Andrew Chekene Enterprises/ Dba Ac Enter
- Based in
- Hayward
- On San Francisco permits
- Aug 2007 to Sep 2026
- Last 24 months
- 38 permits filed
428 permits since 2000: 339 completed, 23 in progress, 18 never finaled, 48 expired or cancelled.
Of the 18 never-finaled permits, 5 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
14 stairs permits: 12 completed, 1 never finaled, 1 expired or cancelled. Typically 44 days from filing to permit and 228 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 15, 2024 | Completed final sign-off Apr 2025 | 618 Eugenia Av | revision to 202205265048: modificatoin of previsouly permitted stairs to basement replacemenr of (e) attic accessDetails
revision to 202205265048: modificatoin of previsouly permitted stairs to basement replacemenr of (e) attic access | |
| May 26, 2022 | Completed final sign-off Apr 2025 | 618 Eugenia Av | front bldg interior remodl of (e) 1st fl bathrooms and kitchen; removal and replacement of (e) stair to (e) attic space; structural framing as required to support (n) stair opening and (n) walls; interior cabinetry, interior doors and finish. selection @ basement and main levelsDetails
front bldg interior remodl of (e) 1st fl bathrooms and kitchen; removal and replacement of (e) stair to (e) attic space; structural framing as required to support (n) stair opening and (n) walls; interior cabinetry, interior doors and finish. selection @ basement and main levels | $735,000 |
| Dec 13, 2021 | Completed final sign-off May 2023 | 411 Joost Av | remove outlets and switches. excavate main water supply, sanitary lines and tie into at water meter. demo exterior stairs, deck & concrete steps at rear. demo existing stucco, demo windows and door. remove shingle roofing and sheathing. install new stucco, trim, new windows, 2md fl deck footing...Details
remove outlets and switches. excavate main water supply, sanitary lines and tie into at water meter. demo exterior stairs, deck & concrete steps at rear. demo existing stucco, demo windows and door. remove shingle roofing and sheathing. install new stucco, trim, new windows, 2md fl deck footing... | $200,000 |
| Jan 23, 2021 | Completed final sign-off Apr 2025 | 618 Eugenia Av | alteration of (e) non-conforming basement/ interior remodel & new interior access stair, new light well.structural foundation, floor framing & wall framing to support alterations. remove & replace (e) west courtyard slab & north & south property line fences & gate.Details
alteration of (e) non-conforming basement/ interior remodel & new interior access stair, new light well.structural foundation, floor framing & wall framing to support alterations. remove & replace (e) west courtyard slab & north & south property line fences & gate. | $735,000 |
| Feb 27, 2020 | Completed final sign-off May 2020 | 2790 19th Av | stair repair in kind less than 50%. in (5) locations, repair existing wood handrail, new 4x4 pt post and existing concrete flatwood, existing adjacent wood stair and install new redwood hardrail to match existing.Details
stair repair in kind less than 50%. in (5) locations, repair existing wood handrail, new 4x4 pt post and existing concrete flatwood, existing adjacent wood stair and install new redwood hardrail to match existing. | $45,000 |
| Jul 19, 2019 | Completed final sign-off Oct 2019 | 215 Cole St | repair at rear stairs, less than 50%Details
repair at rear stairs, less than 50% | $2,500 |
| May 8, 2019 | Completed final sign-off Sep 2020 | 2541 California St | remove and replace siding at rear levation, install new moment frame and new footing at rear stair support. in kind deck repairs as needed under 50%. common area.Details
remove and replace siding at rear levation, install new moment frame and new footing at rear stair support. in kind deck repairs as needed under 50%. common area. | $300,000 |
| Sep 10, 2018 | Completed final sign-off Oct 2018 | 704 San Bruno Av | inkind repair of stucco siding approximately 1 ft. high by 35 ft. long along both sides of front entry stairs to install waterproofing, approx. 66 sq. ft.. revision to pa#201808147318Details
inkind repair of stucco siding approximately 1 ft. high by 35 ft. long along both sides of front entry stairs to install waterproofing, approx. 66 sq. ft.. revision to pa#201808147318 | $1,000 |
| May 9, 2018 | Completed final sign-off May 2018 | 3995 Alemany Bl | building 1-2/f: revision to 201601278078. install steel plates under stairsDetails
building 1-2/f: revision to 201601278078. install steel plates under stairs | $10,000 |
| Sep 29, 2017 | Completed final sign-off Apr 2018 | 215 Cole St | replace front façade trim and siding in-kind with cedar and reflash. all front wood windows to be removed and reinstalled. entry stairs replaced in-kind with black slate. replace two steel rear windows and rear steel door. no other work.Details
replace front façade trim and siding in-kind with cedar and reflash. all front wood windows to be removed and reinstalled. entry stairs replaced in-kind with black slate. replace two steel rear windows and rear steel door. no other work. | $250,000 |
| Oct 28, 2014 | Never finaled issued Oct 2015, no final | 2090 Great Hy | extend south stairway to roof. build a roof penthouse on roof. remove (e) fire escape.Details
extend south stairway to roof. build a roof penthouse on roof. remove (e) fire escape. | $40,000 |
| Apr 30, 2014 | Completed final sign-off Jan 2016 | 330 02nd Av | remove (e) 4th floor stair that discharges onto 3rd floor deck, build new 4th floor walkway and stair that ties into main rear egress stairDetails
remove (e) 4th floor stair that discharges onto 3rd floor deck, build new 4th floor walkway and stair that ties into main rear egress stair | $20,000 |
| Jan 8, 2014 | Expired or cancelled cancelled Jan 2026 | 330 02nd Av | install 3 new 45 min fire arated double doors, 1 new window, waterproof rear of building. modify 4th floor stair landing per detaios and install new deck waterproofing per details. common areaDetails
install 3 new 45 min fire arated double doors, 1 new window, waterproof rear of building. modify 4th floor stair landing per detaios and install new deck waterproofing per details. common area | $102,000 |
| Oct 15, 2012 | Completed final sign-off Aug 2013 | 1415 Indiana St | misc common area waterproofing repairs, removal of siding w windows, install gsm head flashing, removal of entry doors. installation of new gsm door pans. removal of concrete sidewalk & re-scope to remove ponding. concrete repairs to stairs & landingsDetails
misc common area waterproofing repairs, removal of siding w windows, install gsm head flashing, removal of entry doors. installation of new gsm door pans. removal of concrete sidewalk & re-scope to remove ponding. concrete repairs to stairs & landings | $140,000 |