O Donoghue Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2010 to Jun 2026
- Last 24 months
- 14 permits filed
113 permits since 2000: 95 completed, 4 in progress, 13 never finaled, 1 expired or cancelled.
Of the 13 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
28 bathroom remodel permits: 25 completed, 3 never finaled. Typically 18 days from filing to permit and 167 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 2, 2024 | Completed final sign-off Feb 2025 | 4050 Ulloa St | install new cabinets in kitchen, new countertop and appliances, sink, stove, ref in same place. remodel existing bath and replace fixtures and tile. new electrical throughout. no wall demolition or construction.Details
install new cabinets in kitchen, new countertop and appliances, sink, stove, ref in same place. remodel existing bath and replace fixtures and tile. new electrical throughout. no wall demolition or construction. | $25,000 |
| Jul 17, 2024 | Completed final sign-off Dec 2025 | 20 San Pablo Av | proposed conversion of crawl space to accomdate (2) bedrooms, new offices (2) new bathrooms, all work to be performed within the (e) boundary of the buildingDetails
proposed conversion of crawl space to accomdate (2) bedrooms, new offices (2) new bathrooms, all work to be performed within the (e) boundary of the building | $185,000 |
| Jun 14, 2024 | Completed final sign-off Jun 2024 | 4234 24th St | as built changes to pa 201909262861 eliminate off-set walls @ below grade patio; reduce size unit 1/bed 2; alocohol fuel fire place unit 1; new bathroom unit 2Details
as built changes to pa 201909262861 eliminate off-set walls @ below grade patio; reduce size unit 1/bed 2; alocohol fuel fire place unit 1; new bathroom unit 2 | $20,000 |
| May 1, 2024 | Completed final sign-off Jun 2025 | 822 Union St | relocate kitchen & laundry. add one new bathroom & remodel (e) bathroom. replace (e) sheetrock with new. all work at 2nd flDetails
relocate kitchen & laundry. add one new bathroom & remodel (e) bathroom. replace (e) sheetrock with new. all work at 2nd fl | $120,000 |
| Apr 18, 2024 | Completed final sign-off Jun 2025 | 824 Union St | relocate kitchen, laundry, add 1 new bathroom. remodel (e) bathroom & replace (e) sheet rock w/ new. all work on 3/f.Details
relocate kitchen, laundry, add 1 new bathroom. remodel (e) bathroom & replace (e) sheet rock w/ new. all work on 3/f. | $140,000 |
| Aug 15, 2023 | Completed final sign-off Nov 2025 | 563 44th Av | relocate 2 (e) bathroom, convert (e) media room to bedroom & install kitchenette at g/f. remodel (e) kitchen, bathroom. construct 1 bathroom & replace sheetrock w/ new at 2/f.Details
relocate 2 (e) bathroom, convert (e) media room to bedroom & install kitchenette at g/f. remodel (e) kitchen, bathroom. construct 1 bathroom & replace sheetrock w/ new at 2/f. | $362,000 |
| May 16, 2023 | Completed final sign-off Nov 2025 | 79 Melrose Av | new 2-story addition at rear of existing single family dwelling; interior alteration at 1st floor adding 1/2 bath & kitchenette at 1st floor -no new dwelling unitDetails
new 2-story addition at rear of existing single family dwelling; interior alteration at 1st floor adding 1/2 bath & kitchenette at 1st floor -no new dwelling unit | $117,100 |
| Mar 6, 2023 | Completed final sign-off Oct 2023 | 600 Vermont St | ada access barrier removal, new ada bathroom, new ada counterDetails
ada access barrier removal, new ada bathroom, new ada counter | $50,000 |
| Jan 9, 2023 | Completed final sign-off Nov 2023 | 733 Castro St | inteiror remodel. 2/f: remodeling the (e) kitchen and half bath. 3/f: remodeling of the (e) common bath, relocation of washer and dryer to 3/f. remodeling of (e) master bath. window replacement throughout.Details
inteiror remodel. 2/f: remodeling the (e) kitchen and half bath. 3/f: remodeling of the (e) common bath, relocation of washer and dryer to 3/f. remodeling of (e) master bath. window replacement throughout. | $90,000 |
