Roof deck contractors in San Francisco
1,513 contractors have filed roof deck permits in San Francisco since 2000. By permit record, the leaders are among those with at least 10 permits: R & D Construction Co Inc (21 of 22 completed), Gil Construction & Assoc Inc. (13 of 14 completed) and Cook Construction (10 of 11 completed).
Ranked across every roof deck permit filed since 2000, by the share that reached final inspection, adjusted so a long clean record outranks a short one. Showing contractors with a roof deck permit in the last 5 years. Include inactive contractors
- 1R & D Construction Co IncLicense 825438 22 permits: 21 completed, 1 expired or cancelled. Last filed Oct 2022. Typically 322 days from permit to final inspection.
- 2Gil Construction & Assoc Inc.License 703705 14 permits: 13 completed, 1 expired or cancelled. Last filed Aug 2024. Typically 84 days from permit to final inspection.
- 3Cook ConstructionLicense 903971 11 permits: 10 completed, 1 never finaled. Last filed Jan 2024. Typically 707 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 4Level 8 Construction IncLicense 851171 15 permits: 13 completed, 1 never finaled, 1 expired or cancelled. Last filed Mar 2024. Typically 165 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 5Matarozzi/Pelsinger Builders Inc.License 747611 15 permits: 12 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Last filed Nov 2023. Typically 412 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old.
- 6Eastwood Development IncorporatedLicense 959948 11 permits: 8 completed, 2 in progress, 1 never finaled. Last filed Sep 2026. Typically 236 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old.
- 7S F Garage Company Inc.License 684863 41 permits: 30 completed, 3 never finaled, 8 expired or cancelled. Last filed Sep 2023. Typically 367 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old. 2 were filed but never issued.
- 8Ggd Inc.License 913596 10 permits: 7 completed, 2 in progress, 1 never finaled. Last filed Aug 2025. Typically 448 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old.
- 9Sf Twin Boys Corp. Dba Master BuildersLicense 850407 21 permits: 16 completed, 4 never finaled, 1 expired or cancelled. Last filed Oct 2021. Typically 702 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old, 3 are over 10 years old.
- 10Green City Construction IncLicense 951276 15 permits: 11 completed, 1 in progress, 3 never finaled. Last filed Jul 2026. Typically 472 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
- 11Novo Construction IncLicense 791022 14 permits: 10 completed, 1 in progress, 3 never finaled. Last filed Apr 2025. Typically 328 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old, 2 are over 10 years old.
- 12The Toboni GroupLicense 766215 12 permits: 8 completed, 2 in progress, 2 expired or cancelled. Last filed Aug 2026. Typically 532 days from permit to final inspection.
- 13Bcci Construction CompanyLicense 492944 14 permits: 9 completed, 2 in progress, 3 never finaled. Last filed Sep 2026. Typically 602 days from permit to final inspection. Never finaled: 2 are 3 to 5 years old, 1 is 5 to 10 years old.
- 14Saturn Construction CoLicense 861233 13 permits: 8 completed, 2 in progress, 1 never finaled, 2 expired or cancelled. Last filed Aug 2026. Typically 424 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 15Clayton Timbrell & CoLicense 897643 12 permits: 8 completed, 1 in progress, 3 never finaled. Last filed Apr 2022. Typically 708 days from permit to final inspection. Never finaled: 2 are 3 to 5 years old, 1 is over 10 years old.
- 16Thompson Suskind L PLicense 860556 13 permits: 9 completed, 3 never finaled, 1 expired or cancelled. Last filed May 2022. Typically 472 days from permit to final inspection. Never finaled: 2 are 3 to 5 years old, 1 is over 10 years old.
- 17D3 ConstructionLicense 672385 15 permits: 8 completed, 2 in progress, 2 never finaled, 3 expired or cancelled. Last filed Apr 2026. Typically 240 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old, 1 is over 10 years old.
