing window, (1) (n) rear facing slidng door (not visible from public right away).Details
remodel unfinished space to create in office, bathroom, laundry, gym, and media room. replace in kind stree facing window, (1) (n) rear facing slidng door (not visible from public right away). | $85,000 |
| Jan 13, 2025 | Completed final sign-off Apr 2025 | 2042 Green St | remodel (e) bathroom, replace fixtures and finishes in kindl replace e water heater with hybrid water heater.Details
remodel (e) bathroom, replace fixtures and finishes in kindl replace e water heater with hybrid water heater. | $45,000 |
| Oct 7, 2024 | Completed final sign-off Oct 2025 | 323 Edinburgh St | 1st floor- (n) office, full bathroom, storage, powder room, relocation of w/b (606sf). 3 (n) rear yard windows and (n) door- not visible from street 2nd floor replace 4 (e) windows in kind (2 street facing/ 2 rear yard) mep systems to be upgraded and(n) lighting throughout areasDetails
1st floor- (n) office, full bathroom, storage, powder room, relocation of w/b (606sf). 3 (n) rear yard windows and (n) door- not visible from street 2nd floor replace 4 (e) windows in kind (2 street facing/ 2 rear yard) mep systems to be upgraded and(n) lighting throughout areas | $77,359 |
| Jun 25, 2024 | Completed final sign-off Dec 2024 | 2919 Pacific Av | unit #1: bathroom remodel - replace fixtures and finishes in kind. replace closet door, replace (8) existing windows in kind w/ inserts. no exterior facade work. no exterior facade changes. no removal of wallsDetails
unit #1: bathroom remodel - replace fixtures and finishes in kind. replace closet door, replace (8) existing windows in kind w/ inserts. no exterior facade work. no exterior facade changes. no removal of walls | $65,000 |
| Jun 30, 2023 | Completed final sign-off Oct 2024 | 2614 Diamond St | remodel, 1/f new media room, new storage closet, new full bathroom, new stairs to code, mep to be upgraded, new lighting thruout remodeled @ ext window replace/change in size, and (1) window full-in (no window changes to front of home or visible from public right-of-way)Details
remodel, 1/f new media room, new storage closet, new full bathroom, new stairs to code, mep to be upgraded, new lighting thruout remodeled @ ext window replace/change in size, and (1) window full-in (no window changes to front of home or visible from public right-of-way) | $67,300 |
| Apr 26, 2023 | Expired or cancelled expired Feb 2026 | 106 Collins St | altered site to pa# 2019-0801-7569 s. enclose (e) patio to create (n) bedroom, add (n) full bathroom and (n) office. reduction of scope from original site permit.Details
altered site to pa# 2019-0801-7569 s. enclose (e) patio to create (n) bedroom, add (n) full bathroom and (n) office. reduction of scope from original site permit. | |
| Jul 28, 2022 | Completed final sign-off Jan 2024 | 3552 22nd St | unit 3552: kitchen and bathroom remodel. (n) bathroom and laundry closet. replace all (e) doors, windows, & roof. new 4 skylight @ west side. re-build in kind rear exit stairs, less than 70% of wall demo as per plan.Details
unit 3552: kitchen and bathroom remodel. (n) bathroom and laundry closet. replace all (e) doors, windows, & roof. new 4 skylight @ west side. re-build in kind rear exit stairs, less than 70% of wall demo as per plan. | $89,328 |
| May 4, 2022 | Completed final sign-off Apr 2023 | 181 Duncan St | 2/f: kitchen remodel, new powder room. 3/f: remodel exist.bathroom and add one full bath. exterior: 1 new window, 1 new rear facing 2/f, 4 (e) windows replacement, 2 new skylights (no changes to the front of the house, and the propose changes are not visible from street).Details
2/f: kitchen remodel, new powder room. 3/f: remodel exist.bathroom and add one full bath. exterior: 1 new window, 1 new rear facing 2/f, 4 (e) windows replacement, 2 new skylights (no changes to the front of the house, and the propose changes are not visible from street). | $60,000 |
