Block 3707, lot 063
680 Mission St
- City’s use
- Multi-Family Residential
- Built
- 2002
- Stories
- 41
- Units
- 486
- Building
- 482,781 sq ft
- Lot
- 32,929 sq ft
- Zoning
- NA
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
159 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 18, 2026 | In progress issued Jun 2026 | 680 Mission St | Acco Engineered Systems Inc. Dba Acco En | to obtain final inspection for work approved under pa#202505096190, all work is completeDetails
to obtain final inspection for work approved under pa#202505096190, all work is complete | |
| Dec 5, 2025 | Completed final sign-off Mar 2026 | 680 Mission St | Robert Hauser Construction | suite 101: commercial - remove existing countertop shelves storage alcove and 3 compartment sink in existing retail space to build out new bakery space. new plumbing, electrical, and finished as required planset. no structural work or hvac work required.Details
suite 101: commercial - remove existing countertop shelves storage alcove and 3 compartment sink in existing retail space to build out new bakery space. new plumbing, electrical, and finished as required planset. no structural work or hvac work required. | $38,000 |
| Nov 4, 2025 | Completed final sign-off Apr 2026 | 680 Mission St | Winfield Building Group Dba C.W. Dillion | unit a2f: kitchen and bathroom remodel. no walls moved, floor plan to remain unchanged fire deparation between units and mep maintained. no doors/windows alterations. no work outside, shall comply with chapter 11a(1102a.2. 1133a, and 1134a)Details
unit a2f: kitchen and bathroom remodel. no walls moved, floor plan to remain unchanged fire deparation between units and mep maintained. no doors/windows alterations. no work outside, shall comply with chapter 11a(1102a.2. 1133a, and 1134a) | $16,000 |
| Sep 24, 2025 | In progress filed Sep 2025, not yet issued | 680 Mission St | Green Water And Power | installation of 32 level 2 electric vehicle chargers in valet area of parking garage. installation of 2 sub panels and one transfromer. installation of all required conduit and conductors to connect proposed ev charging system to existing electrical service.Details
installation of 32 level 2 electric vehicle chargers in valet area of parking garage. installation of 2 sub panels and one transfromer. installation of all required conduit and conductors to connect proposed ev charging system to existing electrical service. | $45,000 |
| Sep 15, 2025 | In progress filed Sep 2025, not yet issued | 680 Mission St | Sabah International Incorporated | th intent of this project is a "voluntary" replacement of the existing, currently functioning, alarm control unit (facu) at the request of owner.Details
th intent of this project is a "voluntary" replacement of the existing, currently functioning, alarm control unit (facu) at the request of owner. | $221,927 |
| Jun 26, 2025 | Completed final sign-off Oct 2025 | 680 Mission St | Deacon Construction Llc | 2/f suite 200: legalize non-permitted 4 privacy booths in 2nd floor offices.Details
2/f suite 200: legalize non-permitted 4 privacy booths in 2nd floor offices. | $6,500 |
| May 9, 2025 | In progress issued May 2025 | 680 Mission St | Acco Engineered Systems Inc. Dba Acco En | like for like replacement of makeup air unit in the mechanical roomDetails
like for like replacement of makeup air unit in the mechanical room | $90,000 |
| Jan 30, 2025 | Completed final sign-off Mar 2025 | 680 Mission St | Giuliani Construction Incorp | unit 9e: to comply with nov 202432384 #5 - repair work , patch ceiling in kitchen & hallway, patch walls in hallway, kitchen and closet, insulate ceilings and walls. repair work in 9th floor hallway, patch and insulate hallway walls.Details
unit 9e: to comply with nov 202432384 #5 - repair work , patch ceiling in kitchen & hallway, patch walls in hallway, kitchen and closet, insulate ceilings and walls. repair work in 9th floor hallway, patch and insulate hallway walls. | $10,000 |
| Jan 2, 2025 | Completed final sign-off Oct 2025 | 680 Mission St | Green Water And Power | installation of 40 level 2 electric vehicle chargers in valet area of parking garage. installation of 1 sub panel. installation of all required conduit and conductors to connect proposed ev charging system to existing electrical service.Details
installation of 40 level 2 electric vehicle chargers in valet area of parking garage. installation of 1 sub panel. installation of all required conduit and conductors to connect proposed ev charging system to existing electrical service. | $45,000 |
| Nov 26, 2024 | Completed final sign-off Dec 2024 | 680 Mission St | Giuliani Construction Incorp | unit 9g- replace drywall, paint and carperting, wallpaper in entryway , bathroom, common hallway due to water damage to comply with nov 2024-30261.Details
unit 9g- replace drywall, paint and carperting, wallpaper in entryway , bathroom, common hallway due to water damage to comply with nov 2024-30261. | $9,000 |
| Sep 16, 2024 | Completed final sign-off Oct 2024 | 680 Mission St | Iron Rock Construction Inc | unit 9g.to comply with complaint# 202427924: drywall installation reconnect kitchen appliances, replace closet door, replace sink, and counter in kitchen. prime and paint walls. install outlet covers, replace floor in where needed.Details
unit 9g.to comply with complaint# 202427924: drywall installation reconnect kitchen appliances, replace closet door, replace sink, and counter in kitchen. prime and paint walls. install outlet covers, replace floor in where needed. | $7,000 |
| Mar 28, 2024 | Completed final sign-off Jul 2024 | 688 Mission St | J M E Construction Services Inc | rev 202401053503- remove (e) bar equipment to keep (e) floor sink and change seating layout to keep (e) low wall for restaurantDetails
rev 202401053503- remove (e) bar equipment to keep (e) floor sink and change seating layout to keep (e) low wall for restaurant | $500 |
| Feb 21, 2024 | In progress filed Feb 2024, not yet issued | 690 Mission St | installation of 2 new typ 2 kitchen exhaust hoods in an existing cafe spaceDetails
installation of 2 new typ 2 kitchen exhaust hoods in an existing cafe space | $30,000 | |
