Back to bathroom remodel contractors
The Great Ocean General Contractor
- Based in
- San Francisco
- On San Francisco permits
- Jun 2012 to Feb 2023
- Last 24 months
- 0 permits filed
153 permits since 2000: 134 completed, 6 never finaled, 13 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
83 bathroom remodel permits: 75 completed, 2 never finaled, 6 expired or cancelled. Typically 10 days from filing to permit and 189 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 11, 2022 | Completed final sign-off Dec 2023 | 446 31st Av | remodel kitchen and 1.5 bathroom. replace all front windows to wood window same size and same opening. replace all rear windows to vinyle window same size & same openingDetails
remodel kitchen and 1.5 bathroom. replace all front windows to wood window same size and same opening. replace all rear windows to vinyle window same size & same opening | $46,000 |
| Jul 11, 2022 | Completed final sign-off Dec 2022 | 49 Barcelona Av | rev to pa202206156385: remodel (e) bathrooms on each floor. remodel the kitchen on each floor. add and remove walls per plans. add 3 skylihgts on roof. turn 1st floor closet into a full bathroom. install shower pan, toilet and vanity. back to back of current bathroom.Details
rev to pa202206156385: remodel (e) bathrooms on each floor. remodel the kitchen on each floor. add and remove walls per plans. add 3 skylihgts on roof. turn 1st floor closet into a full bathroom. install shower pan, toilet and vanity. back to back of current bathroom. | $50,000 |
| Jun 15, 2022 | Completed final sign-off Dec 2022 | 49 Barcelona Av | remodel 1 kitchen and 2 bathrooms on 2nd floor. like for like. install new cabinets, countertops, vanities, & bathroom entry doors.Details
remodel 1 kitchen and 2 bathrooms on 2nd floor. like for like. install new cabinets, countertops, vanities, & bathroom entry doors. | $64,000 |
| Jun 15, 2022 | Completed final sign-off Dec 2022 | 51 Barcelona Av | remodel 1 kitchen and 2 bathrooms on 3rd floor. remodel 1 bathroom on 1st floor like for like. install new cabinets, countertops, vanities, & bathroom entry doors.Details
remodel 1 kitchen and 2 bathrooms on 3rd floor. remodel 1 bathroom on 1st floor like for like. install new cabinets, countertops, vanities, & bathroom entry doors. | $64,000 |
| Apr 27, 2022 | Completed final sign-off Apr 2023 | 785 39th Av | add 1 office, bedroom, closet, bathroom, family room and wetbar on 1/f. relocate washer/dryer, water heater, and furnace to garage. redesigns interior staircase b/t 1/f & 2/f. relocate kitchen & dining on 2/f. add 1 bedroom, closet & master bedr on 2/f.Details
add 1 office, bedroom, closet, bathroom, family room and wetbar on 1/f. relocate washer/dryer, water heater, and furnace to garage. redesigns interior staircase b/t 1/f & 2/f. relocate kitchen & dining on 2/f. add 1 bedroom, closet & master bedr on 2/f. | $80,000 |
| Dec 23, 2021 | Never finaled issued Jan 2022, no final | 659 27th Av | reconfigure (e) interior staircase to open style. relocate (e) laundry on 1/f. relocate the (e) kitchen and (e) dining room on 2/f per plan. add 1 bedroom, 1 bathroom and 1 closet on 2/f per plan. new skylights.Details
reconfigure (e) interior staircase to open style. relocate (e) laundry on 1/f. relocate the (e) kitchen and (e) dining room on 2/f per plan. add 1 bedroom, 1 bathroom and 1 closet on 2/f per plan. new skylights. | $35,000 |
| Dec 2, 2021 | Completed final sign-off Jun 2022 | 80 Molimo Dr | relocate bathroom and add laundry room on 1/f. relocate interior stairscase. remodel (e) kitchen, living room and living room on 2/f. add (n) bathroom on 2/f. replace water heater with tankless.replace window with sliding door on 2/f.Details
relocate bathroom and add laundry room on 1/f. relocate interior stairscase. remodel (e) kitchen, living room and living room on 2/f. add (n) bathroom on 2/f. replace water heater with tankless.replace window with sliding door on 2/f. | $200,000 |
| Dec 1, 2021 | Completed final sign-off Apr 2023 | 424 Avalon Av | add interior staircase between 1/f & 2/f. add (n) home office, bathroom, home meida on 1/f. relocate the (e) bathroom , bedroom & kitchen on 2/f per plan. relocate furnance to attic. relocate the water heater to outdoor.Details
add interior staircase between 1/f & 2/f. add (n) home office, bathroom, home meida on 1/f. relocate the (e) bathroom , bedroom & kitchen on 2/f per plan. relocate furnance to attic. relocate the water heater to outdoor. | $70,000 |