| Aug 5, 2021 | Completed final sign-off Feb 2022 | 1124 Irving St | remodel kitchen (7x7) and bathroom (5x7) for unit 1124 in ind remodel kitchen (7x7) in kind 1126Details
remodel kitchen (7x7) and bathroom (5x7) for unit 1124 in ind remodel kitchen (7x7) in kind 1126 | $35,000 |
| Mar 17, 2021 | Completed final sign-off Oct 2022 | 4017 Folsom St | remodel 4 bathrooms (5x8) in kindDetails
remodel 4 bathrooms (5x8) in kind | $26,000 |
| Sep 10, 2020 | Completed final sign-off Apr 2021 | 338 Scott St | unit 338: new bathroom @ 3/f, no exterior changes, no change to doors/windows/skylightsDetails
unit 338: new bathroom @ 3/f, no exterior changes, no change to doors/windows/skylights | $8,000 |
| Aug 1, 2019 | Expired or cancelled expired Feb 2026 | 106 Collins St | vertical addition (3rd floor) to accomodate 3 new bedrooms , 1 new dressing room, 2 new bathrooms, new staircase. addition of an exterior deck @ the rear.Details
vertical addition (3rd floor) to accomodate 3 new bedrooms , 1 new dressing room, 2 new bathrooms, new staircase. addition of an exterior deck @ the rear. | $274,000 |
| Jul 10, 2019 | Completed final sign-off Jul 2020 | 257 Whitney St | remodel (e) 1st floor to include den, storage and new full bath. 3rd floor, remodel (e) bathroom. no window or door changes, no exterior work.Details
remodel (e) 1st floor to include den, storage and new full bath. 3rd floor, remodel (e) bathroom. no window or door changes, no exterior work. | $80,000 |
| Jun 5, 2019 | Completed final sign-off Oct 2024 | 2121 24th St | 1st floor: new kitchen, dining, living layout with sliding doors on south wall. new stairs to 2nd level. new wall @ (e) living room & made into guest room/home office. addition of new 2nd floor: 2 new bedroom, baths & laundry. new window & skylights. basement: remove & add wall to change location ofDetails
1st floor: new kitchen, dining, living layout with sliding doors on south wall. new stairs to 2nd level. new wall @ (e) living room & made into guest room/home office. addition of new 2nd floor: 2 new bedroom, baths & laundry. new window & skylights. basement: remove & add wall to change location of | $200,000 |
| Mar 5, 2019 | Completed final sign-off Aug 2019 | 51 Molimo Dr | remodel of 1st flr sfd incl replacing 1 window & door in-kind at rear yard not visible from street. bathroom remodel, laundry remodel & enlarged master suite. mep upgraded as requred by code. new lighting throughoutDetails
remodel of 1st flr sfd incl replacing 1 window & door in-kind at rear yard not visible from street. bathroom remodel, laundry remodel & enlarged master suite. mep upgraded as requred by code. new lighting throughout | $65,000 |
| Aug 28, 2018 | Completed final sign-off Nov 2018 | 40 Hartford St | bathroom surface remodel, no walls/structural change, electrical will be one fan, one outlet, one sconce & one ceiling light; (e) plumbing to remain, toilet, sink, shower fixtures floor tile to be replaced.Details
bathroom surface remodel, no walls/structural change, electrical will be one fan, one outlet, one sconce & one ceiling light; (e) plumbing to remain, toilet, sink, shower fixtures floor tile to be replaced. | $8,500 |
| Apr 11, 2018 | Completed final sign-off Jul 2020 | 767 27th St | 1 kitchen & 6 bathroom remodel. no new plumbing fixture, new light fixtures,new flooringDetails
1 kitchen & 6 bathroom remodel. no new plumbing fixture, new light fixtures,new flooring | $80,000 |
| Jan 25, 2018 | Expired or cancelled withdrawn Nov 2018 | 1910 Golden Gate Av | remodel to 2nd floor & add powder room. add new garage, new living space including 2 bedrooms & 1 bath @ 1st floor. spiral stairs to rear yard. foundation replacement. adding columns to front to match adjacent home. rebuild stairs in kind.Details