| Jan 5, 2024 | Completed final sign-off Jul 2024 | 688 Mission St | J M E Construction Services Inc | tenant improvement to remodel (e) bar w/ new equipment and finishes. open cased opening between the (e) grove restaurant and (e) pizza restaurant.Details
tenant improvement to remodel (e) bar w/ new equipment and finishes. open cased opening between the (e) grove restaurant and (e) pizza restaurant. | $56,000 |
| Sep 14, 2023 | In progress issued Oct 2023 | 680 Mission St | Winfield Building Group Dba C.W. Dillion | unit's: 24r, 10f, 10g- 1 kitchen and 1 bathroom remodel in each unit. no walls moved. floor plan to remain unchanged. fire seperation btw unit's and mep maintained. no door/ window alteration. no work outside unit's.Details
unit's: 24r, 10f, 10g- 1 kitchen and 1 bathroom remodel in each unit. no walls moved. floor plan to remain unchanged. fire seperation btw unit's and mep maintained. no door/ window alteration. no work outside unit's. | $220,000 |
| Jun 7, 2023 | Never finaled issued Jun 2023, no final | 680 Mission St | Winfield Building Group Dba C.W. Dillion | residential unit's: 24k, 36n, 10e, 21k: kitchen and bath remodel: 4 units- floor plan to remain unchanged. mep maintained. no alterations to window's and doors, no work outside unit, no walls moved. no structural work. remodel in kind. accessibility per cbc chapter 11a to be maintained.Details
residential unit's: 24k, 36n, 10e, 21k: kitchen and bath remodel: 4 units- floor plan to remain unchanged. mep maintained. no alterations to window's and doors, no work outside unit, no walls moved. no structural work. remodel in kind. accessibility per cbc chapter 11a to be maintained. | $326,020 |
| Mar 2, 2023 | Never finaled issued Mar 2023, no final | 680 Mission St | Winfield Building Group Dba C.W. Dillion | unit# 21k:one kitchen & one bath remodel, 1unit, floor plan to remain unchanged. mep maintained. no alterations to windows & doors. no work outside unit, remodel in kind. no walls moved. no structural work.Details
unit# 21k:one kitchen & one bath remodel, 1unit, floor plan to remain unchanged. mep maintained. no alterations to windows & doors. no work outside unit, remodel in kind. no walls moved. no structural work. | $90,430 |
| Mar 2, 2023 | Completed final sign-off Nov 2023 | 680 Mission St | Winfield Building Group Dba C.W. Dillion | unit# 37c & 10k, #40e: kitchen & bath remodel, 2 units, floor plan to remain unchanged. mep maintained. no alterations to windows & doors. no work outside unit, remodel in kind. no walls moved. no structural work.Details
unit# 37c & 10k, #40e: kitchen & bath remodel, 2 units, floor plan to remain unchanged. mep maintained. no alterations to windows & doors. no work outside unit, remodel in kind. no walls moved. no structural work. | $90,430 |
| Feb 28, 2023 | Expired or cancelled cancelled Jan 2026 | 690 Mission St | Winfield Building Group Dba C.W. Dillion | kitchen and bathroom remodel on 4 unit(s) 37c,10k,21k,40e, floorplan to remain unchanges. all adaptable features and fire seperation maintained. mep maintained. no alterations to windows and doors. no work outside unit. remodels in kind. no walls moved no structural work.Details
kitchen and bathroom remodel on 4 unit(s) 37c,10k,21k,40e, floorplan to remain unchanges. all adaptable features and fire seperation maintained. mep maintained. no alterations to windows and doors. no work outside unit. remodels in kind. no walls moved no structural work. | $90,000 |
| Sep 12, 2022 | Completed final sign-off Jun 2023 | 680 Mission St | Winfield Building Group Dba C.W. Dillion | unit 41# 35g 111c- 3 kitchen, 3 bath remodel , no walls moved. floor plan to remain unchanged. all adaptable features maintained. fire separtaion maintained between unit units. mep maintained no alterations to windows or doors. no work outside unit. kitchens and bathrooms remodel in kind.Details
unit 41# 35g 111c- 3 kitchen, 3 bath remodel , no walls moved. floor plan to remain unchanged. all adaptable features maintained. fire separtaion maintained between unit units. mep maintained no alterations to windows or doors. no work outside unit. kitchens and bathrooms remodel in kind. | $49,000 |
| Aug 18, 2022 | Completed final sign-off Nov 2022 | 680 Mission St | Winfield Building Group Dba C.W. Dillion | unit 12b, 29n, 32e: one kitchen & one bathroom remodel each in the three units. no walls moved. ploor plan to remain unchanged. fire separation between units & mep maintained. no door/ window alteration. no work outside unit.Details
unit 12b, 29n, 32e: one kitchen & one bathroom remodel each in the three units. no walls moved. ploor plan to remain unchanged. fire separation between units & mep maintained. no door/ window alteration. no work outside unit. | $49,000 |
| Jul 8, 2022 | Never finaled filed Jul 2022, never issued | 680 Mission St | permit for use of an intermediate length occupancy (ilo) within legally permitted use and occupancy for units a2h, 7h,7j, 9c,9d, 11f, 14c,14n, 15c, 15p, 16t, 17c, 18p, 19f, 19p, 19t, 21b, 22k, 23e, 25e, 29p, 31c, 31l, 32b,33b,33l,33p,35p,37e,38e,38f,39c,41b,pha. no work under this permit.Details
permit for use of an intermediate length occupancy (ilo) within legally permitted use and occupancy for units a2h, 7h,7j, 9c,9d, 11f, 14c,14n, 15c, 15p, 16t, 17c, 18p, 19f, 19p, 19t, 21b, 22k, 23e, 25e, 29p, 31c, 31l, 32b,33b,33l,33p,35p,37e,38e,38f,39c,41b,pha. no work under this permit. | ||
| Oct 20, 2021 | Completed final sign-off Jun 2023 | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 26g, 10p, 18c: kitchen and bath remodel. no walls moved. floor plan to remain unchanged. fire separation between units and mep maintained. no door/window alteration. no work outside unit. no structural work- no wall / framing modification.Details
units 26g, 10p, 18c: kitchen and bath remodel. no walls moved. floor plan to remain unchanged. fire separation between units and mep maintained. no door/window alteration. no work outside unit. no structural work- no wall / framing modification. | $70,000 |
| Oct 20, 2021 | Completed final sign-off May 2022 | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 12r, 12c, 11c: kitchen and bath remodel. no walls moved. floor plan to remain unchanged. fire separation between units and mep maintained. no door/window alteration. no work outside unit.Details
