Block 0841, lot 003
415 Buchanan St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 4
- Units
- 27
- Rooms
- 27 bedrooms, 27 bathrooms
- Building
- 20,580 sq ft
- Lot
- 6,840 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
33 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 15, 2026 | Completed final sign-off Mar 2026 | 415 Buchanan St | Redlog Flooring Services Corp | scraping and painting emergency fire escape. no structural alteration.Details
scraping and painting emergency fire escape. no structural alteration. | $15,000 |
| Jun 27, 2025 | Completed final sign-off Dec 2025 | 415 Buchanan St | Axel8 Construction | unit #u. 1. rehab existing kitchen. 2. rehab existing bathroom. 3. install washer and dryer. new vents not to exceed height of existing roof parapets.Details
unit #u. 1. rehab existing kitchen. 2. rehab existing bathroom. 3. install washer and dryer. new vents not to exceed height of existing roof parapets. | $75,000 |
| Jun 18, 2025 | Completed final sign-off Dec 2025 | 415 Buchanan St | Axel8 Construction | unit #t: rehab existing kitchen, rehab existing bathroom, install washer and dryer.Details
unit #t: rehab existing kitchen, rehab existing bathroom, install washer and dryer. | $75,000 |
| Nov 5, 2024 | Completed final sign-off Aug 2025 | 415 Buchanan St | Markoff Structural Pest Control | markoff spc limited report #24754 item #1 - #6Details
markoff spc limited report #24754 item #1 - #6 | $49,000 |
| Oct 8, 2024 | Completed final sign-off Dec 2024 | 415 Buchanan St | Quintanilla Builders Inc | unit #o install (n) washer & dryer no wall demoDetails
unit #o install (n) washer & dryer no wall demo | $5,000 |
| May 9, 2023 | Completed final sign-off Jul 2023 | 415 Buchanan St | Bay Area Activo Inc. | revision to permit no-plan 202210063885. adding scope for structural work. repair dryrot within the floors of units c,d,i,j on 2/f. provide vents in crawl space below and replace 7 non-street facing windows in kind at unit i. windows being replaced are eero, verify in fieldDetails
revision to permit no-plan 202210063885. adding scope for structural work. repair dryrot within the floors of units c,d,i,j on 2/f. provide vents in crawl space below and replace 7 non-street facing windows in kind at unit i. windows being replaced are eero, verify in field | $32,000 |
| Oct 6, 2022 | Never finaled issued Oct 2022, no final | 415 Buchanan St | Bay Area Activo Inc. | dry rot repairs in bathroom and kitchen in units c,d,i and j. removal and re-installation of bathtubs, sinks and possibly kitchen cabinets.Details
dry rot repairs in bathroom and kitchen in units c,d,i and j. removal and re-installation of bathtubs, sinks and possibly kitchen cabinets. | $80,000 |
| Nov 3, 2021 | Completed final sign-off Jan 2023 | 415 Buchanan St | Au Electric Corporation/Aec Alarms | upgrade the existing fire alarm system to meet current codes 2019 cbc/cfc and nfpa72-2016 by installing new low frequency sounders in all sleeping areas.Details
upgrade the existing fire alarm system to meet current codes 2019 cbc/cfc and nfpa72-2016 by installing new low frequency sounders in all sleeping areas. | $40,000 |
| Apr 20, 2021 | Completed final sign-off Dec 2021 | 415 Buchanan St | Aguilera Construction Company | #g: 1)convert existing kitchen to study. 2)relocate kitchen. 3)rehabilitate extisting bathroom. 4)install washer and dryer.Details
#g: 1)convert existing kitchen to study. 2)relocate kitchen. 3)rehabilitate extisting bathroom. 4)install washer and dryer. | $40,000 |
| Apr 19, 2021 | Never finaled issued Aug 2021, no final | 415 Buchanan St | Aguilera Construction Company | unit s 1)revision to app#202009224679. 2)rehabilitate existing kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryerDetails
unit s 1)revision to app#202009224679. 2)rehabilitate existing kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer | $32,000 |