| Sep 29, 2021 | Completed final sign-off Jan 2022 | 1665 17th Av | remodel lower fl. bathroom and powder rm. like to like, replace 2 toilets, 1 bathtub, 2 vanities,install bathroom exhause fans connect to (e) duct, new lights (h.e. lighting & vacancy sensor), install wall tiles and floor tiles.Details
remodel lower fl. bathroom and powder rm. like to like, replace 2 toilets, 1 bathtub, 2 vanities,install bathroom exhause fans connect to (e) duct, new lights (h.e. lighting & vacancy sensor), install wall tiles and floor tiles. | $25,000 |
| Sep 29, 2021 | Completed final sign-off Dec 2021 | 90 Denslowe Dr | remodel one 1st fl. bathroom, like for like, install shower pan 1 toilet, 1 vanity, wall tiles and floor tilesDetails
remodel one 1st fl. bathroom, like for like, install shower pan 1 toilet, 1 vanity, wall tiles and floor tiles | $10,000 |
| Sep 22, 2021 | Completed final sign-off Dec 2021 | 312 Mount Vernon Av | to comply with complaint 202179604. remodel of (e) bathrooms, office and bedroom on 1/f per plan. add 3rd bathroom on 1/f.Details
to comply with complaint 202179604. remodel of (e) bathrooms, office and bedroom on 1/f per plan. add 3rd bathroom on 1/f. | $50,000 |
| Aug 27, 2021 | Completed final sign-off Mar 2023 | 3817 Folsom St | relocate (e) kitchen, bathroom and living room on 1/f per plan. remove (e) 1 bathroom on 2/f per plan and remodel the (e) kitchen and (e) bathroom on 2/f. convert the (e) family room on 3/f into a master bedroom. new roof deck with stairs ref2018-008954enf. rev. 201710252224 and 201810052437.Details
relocate (e) kitchen, bathroom and living room on 1/f per plan. remove (e) 1 bathroom on 2/f per plan and remodel the (e) kitchen and (e) bathroom on 2/f. convert the (e) family room on 3/f into a master bedroom. new roof deck with stairs ref2018-008954enf. rev. 201710252224 and 201810052437. | $15,000 |
| Jun 4, 2021 | Completed final sign-off Dec 2022 | 25 Pueblo St | a.d.u. per ordinance 162-16 on 1st floor add one living room , office and one kitchen; relocate two 3-fixture bathroomDetails
a.d.u. per ordinance 162-16 on 1st floor add one living room , office and one kitchen; relocate two 3-fixture bathroom | $40,000 |
| May 26, 2021 | Completed final sign-off Jul 2021 | 1471 Mcallister St | retiled master bathroom. install new plumbing fixtures, shower door, wall lights. retiled hall bathroom, install new tub & toilet.Details
retiled master bathroom. install new plumbing fixtures, shower door, wall lights. retiled hall bathroom, install new tub & toilet. | $12,500 |
| Apr 29, 2021 | Expired or cancelled withdrawn May 2021 | 1388 Alabama St | relocate (e) bedroom on 3/f at nit 1388 per plan, add 1 bathroom, 1 new storage and 1 closet per plan. all work on 3/f under this permit.Details
relocate (e) bedroom on 3/f at nit 1388 per plan, add 1 bathroom, 1 new storage and 1 closet per plan. all work on 3/f under this permit. | $80,000 |
| Mar 22, 2021 | Completed final sign-off Dec 2021 | 675 29th Av | revision to no-plan pa# 202102164677. reconfigure (e) interior staircase to open style. add 1 bath, 1 bed, 1 closet, 1 family & office at 1st fl. redesign (e) laundry on 1st fl. relocate kitchen & dining on 2nd fl. add 1 bed, 1 bath, 1 closet on 2nd fl. reconfigure (e) rear staircase up to code.Details
revision to no-plan pa# 202102164677. reconfigure (e) interior staircase to open style. add 1 bath, 1 bed, 1 closet, 1 family & office at 1st fl. redesign (e) laundry on 1st fl. relocate kitchen & dining on 2nd fl. add 1 bed, 1 bath, 1 closet on 2nd fl. reconfigure (e) rear staircase up to code. | $100,000 |
| Feb 18, 2021 | Completed final sign-off Sep 2021 | 1390 Alabama St | convert the (e) bedroom into (n) dining room on 2nd fl.relocate (e) bedroom on 2nd fl. add one (n) bathroom, one (n) storage, and one (n) closet on 2nd fl. all work on 2nd fl. only under this permit amend to pa# 202101253206Details
convert the (e) bedroom into (n) dining room on 2nd fl.relocate (e) bedroom on 2nd fl. add one (n) bathroom, one (n) storage, and one (n) closet on 2nd fl. all work on 2nd fl. only under this permit amend to pa# 202101253206 | $80,000 |
| Feb 16, 2021 | Completed final sign-off Dec 2021 | 675 29th Av | remodel kitchen and 2 existing bathrooms ( 1 full bath at 2nd floor, half bath at basement level). replace wall plaster to sheetrock at kitchen. upgrade electrical and plumbing, install new furnace.Details
remodel kitchen and 2 existing bathrooms ( 1 full bath at 2nd floor, half bath at basement level). replace wall plaster to sheetrock at kitchen. upgrade electrical and plumbing, install new furnace. | $85,000 |