units 12r, 12c, 11c: kitchen and bath remodel. no walls moved. floor plan to remain unchanged. fire separation between units and mep maintained. no door/window alteration. no work outside unit. | $70,000 |
| Oct 15, 2021 | Never finaled issued Oct 2021, no final | 680 Mission St | Winfield Building Group Dba C.W. Dillion | to obtain final inspection for work approved under permit application no(s) 201901281397, 201903215899, 201906143463. all work is complete.Details
to obtain final inspection for work approved under permit application no(s) 201901281397, 201903215899, 201906143463. all work is complete. | |
| Oct 15, 2021 | Never finaled issued Oct 2021, no final | 680 Mission St | Winfield Building Group Dba C.W. Dillion | to obtain final inspection for work approved under permit application(s): 201806293369, 201901099972. all work is completed.Details
to obtain final inspection for work approved under permit application(s): 201806293369, 201901099972. all work is completed. | |
| Oct 15, 2021 | Never finaled issued Oct 2021, no final | 680 Mission St | Winfield Building Group Dba C.W. Dillion | to obtain final inspection for work approved under permit application#(s): 201908279992, 201910215020. all work is completed.Details
to obtain final inspection for work approved under permit application#(s): 201908279992, 201910215020. all work is completed. | |
| Aug 10, 2021 | Completed final sign-off May 2022 | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 15c, 31l, 21e: (3) kitchen & (3) bath remodel. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained. fire separation maintained between units. mep maintained. no alteration to windows or doors. no work outside units.Details
units 15c, 31l, 21e: (3) kitchen & (3) bath remodel. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained. fire separation maintained between units. mep maintained. no alteration to windows or doors. no work outside units. | $63,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2022 | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 10r, 17b, 17c: kitchen & bath remodel. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained. fire separation maintained between units. mep maintained. no alteration to windows or doors. no work outside units.Details
units 10r, 17b, 17c: kitchen & bath remodel. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained. fire separation maintained between units. mep maintained. no alteration to windows or doors. no work outside units. | $63,000 |
| Aug 10, 2021 | Never finaled issued Aug 2021, no final | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 17e, 40f, 32g: (3) kitchen & (3) bath remodel. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained. fire separation maintained between units. mep maintained. no alteration to windows or doors. no work outside units.Details
units 17e, 40f, 32g: (3) kitchen & (3) bath remodel. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained. fire separation maintained between units. mep maintained. no alteration to windows or doors. no work outside units. | $63,000 |
| Jul 9, 2021 | Completed final sign-off May 2022 | 690 Mission St | Western Awnings And Canvas | provide and install 1 corner canopy or front of restaurant. canopy is self supporting using 3" square poles anchored to ground. approx dimensions 55' long x 10'6" proj on 3rd st side x 26" ft long and 9 ft proj on mission st sideDetails
provide and install 1 corner canopy or front of restaurant. canopy is self supporting using 3" square poles anchored to ground. approx dimensions 55' long x 10'6" proj on 3rd st side x 26" ft long and 9 ft proj on mission st side | $35,000 |
| May 21, 2021 | Never finaled issued May 2021, no final | 680 Mission St | renovation to interior finishes, replacement and relocation of select light fixtures and door hardware at elevator lobbies and corridors at levels and a1 and a2Details
renovation to interior finishes, replacement and relocation of select light fixtures and door hardware at elevator lobbies and corridors at levels and a1 and a2 | $2,000 | |
| May 21, 2021 | Never finaled issued May 2021, no final | 690 Mission St | Aguilera Construction Company | t.i. for window replacement in an existing storefront system. scope of work is limited to replacing existing fixed glazing within the storefront with aluminum clad sliding wood windows. door moved/widened. no structural work is involved.Details
t.i. for window replacement in an existing storefront system. scope of work is limited to replacing existing fixed glazing within the storefront with aluminum clad sliding wood windows. door moved/widened. no structural work is involved. | $30,000 |
| Apr 19, 2021 | Never finaled issued Apr 2021, no final | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 35k/22t/39a/21t/30t 1 kitchen & 1 bathroom remodel in each unit (total 5 units). no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windows alteration. no work outside units. no new wall & no existing wall relocation. new lighting shallDetails
units 35k/22t/39a/21t/30t 1 kitchen & 1 bathroom remodel in each unit (total 5 units). no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windows alteration. no work outside units. no new wall & no existing wall relocation. new lighting shall | $49,500 |
| Apr 19, 2021 | Completed final sign-off Nov 2023 | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 26d/40a/16s/30b/35r kitchen & bathroom remodel. no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windowsw alteration. no work outside units.Details
units 26d/40a/16s/30b/35r kitchen & bathroom remodel. no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windowsw alteration. no work outside units. | $49,500 |
| Apr 19, 2021 | Completed final sign-off May 2022 | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 27r/09e/20s/28e/12e kitchen & bathroom remodel. no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windowsw alteration. no work outside units.Details
units 27r/09e/20s/28e/12e kitchen & bathroom remodel. no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windowsw alteration. no work outside units. | $49,500 |