remodel to 2nd floor & add powder room. add new garage, new living space including 2 bedrooms & 1 bath @ 1st floor. spiral stairs to rear yard. foundation replacement. adding columns to front to match adjacent home. rebuild stairs in kind. | $150,000 |
| May 5, 2017 | Never finaled issued May 2017, no final | 1530 12th Av | exploratory demolition - 1 square foot demolition for each wall & ceiling in kitchen garage bathroom, bedroom, closet, dining, upstairs bedroom.Details
exploratory demolition - 1 square foot demolition for each wall & ceiling in kitchen garage bathroom, bedroom, closet, dining, upstairs bedroom. | |
| Dec 30, 2016 | Completed final sign-off Jan 2019 | 381 San Leandro Wy | interior renovations of basement & 1st flr bathroom. new bath at basement, new lighting in remodeled areas. all exterior work on separate permit.Details
interior renovations of basement & 1st flr bathroom. new bath at basement, new lighting in remodeled areas. all exterior work on separate permit. | $150,000 |
| Nov 30, 2016 | Completed final sign-off May 2017 | 571 Teresita Bl | remodel of the kitchen and addition of the (n) bathroom on the 2nd flr. (n) skylights & (n) window frame on south ext. wall.Details
remodel of the kitchen and addition of the (n) bathroom on the 2nd flr. (n) skylights & (n) window frame on south ext. wall. | $70,000 |
| Aug 24, 2016 | Completed final sign-off May 2017 | 625 16th Av | 2/f- in-fill south wall lightwell, not visable from street. remodel kitchen & bathroom. replace 2 windows in kind on side; making one smaller. all not visible from street.Details
2/f- in-fill south wall lightwell, not visable from street. remodel kitchen & bathroom. replace 2 windows in kind on side; making one smaller. all not visible from street. | $75,000 |
| Aug 23, 2016 | Completed final sign-off Mar 2017 | 75 Wool St | g/f: master suite remodel with full bath, laundry room, replace (1) window & (1) door in-kind, enlarge (1) window at rear. 1st floor: repair & replace (e) interior stair, add 1 (n) skylightDetails
g/f: master suite remodel with full bath, laundry room, replace (1) window & (1) door in-kind, enlarge (1) window at rear. 1st floor: repair & replace (e) interior stair, add 1 (n) skylight | $85,000 |
| Aug 18, 2016 | Completed final sign-off Apr 2018 | 1530 12th Av | renovation of 3rd floor of a single family dwelling including a 280 sq ft addition at rear. 3rd flr addition to (e) 3rd flr bdrm.(n) roof deck at 3rd flr. (n) skylight in den, (n) windows & doors in bdrm. bathroom remodel. (n) interior fireplace in bdrm.Details
renovation of 3rd floor of a single family dwelling including a 280 sq ft addition at rear. 3rd flr addition to (e) 3rd flr bdrm.(n) roof deck at 3rd flr. (n) skylight in den, (n) windows & doors in bdrm. bathroom remodel. (n) interior fireplace in bdrm. | $85,000 |
| May 12, 2016 | Completed final sign-off Oct 2016 | 625 16th Av | 1st & 2nd floors, unit #625: renovation. 1st flr: new bathroom & bedroom in (e) living area. enclose (e) storage space, new stairs (interior) up to 2nd flr, replace 1 (e) window - not visible from street.Details
1st & 2nd floors, unit #625: renovation. 1st flr: new bathroom & bedroom in (e) living area. enclose (e) storage space, new stairs (interior) up to 2nd flr, replace 1 (e) window - not visible from street. | $40,000 |
| Jul 9, 2015 | Completed final sign-off Dec 2015 | 338 Scott St | finish & fixture. remodel kitchen & bathroom. all new surfaces, fixtures, appliances & finishes.Details
finish & fixture. remodel kitchen & bathroom. all new surfaces, fixtures, appliances & finishes. | $25,000 |
| Jul 9, 2015 | Completed final sign-off Jun 2016 | 2624 21st St | remodel kitchen and 2nd fl bath at 3rd fl. add bath on 2nd floor. add 1/2 bath on 2nd flDetails