- 18Citywest Construction Inc.License 927193 14 permits: 8 completed, 1 in progress, 4 never finaled, 1 expired or cancelled. Last filed Jul 2023. Typically 506 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old, 3 are 5 to 10 years old.
- 19Landmark Construction Inc.License 907832 10 permits: 6 completed, 1 never finaled, 3 expired or cancelled. Last filed May 2022. Typically 242 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old. 1 was filed but never issued.
- 20C C I Commercial Construction & ImprovLicense 985808 11 permits: 6 completed, 3 never finaled, 2 expired or cancelled. Last filed Nov 2021. Typically 442 days from permit to final inspection. Never finaled: 3 are 5 to 10 years old.
- 21Ashbury Gen Constructing & EngLicense 826169 11 permits: 5 completed, 3 never finaled, 3 expired or cancelled. Last filed May 2023. Typically 232 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old, 2 are over 10 years old.
- 22Aaron Gordon Construction IncLicense 856802 11 permits: 3 completed, 2 in progress, 2 never finaled, 4 expired or cancelled. Last filed May 2025. Typically 155 days from permit to final inspection. Never finaled: 2 are 5 to 10 years old.
How long roof deck permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent roof deck permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 183 24th Av | to comply with nov 202662646. bathroom relocation of tub. rebuild existing roof deck and make the railing up to code with glass. replace in kind 5 windows on the side of the house. replace in kind knee walls. new full height walls.Details
to comply with nov 202662646. bathroom relocation of tub. rebuild existing roof deck and make the railing up to code with glass. replace in kind 5 windows on the side of the house. replace in kind knee walls. new full height walls. | $15,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 259 17th Av | Sunset Remodeling And Design Inc | 2nd floor: convert existing single hung windows at dining room into a french door(same opening), convert existing single hung window at sunroom into a swing tempered glass door, new 315 sq. ft. roof deck, new wood staircase from roof to rear yard. 3rd fllo: convert (e) bathroom sliding window into aDetails
2nd floor: convert existing single hung windows at dining room into a french door(same opening), convert existing single hung window at sunroom into a swing tempered glass door, new 315 sq. ft. roof deck, new wood staircase from roof to rear yard. 3rd fllo: convert (e) bathroom sliding window into a | $20,000 |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 465 Harkness Av | fill in side yard for new baths & closet @ ground floor.new perimiter footings,new roof deck over to be incombustible material.open wall to expand media room,add beam cols,ftgs as needed.enclosed(e)garage.general mech,elec, & plumb upgrades.Details
fill in side yard for new baths & closet @ ground floor.new perimiter footings,new roof deck over to be incombustible material.open wall to expand media room,add beam cols,ftgs as needed.enclosed(e)garage.general mech,elec, & plumb upgrades. | $80,000 | |
| Oct 1, 2026 | In progress issued Oct 2026 | 738 North Point St | at unit #738 north point st - replace in kind the existing less then 500 sqft roof deck, legalize 48" railing.Details
at unit #738 north point st - replace in kind the existing less then 500 sqft roof deck, legalize 48" railing. | $10,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 36 College Av | 1st floor:comply with nov#202430475,adu including 2 beds,two full baths,living room & kitchen.2nd floor: new roof deck & rear stairs.Details
1st floor:comply with nov#202430475,adu including 2 beds,two full baths,living room & kitchen.2nd floor: new roof deck & rear stairs. | $80,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 4307 17th St | merging the window and door to the 3rd floor roof deck into a bi-part door, no change to existing continuous header. replace additional window in kind. ***deck legalization under permit #202507312078 that needs to be paid for prior to issuance of this permit***Details