| Apr 19, 2021 | Completed final sign-off Jun 2022 | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 20t, 09h, 10j, 22s, 39h. one kitchen & one bath remodel each at 5 units. no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windows alteration. no work outside units. no new wall x no existing wall relocation. new lighting shall comply w/Details
units 20t, 09h, 10j, 22s, 39h. one kitchen & one bath remodel each at 5 units. no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windows alteration. no work outside units. no new wall x no existing wall relocation. new lighting shall comply w/ | $49,500 |
| Apr 19, 2021 | Completed final sign-off May 2022 | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 14e/34r/34c/36m/37e kitchen & bathroom remodel. no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windowsw alteration. no work outside units.Details
units 14e/34r/34c/36m/37e kitchen & bathroom remodel. no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windowsw alteration. no work outside units. | $49,500 |
| Apr 19, 2021 | Never finaled issued Apr 2021, no final | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 35a/25t/08j/15f/10n: kitchen & bathroom remodel. no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windowsw alteration. no work outside units.Details
units 35a/25t/08j/15f/10n: kitchen & bathroom remodel. no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windowsw alteration. no work outside units. | $49,500 |
| Apr 19, 2021 | Completed final sign-off Nov 2023 | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 23t, 24s, 41a, 10m, 41b kitchen & bathroom remodel. no walls moved. floor plan to remain unchanged fire separation between units & mep maintained. no doors/windows alteration. no work outside units.Details
units 23t, 24s, 41a, 10m, 41b kitchen & bathroom remodel. no walls moved. floor plan to remain unchanged fire separation between units & mep maintained. no doors/windows alteration. no work outside units. | $49,500 |
| Jun 1, 2020 | Expired or cancelled cancelled Jan 2026 | 680 Mission St | units 35a, 25t, 08j, 15f, 10n kitchen & bath remodel. no walls moved. floor plan to remain unchanged. fire separation between units & mep maintained. no doors/window alteration. no work outside unitsDetails
units 35a, 25t, 08j, 15f, 10n kitchen & bath remodel. no walls moved. floor plan to remain unchanged. fire separation between units & mep maintained. no doors/window alteration. no work outside units | $49,500 | |
| Feb 6, 2020 | Never finaled issued Feb 2020, no final | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 40b, 23b, 12f kitchen & bath remodel. no walls moved. floor plan to remain unchanged. fire separation between units & mep maintained. no doors/window alteration. no work outside unitsDetails
units 40b, 23b, 12f kitchen & bath remodel. no walls moved. floor plan to remain unchanged. fire separation between units & mep maintained. no doors/window alteration. no work outside units | $50,000 |
| Dec 18, 2019 | Never finaled issued Dec 2019, no final | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 26r, 32 t, 32c, 20 p, 15, p: kitchen and bath remodel. no walls moved, floor plan to reamin unchanged. all e adaptable features maintained. fire sep maintained between units. mep maintained. no alt to windows or doors. no work outside.Details
units 26r, 32 t, 32c, 20 p, 15, p: kitchen and bath remodel. no walls moved, floor plan to reamin unchanged. all e adaptable features maintained. fire sep maintained between units. mep maintained. no alt to windows or doors. no work outside. | $75,000 |
| Oct 21, 2019 | Never finaled issued Nov 2019, no final | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units lot, 10t, 31c, 16p, 32d, 22r, kitchen and bath remodel. no walls moved, floor plan to remain unchanged, all (e) adaptable features maintained fire separation maintained betwen units, mep maintained, no alteration to windows or doors, no work outside unitsDetails
units lot, 10t, 31c, 16p, 32d, 22r, kitchen and bath remodel. no walls moved, floor plan to remain unchanged, all (e) adaptable features maintained fire separation maintained betwen units, mep maintained, no alteration to windows or doors, no work outside units | $75,000 |
| Aug 27, 2019 | Never finaled issued Sep 2019, no final | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 31a,28l,36p,30g,19c: kitchen and bath remodel. no walls moved. floor plan to remain unchanged. all extg adaptable features maintained. fire separation maintained between units. mep maintained. no alteration to wndows or doors. no work outside units. no change of (e) floor plan.Details
units 31a,28l,36p,30g,19c: kitchen and bath remodel. no walls moved. floor plan to remain unchanged. all extg adaptable features maintained. fire separation maintained between units. mep maintained. no alteration to wndows or doors. no work outside units. no change of (e) floor plan. | $75,000 |
| Aug 9, 2019 | Completed final sign-off Jun 2022 | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 30e, 25p, 33r, 23e, 27d - kitchen and bath remodel. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained. fire separation maintained between units. mep maintained. no alteration to windows or doors. no work outside unitsDetails
units 30e, 25p, 33r, 23e, 27d - kitchen and bath remodel. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained. fire separation maintained between units. mep maintained. no alteration to windows or doors. no work outside units | $75,000 |
| Jul 11, 2019 | Never finaled issued Jul 2019, no final | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 28c, 27k, 12k,36l,20k: kitchen and bath remodel. no walls moved. floor plan to remain unchanged. all extg adaptable features maintained. fire separation maintain between units. mep maintained. no alteration to windows or doors. no work outside units.Details
units 28c, 27k, 12k,36l,20k: kitchen and bath remodel. no walls moved. floor plan to remain unchanged. all extg adaptable features maintained. fire separation maintain between units. mep maintained. no alteration to windows or doors. no work outside units. | $75,000 |
