Back to kitchen remodel contractors
San Francisco Design Build
- Based in
- San Francisco
- On San Francisco permits
- Aug 2009 to Sep 2026
- Last 24 months
- 19 permits filed
129 permits since 2000: 110 completed, 8 in progress, 6 never finaled, 5 expired or cancelled.
Of the 6 never-finaled permits, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
37 kitchen remodel permits: 33 completed, 3 in progress, 1 never finaled. Typically 3 days from filing to permit and 215 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2026 | In progress issued Aug 2026 | 70 Zircon Pl | remodel existing single family residence with 2 levels over basement. exterior changes include replacing 1 existing rear facing window and 1 existing rear facing door. remodel kitchen, remodel wet bar in-kind. new lighting throughout remodeled areasDetails
remodel existing single family residence with 2 levels over basement. exterior changes include replacing 1 existing rear facing window and 1 existing rear facing door. remodel kitchen, remodel wet bar in-kind. new lighting throughout remodeled areas | $57,000 |
| Jul 20, 2026 | In progress issued Aug 2026 | 381 San Leandro Wy | remodel to (e) single family residence. exterior changes including 1 rear door replacement, remodel kitchen. mep system systems will be upgraded as required per code. new lighting throught remodeled areas.Details
remodel to (e) single family residence. exterior changes including 1 rear door replacement, remodel kitchen. mep system systems will be upgraded as required per code. new lighting throught remodeled areas. | $45,000 |
| Mar 30, 2026 | In progress issued Aug 2026 | 1528 11th Av | remodel of sfd,exterior changes to inc:rear addition @ basement level,with new roof deck,rear addition @ 2nd level,(n)stairs & door @ facade,1(e)window replacement.interior to inc:remodel of kitchen(n)stairs to basement,(n)primary bath,remodel(e)full bath & add(n)laundry@2nd levelDetails
remodel of sfd,exterior changes to inc:rear addition @ basement level,with new roof deck,rear addition @ 2nd level,(n)stairs & door @ facade,1(e)window replacement.interior to inc:remodel of kitchen(n)stairs to basement,(n)primary bath,remodel(e)full bath & add(n)laundry@2nd level | $125,000 |
| Jan 28, 2026 | Completed final sign-off Jun 2026 | 2919 Pacific Av | unit #11: kitchen remodel, replace fixtures and finishes in-kind. replace (2) windows in kind with inserts. no exterior facade work. no exterior facade changes. not street facing.Details
unit #11: kitchen remodel, replace fixtures and finishes in-kind. replace (2) windows in kind with inserts. no exterior facade work. no exterior facade changes. not street facing. | $125,000 |
| Aug 25, 2025 | Completed final sign-off May 2026 | 3625 19th St | remodel kitchen and bathroom, replace bath, kitchen and hallway windows. move bedroom wall, add closet.Details
remodel kitchen and bathroom, replace bath, kitchen and hallway windows. move bedroom wall, add closet. | $68,000 |
| Apr 10, 2025 | Completed final sign-off Nov 2025 | 1406 Golden Gate Av | remodel second floor of a three story condo. 2/fl- remodel to include remodel of kitchen relocate powder room enlarge (e) openings in dining living and kitchen to create arched openings (all interior) mep system will be upgrade as required per code (n) lighting throughout remodeledDetails
remodel second floor of a three story condo. 2/fl- remodel to include remodel of kitchen relocate powder room enlarge (e) openings in dining living and kitchen to create arched openings (all interior) mep system will be upgrade as required per code (n) lighting throughout remodeled | $75,000 |
| Jul 28, 2022 | Completed final sign-off Jan 2024 | 3552 22nd St | unit 3552: kitchen and bathroom remodel. (n) bathroom and laundry closet. replace all (e) doors, windows, & roof. new 4 skylight @ west side. re-build in kind rear exit stairs, less than 70% of wall demo as per plan.Details
unit 3552: kitchen and bathroom remodel. (n) bathroom and laundry closet. replace all (e) doors, windows, & roof. new 4 skylight @ west side. re-build in kind rear exit stairs, less than 70% of wall demo as per plan. | $89,328 |