| Jan 25, 2021 | Completed final sign-off Sep 2021 | 1390 Alabama St | remodel 1 kitchen and 1 bathrooms, replace all interior doors, flooring, remove sheetrock for electrical and plumbing upgrade works, both bathroom and kitchen windows are facing to the side & rear of the building.Details
remodel 1 kitchen and 1 bathrooms, replace all interior doors, flooring, remove sheetrock for electrical and plumbing upgrade works, both bathroom and kitchen windows are facing to the side & rear of the building. | $62,500 |
| Jan 7, 2021 | Completed final sign-off Sep 2021 | 2371 16th Av | kitchen and bathroom remodel, additional new bathroom, reconfigure master bathroom, remove/replace windows, relocate electrical main panel, electrical meter, install light fixture, install wood gateDetails
kitchen and bathroom remodel, additional new bathroom, reconfigure master bathroom, remove/replace windows, relocate electrical main panel, electrical meter, install light fixture, install wood gate | $100,000 |
| Dec 22, 2020 | Expired or cancelled expired Sep 2025 | 49 Barcelona Av | install furnace & ac, new water heaters, upgrade electrical, add 1 entry door for lower floor office, remove ceily sheetrock, install sound proof insulation & sound board, adding recess lights, run plumbing pipes & gas line for laundry room, patch wall & ceiling sheetrock. no work at kitchen & bath.Details
install furnace & ac, new water heaters, upgrade electrical, add 1 entry door for lower floor office, remove ceily sheetrock, install sound proof insulation & sound board, adding recess lights, run plumbing pipes & gas line for laundry room, patch wall & ceiling sheetrock. no work at kitchen & bath. | $5,720 |
| Nov 10, 2020 | Completed final sign-off Feb 2021 | 2501 Lincoln Wy | 1/f: remodel bathroom, like to like, replace bathtub & toilet, vanity and wall tile, replace exhaust fan, replace living room plaster ceiling, add recess lights for living rm & dining rm. add entry door for garage storage. install stairs raling and fire rated entry door.Details
1/f: remodel bathroom, like to like, replace bathtub & toilet, vanity and wall tile, replace exhaust fan, replace living room plaster ceiling, add recess lights for living rm & dining rm. add entry door for garage storage. install stairs raling and fire rated entry door. | $26,000 |
| Oct 28, 2020 | Completed final sign-off Feb 2021 | 2501 Lincoln Wy | remodel 1 kitchen and 1 bathroom in-kind. replace cabinets, appliances, countertop. replace tub, toilet, vanity & tiles.Details
remodel 1 kitchen and 1 bathroom in-kind. replace cabinets, appliances, countertop. replace tub, toilet, vanity & tiles. | $33,000 |
| Oct 28, 2020 | Completed final sign-off May 2021 | 1244 12th Av | revision to pa# 202010206918. kitchen and bathroom remodel on 3rd flr. remove interior wall between living room & dining room on 3rd flr. relocate interior door in (e) garage on ground flr.Details
revision to pa# 202010206918. kitchen and bathroom remodel on 3rd flr. remove interior wall between living room & dining room on 3rd flr. relocate interior door in (e) garage on ground flr. | $5,000 |
| Oct 20, 2020 | Completed final sign-off May 2021 | 1244 12th Av | remodel kitchen and 1.5 bathrooms, like to like. install new shower pan, toilets, vanities, kitchen cabinets, countertop, appliances, and exchange fans. new plumbing fixtures and new lightingDetails
remodel kitchen and 1.5 bathrooms, like to like. install new shower pan, toilets, vanities, kitchen cabinets, countertop, appliances, and exchange fans. new plumbing fixtures and new lighting | $42,000 |
| Oct 20, 2020 | Completed final sign-off Jul 2021 | 1392 Alabama St | remodel kitchen and bathrooms like to like. install new kitchen cabinets and countertop, new appliances, install shower pan, toilte, vanity, and sink. add lights and exchange fans. install new wood floor and tiles. replace existing plaster to dry wallDetails
remodel kitchen and bathrooms like to like. install new kitchen cabinets and countertop, new appliances, install shower pan, toilte, vanity, and sink. add lights and exchange fans. install new wood floor and tiles. replace existing plaster to dry wall | $37,500 |
| Oct 19, 2020 | Completed final sign-off Jul 2021 | 1392 Alabama St | remodel (e) kitchen & (e) bathroom in 1st flr unit plan. convert (e0 bedroom to (n) master bedroom on 1st flr. convert (e) office into (n) bedroom on 1st flr.Details
