Block 1355, lot 012
100 Lake St
- City’s use
- Multi-Family Residential
- Built
- 1924
- Stories
- 3
- Units
- 16
- Rooms
- 17 bathrooms
- Building
- 14,900 sq ft
- Lot
- 5,750 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 12, 2025 | Completed final sign-off Aug 2025 | 100 Lake St | G T M Works Llc Dba Greentree Maint | unit 31- ref 202506037806- replace countertops in kind. kitchen remodel no wall demo. keep (e) cabinetsDetails
unit 31- ref 202506037806- replace countertops in kind. kitchen remodel no wall demo. keep (e) cabinets | $1,500 |
| Jun 3, 2025 | Completed final sign-off Aug 2025 | 100 Lake St | G T M Works Llc Dba Greentree Maint | 4th floor unit#: 31. install one new clothes washer and dryer, and one new closet, no wall demo. work is inside unit at 4th floor only. no exterior work.Details
4th floor unit#: 31. install one new clothes washer and dryer, and one new closet, no wall demo. work is inside unit at 4th floor only. no exterior work. | $6,000 |
| Oct 8, 2024 | Completed final sign-off Oct 2024 | 100 Lake St | Redlog Flooring Services Corp | wood siding repairs on 2 small walls by the tradesman's alley. primer and exterior painting lke for like. not visible from street. repair in kind.Details
wood siding repairs on 2 small walls by the tradesman's alley. primer and exterior painting lke for like. not visible from street. repair in kind. | $9,500 |
| Apr 28, 2022 | Completed final sign-off Oct 2022 | 100 Lake St | Brighter Bay Builders Inc | unit 2: convert (e) dining to den, rehab kitchen & bathroom. install washer/ dryer.Details
unit 2: convert (e) dining to den, rehab kitchen & bathroom. install washer/ dryer. | $21,000 |
| Nov 25, 2020 | Never finaled issued Jun 2021, no final | 100 Lake St | Aguilera Construction Company | unit # 1a: 1. convert existing kitchen to bedroom 2. relocate kitchen 3. rehabilitate existing bathroom 4. install washer and dryerDetails
unit # 1a: 1. convert existing kitchen to bedroom 2. relocate kitchen 3. rehabilitate existing bathroom 4. install washer and dryer | $40,000 |
| Aug 20, 2020 | Completed final sign-off Mar 2025 | 100 Lake St | Hue & Cry Security System | voluntary upgrade of extg fire alarm system with additions of low frequency sounders with all sleeping areas to meet code 1103.7.6.1Details
voluntary upgrade of extg fire alarm system with additions of low frequency sounders with all sleeping areas to meet code 1103.7.6.1 | $52,077 |
| Aug 16, 2019 | Completed final sign-off May 2021 | 100 Lake St | Caslez Construction Inc | convert (e) kitchen to bedroom. relocate kitchen rehabilitate (e) bathroom install w/d unit #1Details
convert (e) kitchen to bedroom. relocate kitchen rehabilitate (e) bathroom install w/d unit #1 | $46,000 |
| Jul 29, 2016 | Completed final sign-off Dec 2017 | 100 Lake St | Bai Construction | soft story retrofit per sfbc chapter 34b engineering criteria fema p-807Details
soft story retrofit per sfbc chapter 34b engineering criteria fema p-807 | $100,000 |
| Mar 10, 2010 | Never finaled issued Mar 2010, no final | 100 Lake St | street space and sidewalkDetails
street space and sidewalk | ||
| Oct 15, 2009 | Completed final sign-off Jan 2010 | 100 Lake St | patch & repair existing stucco apron on bay window which has failed , visable from street @ 3rd level. repair in kind, all work same as existing, no structural work.Details
patch & repair existing stucco apron on bay window which has failed , visable from street @ 3rd level. repair in kind, all work same as existing, no structural work. | $1,500 |