merging the window and door to the 3rd floor roof deck into a bi-part door, no change to existing continuous header. replace additional window in kind. ***deck legalization under permit #202507312078 that needs to be paid for prior to issuance of this permit*** | $10,000 | |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 1736 Larkin St | vertical addition:add 3 bedrooms, 1 gym, 3 bathrooms, 1 powder rm, 1 laundry, 1 roof deck on 4th flr. emodel kitchen, dining rm, and add pantry, 1 bath & 1 powder rm on 3rd flr unit 1738.relocate & provide code compaint exterior front main entry landing, redesing interior stair to provide access...Details
vertical addition:add 3 bedrooms, 1 gym, 3 bathrooms, 1 powder rm, 1 laundry, 1 roof deck on 4th flr. emodel kitchen, dining rm, and add pantry, 1 bath & 1 powder rm on 3rd flr unit 1738.relocate & provide code compaint exterior front main entry landing, redesing interior stair to provide access... | $500,000 | |
| Sep 30, 2026 | In progress issued Sep 2026 | 1263 Mission St | add exterior steps to existing roof deck, at existing gate, add fire escape signage. ref pa# 2013-1017-9622.Details
add exterior steps to existing roof deck, at existing gate, add fire escape signage. ref pa# 2013-1017-9622. | $2,800 | |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 341 Park St | revision to pa #202512051094. proposed roof deck on existing one story rear addition. proposed outswing door french door pair in existing wall opening.Details
revision to pa #202512051094. proposed roof deck on existing one story rear addition. proposed outswing door french door pair in existing wall opening. | $40,000 | |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 2756 Greenwich St | Precise Roofing Inc | roof deck replacement like for like on 4/f deck. r/r decking and waterproofing. install new tpo waterproofing membrane and floating deck system. no changes to (e) footprint, railings or structural support system.Details
roof deck replacement like for like on 4/f deck. r/r decking and waterproofing. install new tpo waterproofing membrane and floating deck system. no changes to (e) footprint, railings or structural support system. | $20,000 |
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 1715 22nd St | C D R Construction | exterior renovation of side and rear of bldg at 1st flr only, including new windows on east and south elevation and new walls, roof, and roof deck. new kitchen and bath at 1st flr, new enlarged bath at 2nd flr. new finishes. reconfigure space allocated to each duplex and rated separation as requireDetails
exterior renovation of side and rear of bldg at 1st flr only, including new windows on east and south elevation and new walls, roof, and roof deck. new kitchen and bath at 1st flr, new enlarged bath at 2nd flr. new finishes. reconfigure space allocated to each duplex and rated separation as require | $250,000 |
| Sep 25, 2026 | In progress issued Sep 2026 | 1049 Clay St | replace in kind (e) roof deck with timbertech decking and viewrail cable guardrail system.Details
replace in kind (e) roof deck with timbertech decking and viewrail cable guardrail system. | $70,000 | |
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 451 Pacific Av | exterior scope for this core + shell project. the sow is reflective of the approval certificate of apprioatenss and includes replacement of an existing non-historical glass storefront with glass doors in the courtyard, and replacment of an existing roof deck with guard rails and parcel, (2)accessDetails
exterior scope for this core + shell project. the sow is reflective of the approval certificate of apprioatenss and includes replacement of an existing non-historical glass storefront with glass doors in the courtyard, and replacment of an existing roof deck with guard rails and parcel, (2)access | $250,000 | |
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 44 Ney St | unit will be added per planning code sec 207.2.adu @ garage floor.addition of 446 sq ft @ rear under roof deck for adu.Details
unit will be added per planning code sec 207.2.adu @ garage floor.addition of 446 sq ft @ rear under roof deck for adu. | $110,000 | |