| Jul 8, 2019 | Never finaled issued Jul 2019, no final | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 29r, 20e, 28d,11b,23r for kitchen and bath remodel. no walls moved, floor plan to remain unchanged. all extg adaptable features maintained. fire separation maintained between units. mep maintained no change. no alteration of walls, windows or doors. no work outside units.Details
units 29r, 20e, 28d,11b,23r for kitchen and bath remodel. no walls moved, floor plan to remain unchanged. all extg adaptable features maintained. fire separation maintained between units. mep maintained no change. no alteration of walls, windows or doors. no work outside units. | $150,000 |
| Jun 21, 2019 | Completed final sign-off Sep 2021 | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 20c, 20f, 18t, 31s, 33c. kitchen & bath remodel. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained. fire separation maintained btwn units. mep maintained no change. no alteration of walls. windows or doors. no work outside unit. no plans/no work outside unitDetails
units 20c, 20f, 18t, 31s, 33c. kitchen & bath remodel. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained. fire separation maintained btwn units. mep maintained no change. no alteration of walls. windows or doors. no work outside unit. no plans/no work outside unit | $75,000 |
| Jun 14, 2019 | Never finaled issued Jun 2019, no final | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units# 30s, 35c, 15r, 21n, 29e kitchen & bath remodel. no walls to be moved. floor plan unchanged. all (e) adaptable features maintained. fire separation maintained between units. mep maintained. no change. no alteration of walls, windows or doors.Details
units# 30s, 35c, 15r, 21n, 29e kitchen & bath remodel. no walls to be moved. floor plan unchanged. all (e) adaptable features maintained. fire separation maintained between units. mep maintained. no change. no alteration of walls, windows or doors. | $100,000 |
| Jun 14, 2019 | Completed final sign-off Jul 2019 | 680 Mission St | Sabah International Incorporated | 1st fl: modify existing fire alarm system. add 1 wall speaker/strobe. ref ti #201903185482.Details
1st fl: modify existing fire alarm system. add 1 wall speaker/strobe. ref ti #201903185482. | $8,800 |
| May 10, 2019 | Completed final sign-off Jan 2022 | 680 Mission St | Winfield Building Group Dba C.W. Dillion | (5) units 09b, 27t, 39f, 19e, 19f. 1 kitchen and 1 bath remodel in kind. no walls moved. flr plan to remain unchanged. all (e) adaptable features to be maintained. fire seperations maintained btw units. mep maintained no change. no plans.Details
(5) units 09b, 27t, 39f, 19e, 19f. 1 kitchen and 1 bath remodel in kind. no walls moved. flr plan to remain unchanged. all (e) adaptable features to be maintained. fire seperations maintained btw units. mep maintained no change. no plans. | $90,000 |
| Apr 30, 2019 | Never finaled filed Apr 2019, never issued | 680 Mission St | |||
| Apr 26, 2019 | Completed final sign-off Jan 2022 | 680 Mission St | Winfield Building Group Dba C.W. Dillion | (5 units) units #08e, 33d, 36r, 28s, 36b. (1) kitchen and (1) bath remodel in kind per unit. no walls moved. floor plan to remain unchanged. all existing adaptable features to be maintained. fire separation maintained between units. mep maintained no change.Details
(5 units) units #08e, 33d, 36r, 28s, 36b. (1) kitchen and (1) bath remodel in kind per unit. no walls moved. floor plan to remain unchanged. all existing adaptable features to be maintained. fire separation maintained between units. mep maintained no change. | $90,000 |
| Apr 8, 2019 | Never finaled issued May 2019, no final | 680 Mission St | Johnson United Inc Dba United Sign Syste | install 1 electric single faced wall sign "urban remedy"Details
install 1 electric single faced wall sign "urban remedy" | $1,200 |
| Mar 21, 2019 | Never finaled issued Mar 2019, no final | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units #24c, 11r, 18r, 19r, a2h. kitchen & bath remodel. no walls moved. floor plan unchanged. all existing adaptable features maintained. fire separation maintained between units. mep maintained. no alteration of wall window or door.Details
units #24c, 11r, 18r, 19r, a2h. kitchen & bath remodel. no walls moved. floor plan unchanged. all existing adaptable features maintained. fire separation maintained between units. mep maintained. no alteration of wall window or door. | $100,000 |
| Mar 18, 2019 | Completed final sign-off Jul 2019 | 680 Mission St | Taylor Resaurant System | ground flr ti - non structural partitions walls and ceiling panel, wood wall paneling installation of freestanding pos, millwork w/accessible product display shelving storage shelving minor ele and hvac. relocation of one 3-comp sink and handwashing stationDetails
ground flr ti - non structural partitions walls and ceiling panel, wood wall paneling installation of freestanding pos, millwork w/accessible product display shelving storage shelving minor ele and hvac. relocation of one 3-comp sink and handwashing station | $90,000 |
| Mar 14, 2019 | Never finaled issued Mar 2019, no final | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 29p, 12p, 33e and 35d - kitchen and bath remodel in kind. no walls moved. floor plan unchanged. all existing adaptable features maintained. fire separation maintained between units. mep maintainedDetails
units 29p, 12p, 33e and 35d - kitchen and bath remodel in kind. no walls moved. floor plan unchanged. all existing adaptable features maintained. fire separation maintained between units. mep maintained | $150,000 |
| Feb 7, 2019 | Completed final sign-off Jan 2022 | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 20r, 29t, 18g, 30c, 24t. kitchen and bath remodel, no walls moved. floor plan unchanged. all existing adaptable features maintained. fire separted maintained between units. mep maintained no change. no alteration or walls, windows, and doorDetails
units 20r, 29t, 18g, 30c, 24t. kitchen and bath remodel, no walls moved. floor plan unchanged. all existing adaptable features maintained. fire separted maintained between units. mep maintained no change. no alteration or walls, windows, and door | $75,000 |
| Jan 28, 2019 | Never finaled issued Jan 2019, no final | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 33s, 16c, 19g, 34g, 34p kitchen and bath remodel no wall moved floor plan ot remain unchanged, a (e) adaptable reatures to be maintained fire seperation maintained, between units. mep maintaied no changeDetails