| Jul 15, 2019 | Completed final sign-off Nov 2019 | 355 Lansdale Av | interior remodel at 355 lansdale dwelling units, addition of a bath, bath #3 at the (e) 2nd fl. bath #1, (e) bath #1 window to be relaced in new configurationDetails
interior remodel at 355 lansdale dwelling units, addition of a bath, bath #3 at the (e) 2nd fl. bath #1, (e) bath #1 window to be relaced in new configuration | $19,000 |
| May 30, 2019 | Completed final sign-off Dec 2019 | 55 Terrace Dr | interior remodel of (e) 1st fl. to include a new half bath and a new exterior door on the west elevattion.Details
interior remodel of (e) 1st fl. to include a new half bath and a new exterior door on the west elevattion. | $5,000 |
| Apr 4, 2019 | Completed final sign-off Sep 2022 | 609 San Bruno Av | vertical addition. 3/fl addition with deck, convert some existing garage space to living area. replace front window with custom to match, widen garage door,seismic upgrade, sprinklers. remodeling of existing 2/fl home including kitchen and new bathroom.Details
vertical addition. 3/fl addition with deck, convert some existing garage space to living area. replace front window with custom to match, widen garage door,seismic upgrade, sprinklers. remodeling of existing 2/fl home including kitchen and new bathroom. | $800,000 |
| Feb 25, 2019 | Completed final sign-off Jul 2019 | 2 Nahua Av | repair dryrot at front stairway walls, remove some stucco, repair and patch. remove kitchen cabinets and replace. remove tile and fixtures in bathroom. replace with new. no electrical and plumbing and structural work. approximately 10 sqaure feet of stucco to be removed.Details
repair dryrot at front stairway walls, remove some stucco, repair and patch. remove kitchen cabinets and replace. remove tile and fixtures in bathroom. replace with new. no electrical and plumbing and structural work. approximately 10 sqaure feet of stucco to be removed. | $12,000 |
| Oct 6, 2017 | Completed final sign-off Jun 2018 | 50 San Rafael Wy | interior renovations to kitchen, 4 bathrooms & bedrooms. in kind replacement (e) windows & entry stair. new study, family room bath & storage at garage level.Details
interior renovations to kitchen, 4 bathrooms & bedrooms. in kind replacement (e) windows & entry stair. new study, family room bath & storage at garage level. | $150,000 |
| Oct 4, 2017 | Completed final sign-off Sep 2022 | 2121 Mason St | renovate (e)(2) bed (2) bath single family home. proposed project to add (1) story & create 2nd unit. comprising of: 1st unit (1)bed/(1.5) bath. 2nd unit (3)bed/(2.5)bath & (1)car parking. increase (e) by (2) bed/(2)bath.Details
renovate (e)(2) bed (2) bath single family home. proposed project to add (1) story & create 2nd unit. comprising of: 1st unit (1)bed/(1.5) bath. 2nd unit (3)bed/(2.5)bath & (1)car parking. increase (e) by (2) bed/(2)bath. | $507,450 |
| Oct 4, 2017 | Completed final sign-off Sep 2022 | 4 Newell St | renovate (e) single family home (2bed/2bath). proposed project is to add (1)story & create 2nd unit. comprising of: unit 1: (1)bed/(1.5)bath, unit 2: (3)bed/(2.5)bath & one car parking.Details
renovate (e) single family home (2bed/2bath). proposed project is to add (1)story & create 2nd unit. comprising of: unit 1: (1)bed/(1.5)bath, unit 2: (3)bed/(2.5)bath & one car parking. | $507,450 |
| Jun 28, 2016 | Never finaled issued Jan 2017, no final | 4287 23rd St | proposed interior remodel to 1st flr: (n) wet bar & expanding master bedroom & 2 bathrooms; 2nd floor converting 1 half bath to full bath. all work to be performed within (e) boundary of the building.Details
proposed interior remodel to 1st flr: (n) wet bar & expanding master bedroom & 2 bathrooms; 2nd floor converting 1 half bath to full bath. all work to be performed within (e) boundary of the building. | $90,000 |
| Apr 7, 2016 | Completed final sign-off Sep 2017 | 2845 Noriega St | interior remodel to 1st floor removing all extg posts; 2nd floor expanding 2 bathrooms and convert 1 half bath to full bath; add new roof deck. all work to be performed within boundary of the bldg.Details
