Andrew Chekene Enterprises/ Dba Ac Enter
- Based in
- Hayward
- On San Francisco permits
- Aug 2007 to Sep 2026
- Last 24 months
- 38 permits filed
428 permits since 2000: 339 completed, 23 in progress, 18 never finaled, 48 expired or cancelled.
Of the 18 never-finaled permits, 5 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Roof deck permits
7 roof deck permits: 7 completed. Typically 0 days from filing to permit and 251 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2025 | Completed final sign-off Nov 2025 | 1902 Lyon St | roof deck repair. remove and (save) restore wood paver remove shingle siding remove roofing memebrane repair membrane . reset (e) wood pavers patch wood shingles and roofing. approx. 100 sq ft. all work in kind.Details
roof deck repair. remove and (save) restore wood paver remove shingle siding remove roofing memebrane repair membrane . reset (e) wood pavers patch wood shingles and roofing. approx. 100 sq ft. all work in kind. | $7,800 |
| Nov 3, 2023 | Completed final sign-off Jul 2024 | 207 Pelican Cove Tr | maintenance of existing exterior walls and stucco , water proof, roof maintenance, coating maintenance , waterproof decks, all repairs to be done same and in kind as existing (not visible from the street)Details
maintenance of existing exterior walls and stucco , water proof, roof maintenance, coating maintenance , waterproof decks, all repairs to be done same and in kind as existing (not visible from the street) | $55,000 |
| Nov 3, 2023 | Completed final sign-off Feb 2024 | 200 Pelican Cove Tr | maintenance of existing exterior walls and stucco , water proof, roof maintenance, coating maintenance , waterproof decks, all repairs to be done same and in kind as existing (not visible from the street)Details
maintenance of existing exterior walls and stucco , water proof, roof maintenance, coating maintenance , waterproof decks, all repairs to be done same and in kind as existing (not visible from the street) | $55,000 |
| Dec 16, 2022 | Completed final sign-off Nov 2024 | 1080 Sutter St | waterproofing, stucco, sheetrock repairs, remove and replace roof decking like for like, install new paversDetails
waterproofing, stucco, sheetrock repairs, remove and replace roof decking like for like, install new pavers | $1,444,000 |
| Jul 8, 2019 | Completed final sign-off Sep 2020 | 610 Illinois St | exterior repair in front, rear and roof deck elevation sheating, re-flash, new metal pan and re set extg windows. repair by plans. n/a for maherDetails
exterior repair in front, rear and roof deck elevation sheating, re-flash, new metal pan and re set extg windows. repair by plans. n/a for maher | $550,000 |
| Sep 18, 2017 | Completed final sign-off Nov 2018 | 50 Lansing St | common area: install new gas bbq on (e) rooftop deck.Details
common area: install new gas bbq on (e) rooftop deck. | $10,000 |
| Sep 11, 2017 | Completed final sign-off Nov 2017 | 3501 Laguna St | to comply with nov 201798091 - install new raised pedestal deck system per plan at existing roof deck common area; raise guardrail height at building front visible from streetDetails
to comply with nov 201798091 - install new raised pedestal deck system per plan at existing roof deck common area; raise guardrail height at building front visible from street | $12,000 |