| Sep 23, 2026 | In progress filed Sep 2026, not yet issued | 1203 Stanyan St | install new roof deck guardrails. install new glass door and windows at 1st floor family room. insulate family room. install new mini-split heating at family room and kitchen. replace existing tub with shower. remodel kitchen including enw cabinets, finishes and appliances.Details
install new roof deck guardrails. install new glass door and windows at 1st floor family room. insulate family room. install new mini-split heating at family room and kitchen. replace existing tub with shower. remodel kitchen including enw cabinets, finishes and appliances. | $49,000 | |
| Sep 23, 2026 | In progress filed Sep 2026, not yet issued | 362 Vallejo St | interior remodel of kitchen, living room, and dining at each unit. remodel of existing bath and water closet into one bath at each unit. addition of 490 sq ft roof deck.Details
interior remodel of kitchen, living room, and dining at each unit. remodel of existing bath and water closet into one bath at each unit. addition of 490 sq ft roof deck. | $175,000 | |
| Sep 23, 2026 | In progress filed Sep 2026, not yet issued | 4168 26th St | basement: bathroom remodel, 1-story horizontal addition to rear. (n) deck and stairs to replce (e) 1st floor: kitchen remodel. relocate 1/2 bath. relocate interior stair from 1st floor to basement. (n) door to roof deck to replace (e) 2nd fl: remodel 2 bathrooms. 2(n) windows. (n) laundry closet.Details
basement: bathroom remodel, 1-story horizontal addition to rear. (n) deck and stairs to replce (e) 1st floor: kitchen remodel. relocate 1/2 bath. relocate interior stair from 1st floor to basement. (n) door to roof deck to replace (e) 2nd fl: remodel 2 bathrooms. 2(n) windows. (n) laundry closet. | $330,000 | |
| Sep 21, 2026 | In progress issued Sep 2026 | 1156 Dolores St | Eastwood Development Incorporated | repair (e) 4/f roof deck. remove,salvate an reinstall (e) ipe decking as required for roofing and waterproofing repairs. replace damaged material and tile as necessary, not to exceed 50% replacement. no change to deck footprint.Details
repair (e) 4/f roof deck. remove,salvate an reinstall (e) ipe decking as required for roofing and waterproofing repairs. replace damaged material and tile as necessary, not to exceed 50% replacement. no change to deck footprint. | $79,490 |
| Sep 20, 2026 | In progress filed Sep 2026, not yet issued | 4150 Cesar Chavez St | correct nov# 2026-50762. at unit #6 on 4th floor; 1)new roof deck, private to unit #6. 2) replace exterior door. items #2,4, and 5 removed from scope. 8/27/26Details
correct nov# 2026-50762. at unit #6 on 4th floor; 1)new roof deck, private to unit #6. 2) replace exterior door. items #2,4, and 5 removed from scope. 8/27/26 | $25,000 | |
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 280 Green St | Manzyuk Enterprises Inc | building modernization and voluntary seismic upgrade. remodel of 6 kitchens and 6 bathrooms. construction of 2 new bathrooms. replacement of all aluminium windows. rmeodel of roof deck.Details
building modernization and voluntary seismic upgrade. remodel of 6 kitchens and 6 bathrooms. construction of 2 new bathrooms. replacement of all aluminium windows. rmeodel of roof deck. | $147,500 |
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 279 Diamond St | Centoni Restoration & Development | horizontal addition at rear 1st floor and 2nd floor, new roof deck over 1st floor, new stairs to rear yard.Details
horizontal addition at rear 1st floor and 2nd floor, new roof deck over 1st floor, new stairs to rear yard. | $100,000 |
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 2921 Wawona St | to comply with nov. 202183704 - demolish unpermitted roof cover rear roof deck. remove and replace rear roof deck tile finishes. remove and replace rear wall siding above roof deck.Details
to comply with nov. 202183704 - demolish unpermitted roof cover rear roof deck. remove and replace rear roof deck tile finishes. remove and replace rear wall siding above roof deck. | $20,000 | |