remodel (e) kitchen & (e) bathroom in 1st flr unit plan. convert (e0 bedroom to (n) master bedroom on 1st flr. convert (e) office into (n) bedroom on 1st flr. | $50,000 |
| Oct 2, 2020 | Completed final sign-off Jul 2021 | 1388 Alabama St | rev to pa201902193270: decay repair 2/f: replace decay roof framing, studs and sheathing as-is in-kind. kitchen and 2-1/2 bathroom remodel, ref complaint #202048553.Details
rev to pa201902193270: decay repair 2/f: replace decay roof framing, studs and sheathing as-is in-kind. kitchen and 2-1/2 bathroom remodel, ref complaint #202048553. | $5,000 |
| Sep 12, 2020 | Completed final sign-off Mar 2021 | 1099 Mississippi St | change (e) closet to be bathroomDetails
change (e) closet to be bathroom | $10,000 |
| Aug 4, 2020 | Expired or cancelled revoked Nov 2020 | 1681 10th Av | remodel current kitchen and bathrooms. like to like. same location electrical and plumbing upgrades, under ground plumbing work. 2 bathroom.Details
remodel current kitchen and bathrooms. like to like. same location electrical and plumbing upgrades, under ground plumbing work. 2 bathroom. | $45,000 |
| Dec 27, 2019 | Completed final sign-off May 2020 | 4096 17th St | kitchen and bath remodel. replace cabinets, countertop, new appliances, flooring, vanity cabinet, toilet. ele, and plumb, like like, same locationDetails
kitchen and bath remodel. replace cabinets, countertop, new appliances, flooring, vanity cabinet, toilet. ele, and plumb, like like, same location | $36,000 |
| Dec 4, 2019 | Completed final sign-off Nov 2020 | 56 Macedonia St | remodel (e) master bedroom & master bathroom on ground fl: per plan,open kitchen reomdel on 2nd fl. per plan, remodel bathroom on 2nd fl. remodel (e) deck & stair case at rear, add new roof deck, upgrade (e) elec main , install high efficacy lights to whole houseDetails
remodel (e) master bedroom & master bathroom on ground fl: per plan,open kitchen reomdel on 2nd fl. per plan, remodel bathroom on 2nd fl. remodel (e) deck & stair case at rear, add new roof deck, upgrade (e) elec main , install high efficacy lights to whole house | $80,000 |
| Nov 12, 2019 | Completed final sign-off Feb 2021 | 1442 Alabama St | redesign interior staircase & add elevator between 1st & 2nd floor. convert existing mech room into 2 bedrooms. add one bathroon on 1st floor per plan. change existing full bath to master bedroom. kitchen remodel. convert existing storage on attic to 2 bedroom 1 bathDetails
redesign interior staircase & add elevator between 1st & 2nd floor. convert existing mech room into 2 bedrooms. add one bathroon on 1st floor per plan. change existing full bath to master bedroom. kitchen remodel. convert existing storage on attic to 2 bedroom 1 bath | $50,000 |
| Oct 9, 2019 | Completed final sign-off Dec 2019 | 4222 Moraga St | 2 bathroom remodel, install i bath tub, vanities, toilets. in kind.Details
2 bathroom remodel, install i bath tub, vanities, toilets. in kind. | $11,000 |
| Sep 24, 2019 | Completed final sign-off Jan 2020 | 2263 Fulton St | remodel bathroom in kind. like for lik. install bathtub, toilet, vanity, and plumbing fixtures. replace water heater.Details
remodel bathroom in kind. like for lik. install bathtub, toilet, vanity, and plumbing fixtures. replace water heater. | $11,000 |
| Sep 3, 2019 | Completed final sign-off Nov 2019 | 2275 26th Av | remodel bathroom: install showr pan, vanity, toilet, upgrade bathroom electrical & plumbing fiturs. rpelace bathroom window & all bedroom windows (non-street visble). no change of (e) floor plan.Details
remodel bathroom: install showr pan, vanity, toilet, upgrade bathroom electrical & plumbing fiturs. rpelace bathroom window & all bedroom windows (non-street visble). no change of (e) floor plan. | $27,500 |
| Jun 7, 2019 | Completed final sign-off Oct 2019 | 236 Santa Rosa Av | revision to pa 201904047148. add laundry, mech rm, storage rm, fam rm at 1st flr. relocate (e) door at rear on 1st flr. enlarge (e) powder rm. 2 (e) master closets, 2 (e) master baths on 2nd flr. reconfig (e) rear wooden deck. replace rear door to window in (e) bedrm, add a (n) door at rear on 2ndDetails
revision to pa 201904047148. add laundry, mech rm, storage rm, fam rm at 1st flr. relocate (e) door at rear on 1st flr. enlarge (e) powder rm. 2 (e) master closets, 2 (e) master baths on 2nd flr. reconfig (e) rear wooden deck. replace rear door to window in (e) bedrm, add a (n) door at rear on 2nd | |