remodel kitchen and 2nd fl bath at 3rd fl. add bath on 2nd floor. add 1/2 bath on 2nd fl | $57,000 |
| Feb 20, 2015 | Completed final sign-off Jul 2015 | 795 14th Av | remodel on the top floor: add new 1/2 bath, remodel (e) full bath and kitchen, remove (e) windows and replace in-kind e w/wood to match the original. replace interior doors & exterior rear door. patch and repair flooring throughout. revision appl. 2014.1204.3051.Details
remodel on the top floor: add new 1/2 bath, remodel (e) full bath and kitchen, remove (e) windows and replace in-kind e w/wood to match the original. replace interior doors & exterior rear door. patch and repair flooring throughout. revision appl. 2014.1204.3051. | $70,000 |
| Dec 4, 2014 | Completed final sign-off Jul 2015 | 795 14th Av | unit 795 - remodel kitchen and bathroom ; to include all new fixtures and finishes; to comply with cec150.0(k)3 & 5Details
unit 795 - remodel kitchen and bathroom ; to include all new fixtures and finishes; to comply with cec150.0(k)3 & 5 | $45,000 |
| Oct 30, 2014 | Completed final sign-off Nov 2015 | 601 Chenery St | remodel top floor kitchen, bathroom,and add new bath, replace (e) interior stairs with (n), replace (e) metal windows with clad windows to match original, fill in(e) lightwell.Details
remodel top floor kitchen, bathroom,and add new bath, replace (e) interior stairs with (n), replace (e) metal windows with clad windows to match original, fill in(e) lightwell. | $80,000 |
| Jun 23, 2014 | Completed final sign-off Apr 2018 | 3544 Scott St | unit# 3544. remodel kitchen & bath. new finishes & fixtures. add new full bathroom, new stairs to new roof deck. replace 4 windows & 1 (e) door with new. garage: move 2 small walls in storage area. ** maher: compliance with ordinance no# 155-13 not required **Details
unit# 3544. remodel kitchen & bath. new finishes & fixtures. add new full bathroom, new stairs to new roof deck. replace 4 windows & 1 (e) door with new. garage: move 2 small walls in storage area. ** maher: compliance with ordinance no# 155-13 not required ** | $90,000 |
| May 14, 2014 | Completed final sign-off Feb 2015 | 120 Santa Paula Av | 1st floor kitchen remodle, all new fixtures & finishes, relocate interior stairs, remodel basement area: legalzie (e) bathroom, new offices & family room, new drywall, finishes & fixtures. relocate one exterior door & three windows. compliance with ordinance #155-13 not requiredDetails
1st floor kitchen remodle, all new fixtures & finishes, relocate interior stairs, remodel basement area: legalzie (e) bathroom, new offices & family room, new drywall, finishes & fixtures. relocate one exterior door & three windows. compliance with ordinance #155-13 not required | $65,000 |
| Mar 26, 2014 | Completed final sign-off Sep 2014 | 336 Scott St | structural reinforcement/partial seismic upgrades in garage. remodle existing gorund floor storage rooms, add half bath & replace existing doors + windows with new.Details
structural reinforcement/partial seismic upgrades in garage. remodle existing gorund floor storage rooms, add half bath & replace existing doors + windows with new. | $30,000 |
| Mar 26, 2014 | Completed final sign-off Dec 2014 | 19 Elsie St | fireplace appliance to be approvable for use in a sleeping room. remodel (e) master suite bathroom. all new fixtures and finishes. replace all closet doors with (n) hardwood floors throughout. replace (e) fireplace w/ new direct ul listed vent gas fireplace. bathroom remodel - all new lighting shallDetails
fireplace appliance to be approvable for use in a sleeping room. remodel (e) master suite bathroom. all new fixtures and finishes. replace all closet doors with (n) hardwood floors throughout. replace (e) fireplace w/ new direct ul listed vent gas fireplace. bathroom remodel - all new lighting shall | $30,000 |
