The Great Ocean General Contractor
- Based in
- San Francisco
- On San Francisco permits
- Jun 2012 to Feb 2023
- Last 24 months
- 0 permits filed
153 permits since 2000: 134 completed, 6 never finaled, 13 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Roof deck permits
5 roof deck permits: 5 completed. Typically 96 days from filing to permit and 342 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2022 | Completed final sign-off Dec 2022 | 15 26th Av | repair water damage on roof deck above the garage, remove (5) existing windows and reinstall same windows after. replace roffed deck frame and deck boards. re-roofing the garage areas. patch wall stuccos. repair drywalls.Details
repair water damage on roof deck above the garage, remove (5) existing windows and reinstall same windows after. replace roffed deck frame and deck boards. re-roofing the garage areas. patch wall stuccos. repair drywalls. | $17,300 |
| Aug 27, 2021 | Completed final sign-off Mar 2023 | 3817 Folsom St | relocate (e) kitchen, bathroom and living room on 1/f per plan. remove (e) 1 bathroom on 2/f per plan and remodel the (e) kitchen and (e) bathroom on 2/f. convert the (e) family room on 3/f into a master bedroom. new roof deck with stairs ref2018-008954enf. rev. 201710252224 and 201810052437.Details
relocate (e) kitchen, bathroom and living room on 1/f per plan. remove (e) 1 bathroom on 2/f per plan and remodel the (e) kitchen and (e) bathroom on 2/f. convert the (e) family room on 3/f into a master bedroom. new roof deck with stairs ref2018-008954enf. rev. 201710252224 and 201810052437. | $15,000 |
| Dec 4, 2019 | Completed final sign-off Nov 2020 | 56 Macedonia St | remodel (e) master bedroom & master bathroom on ground fl: per plan,open kitchen reomdel on 2nd fl. per plan, remodel bathroom on 2nd fl. remodel (e) deck & stair case at rear, add new roof deck, upgrade (e) elec main , install high efficacy lights to whole houseDetails
remodel (e) master bedroom & master bathroom on ground fl: per plan,open kitchen reomdel on 2nd fl. per plan, remodel bathroom on 2nd fl. remodel (e) deck & stair case at rear, add new roof deck, upgrade (e) elec main , install high efficacy lights to whole house | $80,000 |
| Nov 27, 2017 | Completed final sign-off Apr 2023 | 3817 Folsom St | grnd flr: convert (e) first floor to (n) family room. provide (n) 1/2 bath. 2nd flr: remove (e) deck. 3rd flr: provide (2) new roof decks at front & rear.Details
grnd flr: convert (e) first floor to (n) family room. provide (n) 1/2 bath. 2nd flr: remove (e) deck. 3rd flr: provide (2) new roof decks at front & rear. | $40,000 |
| Jun 14, 2017 | Completed final sign-off Jun 2018 | 318 Ridgewood Av | garage conversion adding 2 bedrooms, family rm, 1 full bath, new elec lighting thoughout. laundry/utility in garage. 2nd fl remodel 2 bedrooms, 2 baths, kitchen, add roof deck, new hvacDetails
garage conversion adding 2 bedrooms, family rm, 1 full bath, new elec lighting thoughout. laundry/utility in garage. 2nd fl remodel 2 bedrooms, 2 baths, kitchen, add roof deck, new hvac | $150,000 |