units 33s, 16c, 19g, 34g, 34p kitchen and bath remodel no wall moved floor plan ot remain unchanged, a (e) adaptable reatures to be maintained fire seperation maintained, between units. mep maintaied no change | $75,000 |
| Jan 9, 2019 | Never finaled issued Jan 2019, no final | 680 Mission St | Winfield Building Group Dba C.W. Dillion | units 17r, 17t, 12g, 31p kitchen and bath remodel. no walls moved. floor plan to remain unchanged. a(e) adaptable features to be maintained. fire seperation maintained btw unit mep maintained no change no plansDetails
units 17r, 17t, 12g, 31p kitchen and bath remodel. no walls moved. floor plan to remain unchanged. a(e) adaptable features to be maintained. fire seperation maintained btw unit mep maintained no change no plans | $75,000 |
| Dec 4, 2018 | Completed final sign-off Sep 2019 | 680 Mission St | Holland Brooks Builders Inc | units 26c, 38e, phb: kitchen & bath remodel. no walls moved, floor plan unchanged, (e) adaptable features to be maintained. fire seperation maintained between units. mep maintained. no commercial part will work.Details
units 26c, 38e, phb: kitchen & bath remodel. no walls moved, floor plan unchanged, (e) adaptable features to be maintained. fire seperation maintained between units. mep maintained. no commercial part will work. | $75,000 |
| Nov 21, 2018 | Completed final sign-off Sep 2019 | 680 Mission St | Holland Brooks Builders Inc | units 11f, 26f, 32a, 38b, kithcen & bath remodel, no walls moved, floor plan unchanged, (e) adaptable features to be maintained, fire separation maintained between units, mep maintainedDetails
units 11f, 26f, 32a, 38b, kithcen & bath remodel, no walls moved, floor plan unchanged, (e) adaptable features to be maintained, fire separation maintained between units, mep maintained | $100,000 |
| Nov 20, 2018 | Completed final sign-off Aug 2019 | 688 Mission St | Cookline Construction Inc | install non electric hanging double faced sign - will hang from (e) awning "pizzeria delfina". n/a for maher.Details
install non electric hanging double faced sign - will hang from (e) awning "pizzeria delfina". n/a for maher. | $1,500 |
| Nov 9, 2018 | Completed final sign-off Dec 2018 | 680 Mission St | Certified Fire And Safety | install ul 300 ansul fire system to protect kitchen cooking equipment, and non-listed pollution conrol unit "airmaid brand" (2 cyl)Details
install ul 300 ansul fire system to protect kitchen cooking equipment, and non-listed pollution conrol unit "airmaid brand" (2 cyl) | $4,000 |
| Oct 30, 2018 | Completed final sign-off Sep 2019 | 680 Mission St | Holland Brooks Builders Inc | units 33g, 36k, 23g, 28r. kichen and bath remodel. no walls moved. floor plan to remain unchanged. a (e) adaptable features to be maintained. fire separation maintained between units. mep maintained no change. no plansDetails
units 33g, 36k, 23g, 28r. kichen and bath remodel. no walls moved. floor plan to remain unchanged. a (e) adaptable features to be maintained. fire separation maintained between units. mep maintained no change. no plans | $100,000 |
| Oct 12, 2018 | Never finaled issued Oct 2018, no final | 690 Mission St | Holland Brooks Builders Inc | remodel four units for kitchen and one bath for each units 32p, 31g, 33n and phf. no walls moved, floor plan to remain unchange. all (e) adaptable features to be maintained. fire separation to be maintained between units.Details
remodel four units for kitchen and one bath for each units 32p, 31g, 33n and phf. no walls moved, floor plan to remain unchange. all (e) adaptable features to be maintained. fire separation to be maintained between units. | $75,000 |
| Sep 20, 2018 | Completed final sign-off Jun 2019 | 688 Mission St | Cookline Construction Inc | install new steel exterior canopy at street level for the 3 story bldg facing mission streetDetails
install new steel exterior canopy at street level for the 3 story bldg facing mission street | $3,000 |
| Sep 17, 2018 | Completed final sign-off Dec 2018 | 680 Mission St | Holland Brooks Builders Inc | adminsistrative correction to bpa# 201808318919. units should read "38h, 24p, 35e, and a2j"Details
adminsistrative correction to bpa# 201808318919. units should read "38h, 24p, 35e, and a2j" | |
| Aug 31, 2018 | Completed final sign-off Dec 2018 | 680 Mission St | Holland Brooks Builders Inc | units 34h, 24p, 35e, a2j: kitchen and bath remodel, no walls moved, floor plan to remain unchanged, all (e) adaptable features to be maintained. fire and separation maintained between units. maher n/aDetails
units 34h, 24p, 35e, a2j: kitchen and bath remodel, no walls moved, floor plan to remain unchanged, all (e) adaptable features to be maintained. fire and separation maintained between units. maher n/a | $100,000 |
| Aug 21, 2018 | Completed final sign-off Sep 2019 | 680 Mission St | Holland Brooks Builders Inc | for units 15b, 14t, 27e, 34s: each unit: kitchen & bathroom remodel in-kind. no walls moved, added or infilled. (e) layout unchanged. (e) adaptable features to be maintained. mainte fire rating & separation between units.Details
for units 15b, 14t, 27e, 34s: each unit: kitchen & bathroom remodel in-kind. no walls moved, added or infilled. (e) layout unchanged. (e) adaptable features to be maintained. mainte fire rating & separation between units. | $100,000 |
| Aug 3, 2018 | Completed final sign-off Sep 2019 | 680 Mission St | Holland Brooks Builders Inc | units 18f, 30f, 33p, 28p kitchen and bath remodel in kind. no walls moved, added or infilled. (e) layout unchanged (e) adaptable features to be maintained. maintain fire rating and separation between units. (lgihtings per cerc 150.0(k)Details
units 18f, 30f, 33p, 28p kitchen and bath remodel in kind. no walls moved, added or infilled. (e) layout unchanged (e) adaptable features to be maintained. maintain fire rating and separation between units. (lgihtings per cerc 150.0(k) | $100,000 |
| Jul 23, 2018 | Completed final sign-off Sep 2019 | 680 Mission St | Holland Brooks Builders Inc | units 22c,27,365 kitchen and bath remodel in kind. no walls moved, added or infilled. (e) layout unchanged (e) adaptable features to be maintained. maintain fire rating and separation between units.Details