| May 4, 2022 | Completed final sign-off Apr 2023 | 181 Duncan St | 2/f: kitchen remodel, new powder room. 3/f: remodel exist.bathroom and add one full bath. exterior: 1 new window, 1 new rear facing 2/f, 4 (e) windows replacement, 2 new skylights (no changes to the front of the house, and the propose changes are not visible from street).Details
2/f: kitchen remodel, new powder room. 3/f: remodel exist.bathroom and add one full bath. exterior: 1 new window, 1 new rear facing 2/f, 4 (e) windows replacement, 2 new skylights (no changes to the front of the house, and the propose changes are not visible from street). | $60,000 |
| Aug 5, 2021 | Completed final sign-off Feb 2022 | 1124 Irving St | remodel kitchen (7x7) and bathroom (5x7) for unit 1124 in ind remodel kitchen (7x7) in kind 1126Details
remodel kitchen (7x7) and bathroom (5x7) for unit 1124 in ind remodel kitchen (7x7) in kind 1126 | $35,000 |
| Jun 16, 2021 | Completed final sign-off Dec 2021 | 679 Waller St | remodel 1 kitchen 7x7 inkind non structuralDetails
remodel 1 kitchen 7x7 inkind non structural | $30,000 |
| Apr 19, 2021 | Completed final sign-off Oct 2022 | 222 Waller St | 2 (n) skylights, 1 (n) rear facing kitchen door, repalce 2 (e) side windows, not visible from public. 1st fl: remodel kitchen & powder rm, replace (e) french doors w/(n) bi-fold slider doors. 2Details
2 (n) skylights, 1 (n) rear facing kitchen door, repalce 2 (e) side windows, not visible from public. 1st fl: remodel kitchen & powder rm, replace (e) french doors w/(n) bi-fold slider doors. 2 | $95,000 |
| Jun 5, 2019 | Completed final sign-off Oct 2024 | 2121 24th St | 1st floor: new kitchen, dining, living layout with sliding doors on south wall. new stairs to 2nd level. new wall @ (e) living room & made into guest room/home office. addition of new 2nd floor: 2 new bedroom, baths & laundry. new window & skylights. basement: remove & add wall to change location ofDetails
1st floor: new kitchen, dining, living layout with sliding doors on south wall. new stairs to 2nd level. new wall @ (e) living room & made into guest room/home office. addition of new 2nd floor: 2 new bedroom, baths & laundry. new window & skylights. basement: remove & add wall to change location of | $200,000 |
| Oct 9, 2018 | Completed final sign-off Mar 2019 | 912 Steiner St | remodel of extg kitchen and powder room. replace extg window. mechanical electrical, & plumbing under seperate permit.Details
remodel of extg kitchen and powder room. replace extg window. mechanical electrical, & plumbing under seperate permit. | $167,000 |
| Apr 11, 2018 | Completed final sign-off Jul 2020 | 767 27th St | 1 kitchen & 6 bathroom remodel. no new plumbing fixture, new light fixtures,new flooringDetails
1 kitchen & 6 bathroom remodel. no new plumbing fixture, new light fixtures,new flooring | $80,000 |
| May 5, 2017 | Never finaled issued May 2017, no final | 1530 12th Av | exploratory demolition - 1 square foot demolition for each wall & ceiling in kitchen garage bathroom, bedroom, closet, dining, upstairs bedroom.Details
exploratory demolition - 1 square foot demolition for each wall & ceiling in kitchen garage bathroom, bedroom, closet, dining, upstairs bedroom. | |
| Apr 13, 2017 | Completed final sign-off Jul 2017 | 340 Waller St | kitchen remodel: finish & fixture remodel. all (n) materials & appliances. replace kitchen lights. no structural work.Details
kitchen remodel: finish & fixture remodel. all (n) materials & appliances. replace kitchen lights. no structural work. | $25,000 |
| Nov 30, 2016 | Completed final sign-off May 2017 | 571 Teresita Bl | remodel of the kitchen and addition of the (n) bathroom on the 2nd flr. (n) skylights & (n) window frame on south ext. wall.Details
remodel of the kitchen and addition of the (n) bathroom on the 2nd flr. (n) skylights & (n) window frame on south ext. wall. | $70,000 |
| Aug 24, 2016 | Completed final sign-off May 2017 | 625 16th Av | 2/f- in-fill south wall lightwell, not visable from street. remodel kitchen & bathroom. replace 2 windows in kind on side; making one smaller. all not visible from street.Details