| Apr 19, 2021 | Never finaled issued Jun 2021, no final | 415 Buchanan St | Aguilera Construction Company | unit z 1)revision to app#202009224680. 2)rehabilitate existing kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryerDetails
unit z 1)revision to app#202009224680. 2)rehabilitate existing kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer | $32,000 |
| Nov 19, 2020 | Never finaled issued Apr 2021, no final | 415 Buchanan St | Aguilera Construction Company | unit# n: revision to no plan pa#202008272736: convert existing kitchen to study room. relocate kitchen. rehabilitate (e) bathroom. install washer/dryer.Details
unit# n: revision to no plan pa#202008272736: convert existing kitchen to study room. relocate kitchen. rehabilitate (e) bathroom. install washer/dryer. | $38,000 |
| Sep 22, 2020 | Completed final sign-off Oct 2020 | 415 Buchanan St | termite report 3 19464 repair fungusDetails
termite report 3 19464 repair fungus | $40,000 | |
| Sep 22, 2020 | Completed final sign-off Dec 2020 | 415 Buchanan St | Aguilera Construction Company | apt b1: repair floor: remove and replce in-kind. approx 800sf.Details
apt b1: repair floor: remove and replce in-kind. approx 800sf. | $12,000 |
| Sep 22, 2020 | Never finaled issued Sep 2020, no final | 415 Buchanan St | Aguilera Construction Company | apt z: r/r bathroom & kitchen remodel, new fixtures in same location.Details
apt z: r/r bathroom & kitchen remodel, new fixtures in same location. | $30,000 |
| Sep 22, 2020 | Never finaled issued Sep 2020, no final | 415 Buchanan St | Aguilera Construction Company | apt s: r/r bathroom & kitchen remodel, new fixtures in same location.Details
apt s: r/r bathroom & kitchen remodel, new fixtures in same location. | $30,000 |
| Aug 27, 2020 | Never finaled issued Aug 2020, no final | 415 Buchanan St | Aguilera Construction Company | unit n. kitchen and bathroom remodel, in-kind, approx 500 sq ft. remove and replace kitchen and bath fixtures in at same locations.Details
unit n. kitchen and bathroom remodel, in-kind, approx 500 sq ft. remove and replace kitchen and bath fixtures in at same locations. | $30,000 |
| Jul 7, 2020 | Completed final sign-off Jul 2020 | 415 Buchanan St | Markoff Structural Pest Control | markoff structural pest control supplement rep #19464, item. repair dryrot at unit #a. framing base and framing at bathroom.Details
markoff structural pest control supplement rep #19464, item. repair dryrot at unit #a. framing base and framing at bathroom. | $16,000 |
| Sep 23, 2019 | Completed final sign-off Oct 2019 | 415 Buchanan St | administrative permit to correct building as a 27 unit residential building based on a site visit and city records ( dbi, water dpt and assesser) no work on this permitDetails
administrative permit to correct building as a 27 unit residential building based on a site visit and city records ( dbi, water dpt and assesser) no work on this permit | ||
| Mar 29, 2019 | Completed final sign-off Jul 2019 | 415 Buchanan St | renovate kitchne & bathroom electrical & plumbing electrician & plumber will obtain permits lightin high efficiancy kitchen sq 56 bath sq ft 38Details
renovate kitchne & bathroom electrical & plumbing electrician & plumber will obtain permits lightin high efficiancy kitchen sq 56 bath sq ft 38 | $39,000 | |
| May 7, 2018 | Never finaled issued May 2018, no final | 415 Buchanan St | street space | ||
| Apr 4, 2018 | Never finaled issued Apr 2018, no final | 415 Buchanan St | street space | ||
| Mar 16, 2018 | Completed final sign-off Jul 2018 | 415 Buchanan St | Ferris Enterprises Inc. | structural revision to pa 2016-1020-0845 (soft story). memorialize structural modifications to approved plans based on (e) site conditionsDetails
structural revision to pa 2016-1020-0845 (soft story). memorialize structural modifications to approved plans based on (e) site conditions | |