| May 20, 2019 | Completed final sign-off Oct 2019 | 420 Pope St | add one entertainment room, one bathroom, and one wet bar on 1st floor per plans. add one bathroom and one skylight on 2nd floor per plans.Details
add one entertainment room, one bathroom, and one wet bar on 1st floor per plans. add one bathroom and one skylight on 2nd floor per plans. | $30,000 |
| May 15, 2019 | Completed final sign-off Feb 2020 | 1024 Anza St | remodel to (e) non sprinklered 3rd fl unit - kitchens to be fully remodeled. (e) bathroom to be converted into a remodeled master bathroom and (n) 2nd bathroom to be created. some changes to windows @ light wells and back of unit. no changes to street facing windows. no expansion of buildingDetails
remodel to (e) non sprinklered 3rd fl unit - kitchens to be fully remodeled. (e) bathroom to be converted into a remodeled master bathroom and (n) 2nd bathroom to be created. some changes to windows @ light wells and back of unit. no changes to street facing windows. no expansion of building | $250,000 |
| May 1, 2019 | Completed final sign-off Aug 2019 | 246 12th Av | #1: kitchen and bathroom remodeling, like for like, install new cabinets & countertops, appliances, new shower pan, toilet and vanity.Details
#1: kitchen and bathroom remodeling, like for like, install new cabinets & countertops, appliances, new shower pan, toilet and vanity. | $17,500 |
| Apr 4, 2019 | Completed final sign-off Oct 2019 | 236 Santa Rosa Av | add 1 bedroom and 1 bath on 1st fl per plan, relocate e staircase per plan, add one powder room and 1 bath on 2nd fl per plan revision to 201902072321Details
add 1 bedroom and 1 bath on 1st fl per plan, relocate e staircase per plan, add one powder room and 1 bath on 2nd fl per plan revision to 201902072321 | $50,000 |
| Mar 27, 2019 | Completed final sign-off Aug 2019 | 246 12th Av | unit #3: removal of 2 kitchen walls and support beams added; remodel kitchen & bathroom in-kind, install new subpanelDetails
unit #3: removal of 2 kitchen walls and support beams added; remodel kitchen & bathroom in-kind, install new subpanel | $35,000 |
| Mar 19, 2019 | Completed final sign-off Jun 2019 | 451 Union St | remodel kitchen & bathroom. install new cabinets & countertop, install bathrub & vanity, toilet & sink, new appliances.Details
remodel kitchen & bathroom. install new cabinets & countertop, install bathrub & vanity, toilet & sink, new appliances. | $17,800 |
| Feb 19, 2019 | Completed final sign-off Jul 2021 | 1388 Alabama St | rear bldg: legalize unit per ord no. 43-14 at rear detached bldg w/ three bedroom and 2.5 bathrooms.Details
rear bldg: legalize unit per ord no. 43-14 at rear detached bldg w/ three bedroom and 2.5 bathrooms. | $14,000 |
| Feb 7, 2019 | Completed final sign-off Oct 2019 | 236 Santa Rosa Av | kitchen and bath remodel, electrical upgrade, plumbing upgrade, install new furnace system, 2 shower pans and underground plumbing, like for like.Details
kitchen and bath remodel, electrical upgrade, plumbing upgrade, install new furnace system, 2 shower pans and underground plumbing, like for like. | $42,000 |
| Feb 7, 2019 | Completed final sign-off May 2019 | 2354 40th Av | remodeling 2 bathrooms, install 1 tub, 1 shower, new fixtures & tiles. like to like, same location.Details
remodeling 2 bathrooms, install 1 tub, 1 shower, new fixtures & tiles. like to like, same location. | $21,000 |
| Nov 15, 2018 | Completed final sign-off Feb 2019 | 214 Olmstead St | as-built (legalize) bathroom on 2nd and 1st fl per plan.Details
as-built (legalize) bathroom on 2nd and 1st fl per plan. | $5,000 |
| Oct 30, 2018 | Completed final sign-off Oct 2019 | 3538 San Bruno Av | interior alteration. add 1 (n) laundry, 1 master bed, 1 bathrom, 1 walk-in closet at 1st flr. w/ new interior connection per plan. legalize master bath at 2nd flr per plan. n/a for maher.Details
interior alteration. add 1 (n) laundry, 1 master bed, 1 bathrom, 1 walk-in closet at 1st flr. w/ new interior connection per plan. legalize master bath at 2nd flr per plan. n/a for maher. | $12,000 |
| Oct 26, 2018 | Completed final sign-off Mar 2019 | 711 29th Av | revision to pa #201805179442, to enclose (e) lightwell and add (n) skylights on 2nd fl per plan. minor alteration to bathroom & closet location on 1st & 2nd fl per plan.Details
revision to pa #201805179442, to enclose (e) lightwell and add (n) skylights on 2nd fl per plan. minor alteration to bathroom & closet location on 1st & 2nd fl per plan. | |
| Oct 5, 2018 | Completed final sign-off Mar 2023 | 3817 Folsom St | legalization of dwelling unit (1 bedroom & 1 bath) per ord# 43-14.Details