2/f- in-fill south wall lightwell, not visable from street. remodel kitchen & bathroom. replace 2 windows in kind on side; making one smaller. all not visible from street. | $75,000 |
| Jun 20, 2016 | Completed final sign-off Aug 2016 | 1650 Jackson St | unit 405: finish & fixture remodel of kitchen.Details
unit 405: finish & fixture remodel of kitchen. | $8,000 |
| Jul 9, 2015 | Completed final sign-off Dec 2015 | 338 Scott St | finish & fixture. remodel kitchen & bathroom. all new surfaces, fixtures, appliances & finishes.Details
finish & fixture. remodel kitchen & bathroom. all new surfaces, fixtures, appliances & finishes. | $25,000 |
| Jul 9, 2015 | Completed final sign-off Jun 2016 | 2624 21st St | remodel kitchen and 2nd fl bath at 3rd fl. add bath on 2nd floor. add 1/2 bath on 2nd flDetails
remodel kitchen and 2nd fl bath at 3rd fl. add bath on 2nd floor. add 1/2 bath on 2nd fl | $57,000 |
| May 7, 2015 | Completed final sign-off Dec 2015 | 692 Teresita Bl | remodel kitchen & dining room areas. all (n) windows & doors to light well - not visible from streetDetails
remodel kitchen & dining room areas. all (n) windows & doors to light well - not visible from street | $60,000 |
| Feb 20, 2015 | Completed final sign-off Jul 2015 | 795 14th Av | remodel on the top floor: add new 1/2 bath, remodel (e) full bath and kitchen, remove (e) windows and replace in-kind e w/wood to match the original. replace interior doors & exterior rear door. patch and repair flooring throughout. revision appl. 2014.1204.3051.Details
remodel on the top floor: add new 1/2 bath, remodel (e) full bath and kitchen, remove (e) windows and replace in-kind e w/wood to match the original. replace interior doors & exterior rear door. patch and repair flooring throughout. revision appl. 2014.1204.3051. | $70,000 |
| Dec 4, 2014 | Completed final sign-off Jul 2015 | 795 14th Av | unit 795 - remodel kitchen and bathroom ; to include all new fixtures and finishes; to comply with cec150.0(k)3 & 5Details
unit 795 - remodel kitchen and bathroom ; to include all new fixtures and finishes; to comply with cec150.0(k)3 & 5 | $45,000 |
| Oct 30, 2014 | Completed final sign-off Nov 2015 | 601 Chenery St | remodel top floor kitchen, bathroom,and add new bath, replace (e) interior stairs with (n), replace (e) metal windows with clad windows to match original, fill in(e) lightwell.Details
remodel top floor kitchen, bathroom,and add new bath, replace (e) interior stairs with (n), replace (e) metal windows with clad windows to match original, fill in(e) lightwell. | $80,000 |
| Jun 23, 2014 | Completed final sign-off Apr 2018 | 3544 Scott St | unit# 3544. remodel kitchen & bath. new finishes & fixtures. add new full bathroom, new stairs to new roof deck. replace 4 windows & 1 (e) door with new. garage: move 2 small walls in storage area. ** maher: compliance with ordinance no# 155-13 not required **Details
unit# 3544. remodel kitchen & bath. new finishes & fixtures. add new full bathroom, new stairs to new roof deck. replace 4 windows & 1 (e) door with new. garage: move 2 small walls in storage area. ** maher: compliance with ordinance no# 155-13 not required ** | $90,000 |
| May 14, 2014 | Completed final sign-off Feb 2015 | 120 Santa Paula Av | 1st floor kitchen remodle, all new fixtures & finishes, relocate interior stairs, remodel basement area: legalzie (e) bathroom, new offices & family room, new drywall, finishes & fixtures. relocate one exterior door & three windows. compliance with ordinance #155-13 not requiredDetails
1st floor kitchen remodle, all new fixtures & finishes, relocate interior stairs, remodel basement area: legalzie (e) bathroom, new offices & family room, new drywall, finishes & fixtures. relocate one exterior door & three windows. compliance with ordinance #155-13 not required | $65,000 |
| Mar 4, 2014 | Completed final sign-off May 2014 | 159 Octavia St | kitchen & bath finish/fixture remodel, new hardwood floors throughout. replace 1 bathroom window in-kind, not visible from street, u-factor shall not exceed 0.4Details