| Jan 30, 2018 | Never finaled issued Jan 2018, no final | 415 Buchanan St | street space | ||
| Apr 5, 2017 | Never finaled issued Apr 2017, no final | 415 Buchanan St | streetspace | ||
| Apr 5, 2017 | Never finaled issued Apr 2017, no final | 415 Buchanan St | streetspace | ||
| Dec 28, 2016 | Never finaled issued Dec 2016, no final | 415 Buchanan St | remodel kitchen and bath - apartment new electric with electrician to obtain permit. upgrade plumbing with plumber to obtain permit. kitchen new cabinets. kitchen - range hood, kitchen lights 50% efficacy - bath lights high efficiency; n/a maherDetails
remodel kitchen and bath - apartment new electric with electrician to obtain permit. upgrade plumbing with plumber to obtain permit. kitchen new cabinets. kitchen - range hood, kitchen lights 50% efficacy - bath lights high efficiency; n/a maher | $18,000 | |
| Oct 20, 2016 | Completed final sign-off Jul 2018 | 415 Buchanan St | Ferris Enterprises Inc. | abatement of nov 201642391; soft story retrofit to comply with sfbc ch 34b based on iebc appendix a-4 & calculations; maher n/aDetails
abatement of nov 201642391; soft story retrofit to comply with sfbc ch 34b based on iebc appendix a-4 & calculations; maher n/a | $60,000 |
| Sep 5, 2013 | Completed final sign-off Dec 2013 | 415 Buchanan St | unit a remodel kitchen and bath. new elec,plumbing, move gas line. new cabinets, range hood, lighting, 50% high eff.Details
unit a remodel kitchen and bath. new elec,plumbing, move gas line. new cabinets, range hood, lighting, 50% high eff. | $8,000 | |
| Jun 7, 2013 | Completed final sign-off Sep 2013 | 415 Buchanan St | unit n - remodel kitch and bathroom, new cabinets& new canity in bathroom, new electricla w/electrician to obtain permit, upgrade plumbing in kitchen & move gas line ,recurculating kitchen hood, 50% kitchen lights high effeciency,bath lighting high effeciencyDetails
unit n - remodel kitch and bathroom, new cabinets& new canity in bathroom, new electricla w/electrician to obtain permit, upgrade plumbing in kitchen & move gas line ,recurculating kitchen hood, 50% kitchen lights high effeciency,bath lighting high effeciency | $8,000 | |
| Apr 16, 2013 | Completed final sign-off Jun 2013 | 415 Buchanan St | unit q. remodel kitchen & bathroom - new cabinets & vanity. new electrical w/electrian to obtain permit. upgrade plumbing and gas line plumber to obtain permit.Details
unit q. remodel kitchen & bathroom - new cabinets & vanity. new electrical w/electrian to obtain permit. upgrade plumbing and gas line plumber to obtain permit. | $8,000 | |
| Feb 6, 2013 | Completed final sign-off Apr 2013 | 415 Buchanan St | Sean M O'reilly | #b-1 -remodel one kitchen,one bathroom, new elect,plbg, demo lathe & plaster in kitchen, bath, hallway, new drywall shall be 5/8" type x gypsum board,new gas valve kitchen & bathroom cabinets, sinks, countertops (no dish washer or disposer) no structural changes, separate plbg,elec permit.Details
#b-1 -remodel one kitchen,one bathroom, new elect,plbg, demo lathe & plaster in kitchen, bath, hallway, new drywall shall be 5/8" type x gypsum board,new gas valve kitchen & bathroom cabinets, sinks, countertops (no dish washer or disposer) no structural changes, separate plbg,elec permit. | $20,000 |
| Jan 31, 2006 | Never finaled issued Jan 2006, no final | 415 Buchanan St | street space & sidewalk permit only.Details
street space & sidewalk permit only. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Aguilera Construction Company (8), Axel8 Construction (2), Bay Area Activo Inc. (2), Ferris Enterprises Inc. (2), Markoff Structural Pest Control (2), Au Electric Corporation/Aec Alarms, Quintanilla Builders Inc, Redlog Flooring Services Corp, Sean M O'reilly
- Engineers
- Joe Win Kon (3), Rodrigo Santos (2)