legalization of dwelling unit (1 bedroom & 1 bath) per ord# 43-14. | $12,500 |
| Sep 14, 2018 | Completed final sign-off Jan 2019 | 1381 Masonic Av | kitchen & bathroom remodel, remove dining room non-bearing wall, install new cabinets & countertop, new lighting & new plumbing fixtures. enlarge bathroom showerpan, toilet relocation. upgrade laundry room, install new washer & dryer.Details
kitchen & bathroom remodel, remove dining room non-bearing wall, install new cabinets & countertop, new lighting & new plumbing fixtures. enlarge bathroom showerpan, toilet relocation. upgrade laundry room, install new washer & dryer. | $25,000 |
| Aug 1, 2018 | Completed final sign-off Nov 2018 | 523 38th Av | upgrade electrical panel and remodel bathroom and ktichen with new lighting, flooring, counters, cabinets.Details
upgrade electrical panel and remodel bathroom and ktichen with new lighting, flooring, counters, cabinets. | $40,000 |
| Jul 16, 2018 | Completed final sign-off Jul 2019 | 50 Borica St | 1/f: add 1 guest room, 1 laundry room, 1 family room, 1 play room, 1 office, 1 media room, 2 bathrooms, 1 powder room and 1 mechanical room, per plans.Details
1/f: add 1 guest room, 1 laundry room, 1 family room, 1 play room, 1 office, 1 media room, 2 bathrooms, 1 powder room and 1 mechanical room, per plans. | $35,000 |
| Jul 12, 2018 | Completed final sign-off Sep 2018 | 1655 Hyde St | apt #5: replace kitchen cabniets & appliances, replace bathroom wall & floor tiles, install vinyn & toilet. install led recess lights for bedroom & living room. replace bathroom skylight & exhaust fan in kind. no structural work. cec 150.0(k)Details
apt #5: replace kitchen cabniets & appliances, replace bathroom wall & floor tiles, install vinyn & toilet. install led recess lights for bedroom & living room. replace bathroom skylight & exhaust fan in kind. no structural work. cec 150.0(k) | $12,000 |
| May 25, 2018 | Completed final sign-off Feb 2019 | 570 07th Av | 1st fl. new media room, guest bath laundry rm & bedroom, 2nd fl.kitchen & bath remodel, 3rd fl. adding bath & skilights, remodel bath, general new replacement doors & windows in kind at east facade, siding repairs & existing decks repair as required in kind, all new interior doorsDetails
1st fl. new media room, guest bath laundry rm & bedroom, 2nd fl.kitchen & bath remodel, 3rd fl. adding bath & skilights, remodel bath, general new replacement doors & windows in kind at east facade, siding repairs & existing decks repair as required in kind, all new interior doors | $180,000 |
| May 22, 2018 | Expired or cancelled cancelled Jan 2026 | 570 07th Av | interior remodel, 1st fl media and bedroom, full bath and laundry rm. 2nd fl kitchen and bath remodel, 3rd fl add bath, skylights. underground plumbing, elec upgrades, replace all windows, stucco and siding repair, minor deck repairDetails
interior remodel, 1st fl media and bedroom, full bath and laundry rm. 2nd fl kitchen and bath remodel, 3rd fl add bath, skylights. underground plumbing, elec upgrades, replace all windows, stucco and siding repair, minor deck repair | $180,000 |
| May 17, 2018 | Completed final sign-off Mar 2019 | 711 29th Av | add two guest rms 1 entertainment area, and 2 baths gr fl. kitchen remodel, add master beroom and bath on 2nd fl. flip interior stair direction. remove unpermitted lightwell coverDetails
add two guest rms 1 entertainment area, and 2 baths gr fl. kitchen remodel, add master beroom and bath on 2nd fl. flip interior stair direction. remove unpermitted lightwell cover | $35,000 |
| May 1, 2018 | Completed final sign-off Mar 2019 | 711 29th Av | kitchen remodel, re-wire entire house, new 200 amp panel, repipe all bathrooms/kitchen, plumbing upgradeDetails
kitchen remodel, re-wire entire house, new 200 amp panel, repipe all bathrooms/kitchen, plumbing upgrade | $28,000 |
| Jan 8, 2018 | Completed final sign-off Aug 2018 | 31 Rosewood Dr | 1st story: master suite remodel and bath remodel. new electrical & plumg. 2nd story: remove partitions between kitchen, bedrooms, & living. relocate kitchen to rear of residence, relocate guest bedroomn and bathroom.Details
1st story: master suite remodel and bath remodel. new electrical & plumg. 2nd story: remove partitions between kitchen, bedrooms, & living. relocate kitchen to rear of residence, relocate guest bedroomn and bathroom. | $150,000 |
| Nov 27, 2017 | Completed final sign-off Apr 2023 | 3817 Folsom St | grnd flr: convert (e) first floor to (n) family room. provide (n) 1/2 bath. 2nd flr: remove (e) deck. 3rd flr: provide (2) new roof decks at front & rear.Details