kitchen & bath finish/fixture remodel, new hardwood floors throughout. replace 1 bathroom window in-kind, not visible from street, u-factor shall not exceed 0.4 | $30,000 |
| Oct 7, 2013 | Completed final sign-off May 2015 | 2622 21st St | interior remodel of (e) cottage @ rear. remodel includes code compliant stair, kitchen, new bathe, new topping slab with radiant heat. all exterior work to replace (e) in-kind, (e) windows to be replaced with new wood windows to match.Details
interior remodel of (e) cottage @ rear. remodel includes code compliant stair, kitchen, new bathe, new topping slab with radiant heat. all exterior work to replace (e) in-kind, (e) windows to be replaced with new wood windows to match. | $67,200 |
| Apr 9, 2013 | Completed final sign-off Sep 2013 | 115 Dalewood Wy | remodel 2nd floor kitchen, interior work only, new finishes + finishes, remove (e) walls between kitchen & living/dining areas. add 1 new skylight.Details
remodel 2nd floor kitchen, interior work only, new finishes + finishes, remove (e) walls between kitchen & living/dining areas. add 1 new skylight. | $10,000 |
| Feb 21, 2013 | Completed final sign-off Feb 2014 | 281 Henry St | (n) bedroom, full bath and laundry room at 1st fl. remodel kitchen, bathroom, living and dining areas at 2nd fl. includes removing walls at 2nd floor. replace 2 (e) rear windows at 1st fl. 2(n) skylights at 2nd fl.Details
(n) bedroom, full bath and laundry room at 1st fl. remodel kitchen, bathroom, living and dining areas at 2nd fl. includes removing walls at 2nd floor. replace 2 (e) rear windows at 1st fl. 2(n) skylights at 2nd fl. | $80,000 |
| Oct 9, 2012 | Completed final sign-off Jan 2013 | 109 Nevada St | remodel second floor kitchen & bathroom. new finishes & fixtures. remove (e) wall between kitchen & living area. replace window in kind. replace 2 skylights & add 1 (n) skylight. visible from street (window).Details
remodel second floor kitchen & bathroom. new finishes & fixtures. remove (e) wall between kitchen & living area. replace window in kind. replace 2 skylights & add 1 (n) skylight. visible from street (window). | $40,000 |
| Sep 20, 2012 | Completed final sign-off Nov 2012 | 539 Wisconsin St | kitchen remodel all new fixtures and finishes. replace flooring throughout 3rd floor (450 sq.ft.)Details
kitchen remodel all new fixtures and finishes. replace flooring throughout 3rd floor (450 sq.ft.) | $20,000 |
| Mar 6, 2012 | Completed final sign-off Feb 2013 | 1236 Cole St | kitchen remodel & new opening in a wall between kitchen & dining roomDetails
kitchen remodel & new opening in a wall between kitchen & dining room | $30,000 |
| Nov 17, 2011 | Completed final sign-off May 2012 | 3982 Sacramento St | remodel kitchen and dining area at 2nd floor. new finishes and fixtures, remove wall between kitchen and dining areaDetails
remodel kitchen and dining area at 2nd floor. new finishes and fixtures, remove wall between kitchen and dining area | $25,000 |
| Jan 27, 2011 | Completed final sign-off May 2011 | 300 03rd St | interior surface remodel to include replacement of toilet and sink, new built in cabinets in liv rm area, replace lights in same location, replace flooring in entry, kitchen, dining, living rm, hallways, 1 bath, bedroom, closetsDetails
interior surface remodel to include replacement of toilet and sink, new built in cabinets in liv rm area, replace lights in same location, replace flooring in entry, kitchen, dining, living rm, hallways, 1 bath, bedroom, closets | $20,000 |
| Aug 17, 2009 | Completed final sign-off Oct 2009 | 877 Carolina St | revision to 1200908104474 by increasing cost of construction by 10,000 and revising scope of work to include new rear door and bay garden window at kitchen and residing 3 sides of house, excluding front of bldgDetails
revision to 1200908104474 by increasing cost of construction by 10,000 and revising scope of work to include new rear door and bay garden window at kitchen and residing 3 sides of house, excluding front of bldg | $10,000 |