interior remodel to 1st floor removing all extg posts; 2nd floor expanding 2 bathrooms and convert 1 half bath to full bath; add new roof deck. all work to be performed within boundary of the bldg. | $180,000 |
| Nov 13, 2014 | Completed final sign-off Apr 2015 | 3775 16th St | remodel kitchen and bathroom- new insulation, drywall; - all fixtures, tub & sink in same location. to comply with cec150.0(k)3 & 5. repair of deck less than 50%Details
remodel kitchen and bathroom- new insulation, drywall; - all fixtures, tub & sink in same location. to comply with cec150.0(k)3 & 5. repair of deck less than 50% | $100,000 |
| Feb 10, 2014 | Completed final sign-off Apr 2014 | 233 Dellbrook Av | remodel existing 1st flr bathroom, repl fixtures, ie., new toilet, vanity, shower pan and faucets, install new tile on floor and shower wallsDetails
remodel existing 1st flr bathroom, repl fixtures, ie., new toilet, vanity, shower pan and faucets, install new tile on floor and shower walls | $3,000 |
| May 15, 2013 | Completed final sign-off Oct 2013 | 300 03rd St | apt. 311:remodel bathroom. replacing 1 door. adding 2 doors. replacing 2 lights, adding 6 lights. apply decorative wood slat finish to entry and 1 wall of bedroom. add new wood flooring.Details
apt. 311:remodel bathroom. replacing 1 door. adding 2 doors. replacing 2 lights, adding 6 lights. apply decorative wood slat finish to entry and 1 wall of bedroom. add new wood flooring. | $30,000 |
| Jan 29, 2013 | Completed final sign-off Apr 2013 | 2680 Great Hy | proposed interior remodel for 2 bedrooms, 1 full bath at rear of 1st floor with kitchen and bath remodel at 2nd flr and add 1 bath. structural upgrades to accomodate interior modifications per plan. all work performed within e boundry of buildingDetails
proposed interior remodel for 2 bedrooms, 1 full bath at rear of 1st floor with kitchen and bath remodel at 2nd flr and add 1 bath. structural upgrades to accomodate interior modifications per plan. all work performed within e boundry of building | $75,000 |
| Jun 22, 2012 | Never finaled issued Jun 2012, no final | 2630 46th Av | repair dry rot under front stairs in kind approx. 50%, install new cabinets, countertops in kitchen, install new tiel, fixtures in upper bathroom.Details
repair dry rot under front stairs in kind approx. 50%, install new cabinets, countertops in kitchen, install new tiel, fixtures in upper bathroom. | $5,000 |
| Apr 11, 2012 | Never finaled issued Apr 2012, no final | 26 Ocean Av | upgrade (e) bathroom to ada compliant bathroom.Details
upgrade (e) bathroom to ada compliant bathroom. | $20,000 |
| Apr 2, 2012 | Completed final sign-off May 2012 | 2630 46th Av | room addition at back of garage with 1 new family room, 1 new bedroom, 1 new bathroom & 1 half bathroom to the 1st floorDetails
room addition at back of garage with 1 new family room, 1 new bedroom, 1 new bathroom & 1 half bathroom to the 1st floor | $64,000 |
| Dec 8, 2011 | Completed final sign-off Feb 2012 | 2230 42nd Av | room addition at back of garage with 1 new family room, 1 new bedroom, 1 new bathroom. all wortk within (e) boundaryDetails
room addition at back of garage with 1 new family room, 1 new bedroom, 1 new bathroom. all wortk within (e) boundary | $30,000 |
| Sep 1, 2011 | Completed final sign-off Jan 2012 | 674 Sanchez St | renovate and expand exisiting master bath. enovate master bedroom closet. all work at 1st floorDetails
renovate and expand exisiting master bath. enovate master bedroom closet. all work at 1st floor | $12,000 |
| Jun 16, 2010 | Completed final sign-off Oct 2010 | 811 Crescent Av | add new full bathroom at ground floor. change furnace unit. replace beam. comply with notice of violation #201050048 per plan.Details
add new full bathroom at ground floor. change furnace unit. replace beam. comply with notice of violation #201050048 per plan. | $6,000 |