grnd flr: convert (e) first floor to (n) family room. provide (n) 1/2 bath. 2nd flr: remove (e) deck. 3rd flr: provide (2) new roof decks at front & rear. | $40,000 |
| Nov 10, 2017 | Completed final sign-off Mar 2019 | 2144 Hayes St | convert 1st level storage space to (n) dwelling unit - add kitchen, bath & new bedrooms @ 1st level. add (n) windows and entry door, alterations to front stairwayDetails
convert 1st level storage space to (n) dwelling unit - add kitchen, bath & new bedrooms @ 1st level. add (n) windows and entry door, alterations to front stairway | $137,000 |
| Nov 7, 2017 | Completed final sign-off Apr 2018 | 39 Faxon Av | convert (e) entainment room & closet into one bathroom, one walk-in closet & one bedroom on 1st floor. remodel (e) kitchen area & bathroom on 2nd floor. remove (e) storage are located at the kitchen on 2nd floor. replace windows in kind with better energy efficiancy u-0.32 (rear). remove rear door.Details
convert (e) entainment room & closet into one bathroom, one walk-in closet & one bedroom on 1st floor. remodel (e) kitchen area & bathroom on 2nd floor. remove (e) storage are located at the kitchen on 2nd floor. replace windows in kind with better energy efficiancy u-0.32 (rear). remove rear door. | $12,000 |
| Oct 23, 2017 | Completed final sign-off Oct 2019 | 542 Judah St | rear 3-story horizontal addition w/ 1 level wood deck. interior remodel including kitchen & bathrooms. increase garage door width to 9'-0"Details
rear 3-story horizontal addition w/ 1 level wood deck. interior remodel including kitchen & bathrooms. increase garage door width to 9'-0" | $150,000 |
| Jun 28, 2017 | Completed final sign-off Sep 2017 | 2837 Folsom St | replace kitchen cabinets & countertop, bathroom remodeling, like for like, add recess lighting in bedrooms, hallway & living room, electrical upgrade work main panel upgrade to 100 ampDetails
replace kitchen cabinets & countertop, bathroom remodeling, like for like, add recess lighting in bedrooms, hallway & living room, electrical upgrade work main panel upgrade to 100 amp | $17,500 |
| Jun 14, 2017 | Completed final sign-off Jun 2018 | 318 Ridgewood Av | garage conversion adding 2 bedrooms, family rm, 1 full bath, new elec lighting thoughout. laundry/utility in garage. 2nd fl remodel 2 bedrooms, 2 baths, kitchen, add roof deck, new hvacDetails
garage conversion adding 2 bedrooms, family rm, 1 full bath, new elec lighting thoughout. laundry/utility in garage. 2nd fl remodel 2 bedrooms, 2 baths, kitchen, add roof deck, new hvac | $150,000 |
| May 15, 2017 | Completed final sign-off Jun 2018 | 318 Ridgewood Av | plumbing and electrical upgrade for the whole house. new furnace, copper pipers, new romex wire, new 200amp panel. replace all plaster to drywall. remodel bathroom and kitchen.Details
plumbing and electrical upgrade for the whole house. new furnace, copper pipers, new romex wire, new 200amp panel. replace all plaster to drywall. remodel bathroom and kitchen. | $55,000 |
| Apr 25, 2017 | Completed final sign-off Apr 2018 | 320 18th Av | add one new master bathroom and one closet within extg sunroom on 3rd floor per plan.Details
add one new master bathroom and one closet within extg sunroom on 3rd floor per plan. | $20,000 |
| Feb 9, 2017 | Completed final sign-off Apr 2017 | 260 King St | replace kitchen cabinets and countertops. replace bathroom vanity, toilet, plumbing fixtures, and 4 sets 4" led recess lights.Details
replace kitchen cabinets and countertops. replace bathroom vanity, toilet, plumbing fixtures, and 4 sets 4" led recess lights. | $15,000 |
| Feb 3, 2017 | Completed final sign-off Oct 2017 | 27 Morningside Dr | construct two new bedrooms, one bathroom, one laundry room at ground floor. relcoate interior staircase. construct one new bathroom. remodel (e) bathroom. remodel (e) kitchen. construct four new skylights. re-wire electrical at 2nd floor.Details
construct two new bedrooms, one bathroom, one laundry room at ground floor. relcoate interior staircase. construct one new bathroom. remodel (e) bathroom. remodel (e) kitchen. construct four new skylights. re-wire electrical at 2nd floor. | $100,000 |
| Dec 23, 2016 | Completed final sign-off Sep 2017 | 1329 Revere Av | redesign of (e)1st & 2nd flr layout.all work to be done within the (e)residential envelope.new kitchen layout,new laundry,new 4 bedrooms, and 3 bathrooms. (e) front windows to remain.Details