units 22c,27,365 kitchen and bath remodel in kind. no walls moved, added or infilled. (e) layout unchanged (e) adaptable features to be maintained. maintain fire rating and separation between units. | $75,000 |
| Jul 16, 2018 | Completed final sign-off Dec 2018 | 688 Mission St | Sabah International Incorporated | ref pa# 201802080766 modify existing fire alarm system, add (10) speakers/strobes,(1) booster power supply, (1) synch module, (1) smoke detector, add (1) control relay for music shutdown.Details
ref pa# 201802080766 modify existing fire alarm system, add (10) speakers/strobes,(1) booster power supply, (1) synch module, (1) smoke detector, add (1) control relay for music shutdown. | $21,772 |
| Jul 11, 2018 | Completed final sign-off Nov 2018 | 688 Mission St | Westates Mechanical Corporation Inc | modifiy sprinkler system in ti area of work: relocate 20 pendents, relocate 5 uprights add 12 pendents, add 1 uprightDetails
modifiy sprinkler system in ti area of work: relocate 20 pendents, relocate 5 uprights add 12 pendents, add 1 upright | $15,000 |
| Jun 29, 2018 | Never finaled issued Jul 2018, no final | 680 Mission St | Winfield Building Group Dba C.W. Dillion, Holland Brooks Builders Inc | kitchen and bath remodel for units 15c, 31d, 12s. no walls moved, added or infilled. layout to remain unchanged. all (e) adaptable features are to be maintained. maher naDetails
kitchen and bath remodel for units 15c, 31d, 12s. no walls moved, added or infilled. layout to remain unchanged. all (e) adaptable features are to be maintained. maher na | $75,000 |
| Jun 29, 2018 | Completed final sign-off Sep 2019 | 680 Mission St | Winfield Building Group Dba C.W. Dillion, Holland Brooks Builders Inc | kitchen and bath remodel for units 24n, 10s, 12t, 33b,33k. no walls moved, added or infilled. layout to remain unchanged. all (e) adaptable features are to be maintained. maher naDetails
kitchen and bath remodel for units 24n, 10s, 12t, 33b,33k. no walls moved, added or infilled. layout to remain unchanged. all (e) adaptable features are to be maintained. maher na | $125,000 |
| Jun 28, 2018 | Never finaled issued Jun 2018, no final | 71 03rd St | Bradford Construction | revision rear exit door for permit #201710040347. maher naDetails
revision rear exit door for permit #201710040347. maher na | $400 |
| Jun 19, 2018 | Completed final sign-off Sep 2019 | 680 Mission St | Holland Brooks Builders Inc | units 21 b, 23 n, 29 d, 29 g, 27 g. kitchen and bath remodel, in-kind. no walls moved, added on infilled. (e) layout to remain unchanged. (e) adaptable features to be maintainedDetails
units 21 b, 23 n, 29 d, 29 g, 27 g. kitchen and bath remodel, in-kind. no walls moved, added on infilled. (e) layout to remain unchanged. (e) adaptable features to be maintained | $100,000 |
| Jun 13, 2018 | Never finaled issued Jun 2018, no final | 71 03rd St | International Fire Equip | 1/f: install ul 300 fire system hood & duct. fire alarm separate permit. ref 201804247163Details
1/f: install ul 300 fire system hood & duct. fire alarm separate permit. ref 201804247163 | $7,000 |
| Jun 7, 2018 | Completed final sign-off Dec 2018 | 680 Mission St | Holland Brooks Builders Inc | units 32l, 32r, 11e, 27c, 21p: kitchen & bathroom remodel in-kind. no walls added. moved or infilled. (e) layout to remain unchanged. all adaptable fixtures to be maintained. replace fixtures & finishes only.Details
units 32l, 32r, 11e, 27c, 21p: kitchen & bathroom remodel in-kind. no walls added. moved or infilled. (e) layout to remain unchanged. all adaptable fixtures to be maintained. replace fixtures & finishes only. | $150,000 |
| Jun 5, 2018 | Never finaled issued Jun 2018, no final | 71 03rd St | Sabah International Incorporated | modify extg fire alarm system. add 7 new ceiling speaker/strobe, 5 nw wall speaker/strobe, 2 new ceiling strobe, 1 new synch module, 1 smoke detector, 7 duct smoke detector, 7 control relay, 1 booster panel. ref t.i. app#201710040347. n/a for maherDetails
modify extg fire alarm system. add 7 new ceiling speaker/strobe, 5 nw wall speaker/strobe, 2 new ceiling strobe, 1 new synch module, 1 smoke detector, 7 duct smoke detector, 7 control relay, 1 booster panel. ref t.i. app#201710040347. n/a for maher | $19,032 |
| May 17, 2018 | Completed final sign-off Oct 2018 | 680 Mission St | Holland Brooks Builders Inc | units 24b, 17s, 08d, 17p 24g: kitchen and bathroom remodel in kind. no walls added, moved or infilled. (e) layout unchanged. all adaptable fixtures to be maintained. replace fixtures and finishes only.Details
units 24b, 17s, 08d, 17p 24g: kitchen and bathroom remodel in kind. no walls added, moved or infilled. (e) layout unchanged. all adaptable fixtures to be maintained. replace fixtures and finishes only. | |
| May 1, 2018 | Completed final sign-off Dec 2018 | 680 Mission St | Holland Brooks Builders Inc | units: 08h, 17g, 26d, 36f, 21g: kitchen & bath remodel in kind; no walls added, moved, infilled; (e) layout unchanged. all adaptable features to be maintained. replace fixtures and finishes only. maher naDetails
units: 08h, 17g, 26d, 36f, 21g: kitchen & bath remodel in kind; no walls added, moved, infilled; (e) layout unchanged. all adaptable features to be maintained. replace fixtures and finishes only. maher na | $45,000 |
| Apr 17, 2018 | Never finaled issued Jun 2018, no final | 71 03rd St | J M E Construction Services Inc | new canopy, awning, exterior planters, railing and seating. ref app#201710040347. n/a for maherDetails
new canopy, awning, exterior planters, railing and seating. ref app#201710040347. n/a for maher | $25,000 |
| Apr 6, 2018 | Completed final sign-off Dec 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen and bath remodel "in-kind" for units: 12n, 23p, 26s, 31n, 32s. no walls moved/aded/infilled. (e) layout to remain unchanged. all (e) adaptable features are to be maintained.Details
kitchen and bath remodel "in-kind" for units: 12n, 23p, 26s, 31n, 32s. no walls moved/aded/infilled. (e) layout to remain unchanged. all (e) adaptable features are to be maintained. | $100,000 |