| Mar 4, 2014 | Completed final sign-off May 2014 | 159 Octavia St | kitchen & bath finish/fixture remodel, new hardwood floors throughout. replace 1 bathroom window in-kind, not visible from street, u-factor shall not exceed 0.4Details
kitchen & bath finish/fixture remodel, new hardwood floors throughout. replace 1 bathroom window in-kind, not visible from street, u-factor shall not exceed 0.4 | $30,000 |
| Nov 18, 2013 | Completed final sign-off Dec 2013 | 109 Nevada St | remodel master bath-fixtures& finishes no change on walls.Details
remodel master bath-fixtures& finishes no change on walls. | $5,000 |
| Apr 9, 2013 | Completed final sign-off Jul 2016 | 35 Whitney St | 1st floor rear addition (n) bedroom, full bath, laundry room and office space with deck above.Details
1st floor rear addition (n) bedroom, full bath, laundry room and office space with deck above. | $140,000 |
| Feb 21, 2013 | Completed final sign-off Feb 2014 | 281 Henry St | (n) bedroom, full bath and laundry room at 1st fl. remodel kitchen, bathroom, living and dining areas at 2nd fl. includes removing walls at 2nd floor. replace 2 (e) rear windows at 1st fl. 2(n) skylights at 2nd fl.Details
(n) bedroom, full bath and laundry room at 1st fl. remodel kitchen, bathroom, living and dining areas at 2nd fl. includes removing walls at 2nd floor. replace 2 (e) rear windows at 1st fl. 2(n) skylights at 2nd fl. | $80,000 |
| Jan 24, 2013 | Completed final sign-off Mar 2013 | 11 Elsie St | bathroom and closet remodel at ground floor.Details
bathroom and closet remodel at ground floor. | $12,000 |
| Oct 9, 2012 | Completed final sign-off Jan 2013 | 109 Nevada St | remodel second floor kitchen & bathroom. new finishes & fixtures. remove (e) wall between kitchen & living area. replace window in kind. replace 2 skylights & add 1 (n) skylight. visible from street (window).Details
remodel second floor kitchen & bathroom. new finishes & fixtures. remove (e) wall between kitchen & living area. replace window in kind. replace 2 skylights & add 1 (n) skylight. visible from street (window). | $40,000 |
| Jan 17, 2012 | Completed final sign-off Mar 2012 | 180 Lily St | complete fixture and finish remodel of full bathroom. no change on walls and openings.Details
complete fixture and finish remodel of full bathroom. no change on walls and openings. | $12,000 |
| Jan 27, 2011 | Completed final sign-off May 2011 | 300 03rd St | interior surface remodel to include replacement of toilet and sink, new built in cabinets in liv rm area, replace lights in same location, replace flooring in entry, kitchen, dining, living rm, hallways, 1 bath, bedroom, closetsDetails
interior surface remodel to include replacement of toilet and sink, new built in cabinets in liv rm area, replace lights in same location, replace flooring in entry, kitchen, dining, living rm, hallways, 1 bath, bedroom, closets | $20,000 |
| Nov 23, 2010 | Completed final sign-off Jan 2011 | 1250 Ellis St | surface remodel 2 bathrooms, new plumbing fixtures, light fixtures and finishes. area 5x7 each high efficacy lighting or occupancy sensor control, no chagne to exhaust systemDetails
surface remodel 2 bathrooms, new plumbing fixtures, light fixtures and finishes. area 5x7 each high efficacy lighting or occupancy sensor control, no chagne to exhaust system | $16,000 |
| Feb 10, 2010 | Completed final sign-off Apr 2010 | 4150 17th St | remodel mid-level bathroom & lower level bathroom, replace (e) fixtures & finishes with new. locations stay the same, no moving or adding walls in unit #25. high efficency lighting and occupancy sensor control.Details
remodel mid-level bathroom & lower level bathroom, replace (e) fixtures & finishes with new. locations stay the same, no moving or adding walls in unit #25. high efficency lighting and occupancy sensor control. | $15,000 |