Jean Orino
- Listed as
- architect, designer
- Firm
- Mark & Clark Design
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Aug 2026
14 permits since 2000 (architect on 13 permits, designer on 1 permit): 9 completed, 4 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 13, 2026 | In progress issued Aug 2026 | 3777 22nd St | Cook Construction | revision to pa# 202507301925, reference permit 202105070016 (r4) demo & replace front entry stairs in kind, add new foundation & new tread & riser finish. existing stair handrail & guardrail to be reinstalled, typical. new front entry door, new garage door in existing opening,new paintDetails
revision to pa# 202507301925, reference permit 202105070016 (r4) demo & replace front entry stairs in kind, add new foundation & new tread & riser finish. existing stair handrail & guardrail to be reinstalled, typical. new front entry door, new garage door in existing opening,new paint | $50,000 |
| Jul 30, 2025 | In progress issued Aug 2025 | 3777 22nd St | Cook Construction | rev to 202105070016: add direct vent gas fireplace in living rm. move previously approbed kitchen window to offic @ west elevation, adjust locations of skylights & attic access ladder, adjust office 312 & closet 319 ceiling to be flat w/ 4:12 sloped roof above. clarify rear deck stair run withDetails
rev to 202105070016: add direct vent gas fireplace in living rm. move previously approbed kitchen window to offic @ west elevation, adjust locations of skylights & attic access ladder, adjust office 312 & closet 319 ceiling to be flat w/ 4:12 sloped roof above. clarify rear deck stair run with | $25,000 |
| Apr 4, 2025 | In progress issued May 2025 | 3777 22nd St | Cook Construction | revision to pa #202105070016 change spiral to conventional stair. adjust 2nd fl deck extents & corresponding fire walls. adjust ext windows & doors. 1st fl: adjust fl height, rearrange interior rooms. 2nd fl: adjust kitchen layout. 3rd fl: revise layout of bathrooms,closet, add laundry & 3 sinks.Details
revision to pa #202105070016 change spiral to conventional stair. adjust 2nd fl deck extents & corresponding fire walls. adjust ext windows & doors. 1st fl: adjust fl height, rearrange interior rooms. 2nd fl: adjust kitchen layout. 3rd fl: revise layout of bathrooms,closet, add laundry & 3 sinks. | $10,000 |
| Sep 13, 2024 | Completed final sign-off Oct 2024 | 4363 24th St | to obtain final inspecton for work under 201601227773 and 201811297052. all work is complete.Details
to obtain final inspecton for work under 201601227773 and 201811297052. all work is complete. | ||
| May 29, 2024 | Completed final sign-off Aug 2024 | 2453 Filbert St | revision to pa #202207219054, change doors facing rear yard. new header and no changes to (e) shear wallDetails
revision to pa #202207219054, change doors facing rear yard. new header and no changes to (e) shear wall | ||
| Jul 21, 2022 | Completed final sign-off Aug 2024 | 2453 Filbert St | Dromhus Inc. | demo (e) rear yard doors to be replaced w/ taller and winder doors. demo (e) side yard inoperable windows & replaced w/ (n) push out casement windows. minor inteiror remodel - walls.kitchen & bathrooms remodel under 202205114025.Details
demo (e) rear yard doors to be replaced w/ taller and winder doors. demo (e) side yard inoperable windows & replaced w/ (n) push out casement windows. minor inteiror remodel - walls.kitchen & bathrooms remodel under 202205114025. | $25,000 |
| Nov 9, 2021 | Completed final sign-off Dec 2022 | 79 Collins St | Dromhus Inc. | remodel of (e) sfd; no change to height or footprint. lower level: convert (e) bedroom & bath to 2br & bath & kitchenette. upper lee: rearrange 3 bedrooms & 2 baths. e.o plannning asked applicant to remove balcony for this review on 11/9/2021Details
remodel of (e) sfd; no change to height or footprint. lower level: convert (e) bedroom & bath to 2br & bath & kitchenette. upper lee: rearrange 3 bedrooms & 2 baths. e.o plannning asked applicant to remove balcony for this review on 11/9/2021 | $150,000 |
| May 7, 2021 | In progress issued Jul 2024 | 3777 22nd St | Perez Construction Llc., Cook Construction | partial demo (e) rear kitchen extension & deck & (e) interior walls, stairs. excavate portion of (e) storage to allow occupiable headroom @ lower level. addition @ rear yard include extending (e) roof heigh, new windows & new skylights. new walls for interior remodel. 4 bedrooms, 3.5 baths, kitchen,Details
partial demo (e) rear kitchen extension & deck & (e) interior walls, stairs. excavate portion of (e) storage to allow occupiable headroom @ lower level. addition @ rear yard include extending (e) roof heigh, new windows & new skylights. new walls for interior remodel. 4 bedrooms, 3.5 baths, kitchen, | $1,250,000 |
| Mar 6, 2020 | Completed final sign-off Dec 2020 | 2090 Vallejo St | Terence Mcmahon Construction | roof replacement, replace(e) natural slate with (n) manufacture slate,(n)roof underlayment, all(n) copper flashing. dormer roofs: replace (e)faux copper painted galvinized standing seam with (n)copper standing seam over new under layment.repair (e) wood trim as required, match (e) typical.Details
roof replacement, replace(e) natural slate with (n) manufacture slate,(n)roof underlayment, all(n) copper flashing. dormer roofs: replace (e)faux copper painted galvinized standing seam with (n)copper standing seam over new under layment.repair (e) wood trim as required, match (e) typical. | $125,000 |
| Aug 29, 2019 | Completed final sign-off Jul 2021 | 2721 Bush St | Terence Mcmahon Construction | relocate & demo walls, new bedroom, add header and post, relocate bathroom fixtures, new shower.Details
relocate & demo walls, new bedroom, add header and post, relocate bathroom fixtures, new shower. | $30,000 |
| Jan 9, 2009 | Never finaled filed Jan 2009, never issued | 435 Burnett Av | garage renovation, convert existing 2 car garage to 3 car garage, no new area proposed; demo interior walls, cap existing plumbing, relocate elec panel, new garage doors, adjust sidewalk curb.Details
garage renovation, convert existing 2 car garage to 3 car garage, no new area proposed; demo interior walls, cap existing plumbing, relocate elec panel, new garage doors, adjust sidewalk curb. | $12,000 | |
| Feb 14, 2008 | Completed final sign-off Aug 2008 | 628 Steiner St | remove illegal unit on basement floor including walls, plumbing fixtures at bathroom & kitchen sink to revert space back to storage use to comply with complaint# 200795101. add gyp. bd, to comply with 1 hr rated wall requirements at exit path.Details
remove illegal unit on basement floor including walls, plumbing fixtures at bathroom & kitchen sink to revert space back to storage use to comply with complaint# 200795101. add gyp. bd, to comply with 1 hr rated wall requirements at exit path. | $4,000 | |
| Oct 4, 2007 | Completed final sign-off Apr 2008 | 439 Burnett Av | revision to p.a. 200705090783. move exterior landscape exit stair from approved location to new location.Details
revision to p.a. 200705090783. move exterior landscape exit stair from approved location to new location. | $1,500 | |
| May 9, 2007 | Completed final sign-off Apr 2008 | 439 Burnett Av | no change to (e) buildings: proposed changes to (e) landscape structure to facilitate property lot split. see detailed cover letter explaining history and pre application meeting process & three separate local code equivalency applications.Details
no change to (e) buildings: proposed changes to (e) landscape structure to facilitate property lot split. see detailed cover letter explaining history and pre application meeting process & three separate local code equivalency applications. | $30,000 |