| Sep 16, 2026 | In progress issued Sep 2026 | 134 Cotter St | Central Roofing Co. | to cut roof deck and install 6" roof vent to existing roof. install 4 lodw profile roof/eyebrow vents. no mech or electrical per david jones.Details
to cut roof deck and install 6" roof vent to existing roof. install 4 lodw profile roof/eyebrow vents. no mech or electrical per david jones. | $2,500 |
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 1 Montgomery St | Bcci Construction Company | t.i. to basement,1/f,2/f,mezz: addition of bars at basement and g/f levels. minor alt to exterior and roof deck. all alteration to character defining features of the landmark to be pursuant to the aproved coa per planning motion m-514.Details
t.i. to basement,1/f,2/f,mezz: addition of bars at basement and g/f levels. minor alt to exterior and roof deck. all alteration to character defining features of the landmark to be pursuant to the aproved coa per planning motion m-514. | $15,000,000 |
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 25 Montgomery St | Bcci Construction Company | t.i. to basement,1/f,2/f,mezz: addition of bars at basement and g/f levels. minor alt to exterior and roof deck. all alteration to character defining features of the landmark to be pursuant to the aproved coa per planning motion m-514; concurrent with pa202609158114.Details
t.i. to basement,1/f,2/f,mezz: addition of bars at basement and g/f levels. minor alt to exterior and roof deck. all alteration to character defining features of the landmark to be pursuant to the aproved coa per planning motion m-514; concurrent with pa202609158114. | |
| Sep 14, 2026 | In progress filed Sep 2026, not yet issued | 730 Edinburgh St | demolition of (e) 383 s.f. bedroom of the 2nd floor of (e) residence & covert to roof deck. remodel (e) family room, bedroom, and bathroom on ground floor, & kitchen on 2nd floor of (e) residence.Details
demolition of (e) 383 s.f. bedroom of the 2nd floor of (e) residence & covert to roof deck. remodel (e) family room, bedroom, and bathroom on ground floor, & kitchen on 2nd floor of (e) residence. | $160,000 | |
| Sep 14, 2026 | In progress filed Sep 2026, not yet issued | 1907 Union St | to comply with nov 202541199 for prefab sauna and cold plunge on (e) roof deckDetails
to comply with nov 202541199 for prefab sauna and cold plunge on (e) roof deck | ||
| Sep 11, 2026 | In progress filed Sep 2026, not yet issued | 1380 Noe St | Kyle Gleason And Sons | h & v addition to (e) upper unit (1380 noe street). addition to add 1,173 sq.ft onto rear of (e) structure. addition 3 bedrooms, 2 bathrooms, laundry & roof deck. legalization of (e) 2nd floor unit (1382 noe street) as a density conforming dwelling unit within rh-2 zoning district. ab-112Details
h & v addition to (e) upper unit (1380 noe street). addition to add 1,173 sq.ft onto rear of (e) structure. addition 3 bedrooms, 2 bathrooms, laundry & roof deck. legalization of (e) 2nd floor unit (1382 noe street) as a density conforming dwelling unit within rh-2 zoning district. ab-112 | $300,000 |
| Sep 10, 2026 | In progress filed Sep 2026, not yet issued | 600 California St | 5th fl: improvements include the demo of non-structural partitions and building new roof deck pedestal and pavers and planters, and exit access corridor. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered)Details
5th fl: improvements include the demo of non-structural partitions and building new roof deck pedestal and pavers and planters, and exit access corridor. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered) | $2,750,000 | |
| Sep 9, 2026 | In progress filed Sep 2026, not yet issued | 38 Portola Dr | remodel: window replacement in-kind for entire house. relocate interior staircase. remodel (e) bedroom, powder room, kitchen at 2/f and (e) bedroom & baths on 3/f. reconfig 2 (e) bedrooms into 1 new master suite at 3/f. add (n) deck and new roof deck with spiral staircase.Details
remodel: window replacement in-kind for entire house. relocate interior staircase. remodel (e) bedroom, powder room, kitchen at 2/f and (e) bedroom & baths on 3/f. reconfig 2 (e) bedrooms into 1 new master suite at 3/f. add (n) deck and new roof deck with spiral staircase. | $125,000 |