redesign of (e)1st & 2nd flr layout.all work to be done within the (e)residential envelope.new kitchen layout,new laundry,new 4 bedrooms, and 3 bathrooms. (e) front windows to remain. | $160,000 |
| Dec 7, 2016 | Completed final sign-off Jun 2017 | 1587 28th Av | add 2 new bedrooms, 1 media room, 1 laundry room and 2 new bathroom on 1/f per plan.Details
add 2 new bedrooms, 1 media room, 1 laundry room and 2 new bathroom on 1/f per plan. | $58,000 |
| Jul 27, 2016 | Completed final sign-off Feb 2017 | 890 29th Av | 2nd floor - remodel (e) bath. relocate kitchen to dining room, convert existing kitchen to new playroom.Details
2nd floor - remodel (e) bath. relocate kitchen to dining room, convert existing kitchen to new playroom. | $31,000 |
| Jul 5, 2016 | Completed final sign-off Oct 2016 | 250 King St | unit 472: remodel kitchen & bathroom, like-for-like, replace cabinets, countertop, tiles, bathtub; must maintain all (e) adaptable features in kitchen & bathroom. unit is acovered multi-family dwelling unit per cbc chapter 11a.Details
unit 472: remodel kitchen & bathroom, like-for-like, replace cabinets, countertop, tiles, bathtub; must maintain all (e) adaptable features in kitchen & bathroom. unit is acovered multi-family dwelling unit per cbc chapter 11a. | $18,000 |
| Jun 20, 2016 | Completed final sign-off Jun 2017 | 250 King St | #1116 - kitchen & bathroom remodel; like to like.Details
#1116 - kitchen & bathroom remodel; like to like. | $18,000 |
| Jun 3, 2016 | Completed final sign-off Jun 2017 | 256 Juanita Wy | repair termite, wood beetle and dryrot structural damage, repair foundation, reinforce (e) structure, replace/upgrade electrical wiring, improve 2 (e) bathrooms, install new egress windows in 4 (e) bedrooms, new windows throughout, permimeter installation, improve drainage.Details
repair termite, wood beetle and dryrot structural damage, repair foundation, reinforce (e) structure, replace/upgrade electrical wiring, improve 2 (e) bathrooms, install new egress windows in 4 (e) bedrooms, new windows throughout, permimeter installation, improve drainage. | $130,000 |
| Apr 20, 2016 | Expired or cancelled cancelled Feb 2020 | 1655 48th Av | vertical & horizontal addition. 3-story residential addition at the rear of (e) building. bedroom, family room & bathroom.Details
vertical & horizontal addition. 3-story residential addition at the rear of (e) building. bedroom, family room & bathroom. | $150,000 |
| Jan 20, 2016 | Completed final sign-off May 2016 | 1945 Washington St | kitchen & bathroom remodel. like for like. replace cabinets, countertops, sink, faucet, bathtub, toilet, tiles. n/a for maher.Details
kitchen & bathroom remodel. like for like. replace cabinets, countertops, sink, faucet, bathtub, toilet, tiles. n/a for maher. | $25,000 |
| Nov 17, 2015 | Completed final sign-off Jun 2016 | 715 Anderson St | remodel kitchen and bath. change/add window in backDetails
remodel kitchen and bath. change/add window in back | $100,000 |
| Jul 25, 2014 | Completed final sign-off Dec 2014 | 1614 46th Av | add a family room, a storage room and a full bathroom. install new water heater and furnance.Details
add a family room, a storage room and a full bathroom. install new water heater and furnance. | $18,000 |
| Jul 23, 2014 | Expired or cancelled cancelled Jan 2026 | 1614 46th Av | in lower level, add one full bathroom, add 1 bedroom, 1 family room, replace 2 real windows install new water heater and furnaceDetails
in lower level, add one full bathroom, add 1 bedroom, 1 family room, replace 2 real windows install new water heater and furnace | $18,000 |
| Feb 20, 2014 | Completed final sign-off Jul 2014 | 132 Broad St | to add one bedroom, one family room, two full bathrooms & laundry on existing ground floor per plan.Details
to add one bedroom, one family room, two full bathrooms & laundry on existing ground floor per plan. | $80,000 |
| Nov 4, 2013 | Never finaled issued Nov 2013, no final | 619 Visitacion Av | patch holes on drywlal, replace bathroom faucet, replace (2) damaged breakers of main panel/service panel, replace with main panel.Details
patch holes on drywlal, replace bathroom faucet, replace (2) damaged breakers of main panel/service panel, replace with main panel. | $800 |
| Jun 15, 2012 | Completed final sign-off Sep 2012 | 1395 Thomas Av | construct two (n) bedrooms, one (n) bath, one (n) family room and one (n) storage on ground floor.Details
construct two (n) bedrooms, one (n) bath, one (n) family room and one (n) storage on ground floor. | $38,000 |