| Apr 6, 2018 | Never finaled issued Apr 2018, no final | 71 03rd St | Aegis Enterprises Inc | add (31) ssp, add (4) relocate (2) ssu, add 2 dry pendent sprinlklers to accomodate new t.i. changes. ref app#201710040347. n/a for maherDetails
add (31) ssp, add (4) relocate (2) ssu, add 2 dry pendent sprinlklers to accomodate new t.i. changes. ref app#201710040347. n/a for maher | $1,500 |
| Mar 30, 2018 | Completed final sign-off Apr 2018 | 167 Jessie St | Skender Construction Llc | attache vinyl sign to interior of window/doorDetails
attache vinyl sign to interior of window/door | |
| Mar 29, 2018 | Completed final sign-off Sep 2018 | 680 Mission St | Holland Brooks Builders Inc | units : 24f, 25r, 28n, 32f & 34f; kitchen & bath remodel inkind. ; no walls moved/added/ infilled; (e)layout to remain unchanged. all(e) adaptable features are to be maintained.Details
units : 24f, 25r, 28n, 32f & 34f; kitchen & bath remodel inkind. ; no walls moved/added/ infilled; (e)layout to remain unchanged. all(e) adaptable features are to be maintained. | $100,000 |
| Mar 22, 2018 | Completed final sign-off Dec 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen & bath remodel in-kind for units: 15s, 20g, 23s, 36e; no walls moved/added/infilled. (e) layout to remain unchanged, all (e) adaptable features are to maintained.Details
kitchen & bath remodel in-kind for units: 15s, 20g, 23s, 36e; no walls moved/added/infilled. (e) layout to remain unchanged, all (e) adaptable features are to maintained. | $60,000 |
| Mar 19, 2018 | Completed final sign-off Aug 2018 | 167 Jessie St | Skender Construction Llc | revision to 201612286096/r1 - lock sets for restroom, kitchen outlets, ele for ada buttons and adding assistaove listening device, ele panel relocationDetails
revision to 201612286096/r1 - lock sets for restroom, kitchen outlets, ele for ada buttons and adding assistaove listening device, ele panel relocation | |
| Feb 23, 2018 | Completed final sign-off Dec 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen and bath remodel in-kind for units: 30k, 31k, 34e & 35b. no walls moved/added/infilled. (e) layout to remain unchanged.Details
kitchen and bath remodel in-kind for units: 30k, 31k, 34e & 35b. no walls moved/added/infilled. (e) layout to remain unchanged. | $60,000 |
| Feb 8, 2018 | Completed final sign-off Jun 2019 | 688 Mission St | Cookline Construction Inc | construction of a bona-fide restaurant in the location of an (e) restaruant, replacing (e) door, re-orientation of (e) glazing.Details
construction of a bona-fide restaurant in the location of an (e) restaruant, replacing (e) door, re-orientation of (e) glazing. | $180,000 |
| Feb 8, 2018 | Completed final sign-off Oct 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen and bath remodel in kind for units: 17n, 21f & 23f. no walls moved/added/infilled; (e) layout to remain unchanged.Details
kitchen and bath remodel in kind for units: 17n, 21f & 23f. no walls moved/added/infilled; (e) layout to remain unchanged. | $45,000 |
| Jan 29, 2018 | Completed final sign-off Dec 2018 | 680 Mission St | Holland Brooks Builders Inc | units 10l, 18b, 27p - kitchen & bath remodel in kind; no walls moved/ added/infilled..(e) layout to remain unchanged.Details
units 10l, 18b, 27p - kitchen & bath remodel in kind; no walls moved/ added/infilled..(e) layout to remain unchanged. | $45,000 |
| Jan 19, 2018 | Completed final sign-off Jan 2018 | 167 Jessie St | Red Hawk Fire & Security Ca Llc | floors 1,3 & 4 - revision to 201710302658 fire alarm ti - add 1 new amplifier, 1 power supply, 29 speaker/strobes, 1 strobe, 2 control relays, 11 duct detectors and 4 smk det/ maher naDetails
floors 1,3 & 4 - revision to 201710302658 fire alarm ti - add 1 new amplifier, 1 power supply, 29 speaker/strobes, 1 strobe, 2 control relays, 11 duct detectors and 4 smk det/ maher na | |
| Jan 17, 2018 | Completed final sign-off Mar 2018 | 680 Mission St | Holland Brooks Builders Inc | admin. correction of pa#201702068712. scope was to remodel five units: 17f, 26t, 33a, 34d, 34f. 17f was covered under pa#201704073446. 34d was covered under pa#201704073443.Details
admin. correction of pa#201702068712. scope was to remodel five units: 17f, 26t, 33a, 34d, 34f. 17f was covered under pa#201704073446. 34d was covered under pa#201704073443. | |
| Jan 9, 2018 | Never finaled issued Jan 2018, no final | 167 Jessie St | Red Hawk Fire & Security Ca Llc | fire alarm t.i. on 1st, 3rd, & 4th floors add 1 new amplifier, 1 power supply with sync modules, 29 speaker strobes,1 strobe, 1 ceiling speaker strobe, 7 duct detectors with control relays for heat pump, & 4 duct detectors for fsds with control. ref app#201612286096. n/a for maherDetails
fire alarm t.i. on 1st, 3rd, & 4th floors add 1 new amplifier, 1 power supply with sync modules, 29 speaker strobes,1 strobe, 1 ceiling speaker strobe, 7 duct detectors with control relays for heat pump, & 4 duct detectors for fsds with control. ref app#201612286096. n/a for maher | $15,000 |
| Dec 22, 2017 | Completed final sign-off Dec 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen and bath remodel in-kind for units: 195, 31d, 25f, 25s, no walls added, moved, in-filled, (e) layout to remain unchangedDetails
kitchen and bath remodel in-kind for units: 195, 31d, 25f, 25s, no walls added, moved, in-filled, (e) layout to remain unchanged | $60,000 |
| Dec 13, 2017 | Never finaled issued Dec 2017, no final | 167 Jessie St | Maguire Inc Dba Lahue And Associates | 3rd & 4th flrs: evac mapsDetails
3rd & 4th flrs: evac maps | $3,500 |
| Dec 11, 2017 | Completed final sign-off Sep 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen & bath remodel in-kind for units: 19n, 24e, 27s, 38c & 33l; no walls move/added/infilled; (e) layout to remain unchanged.Details
kitchen & bath remodel in-kind for units: 19n, 24e, 27s, 38c & 33l; no walls move/added/infilled; (e) layout to remain unchanged. | $75,000 |
| Dec 1, 2017 | Completed final sign-off Aug 2018 | 167 Jessie St | Skender Construction Llc | revision to app#201612286096: change pocket to swing doors, shifting location of walls, minor millwork and furring of wall around pipe. n/a for maher.Details
revision to app#201612286096: change pocket to swing doors, shifting location of walls, minor millwork and furring of wall around pipe. n/a for maher. | |
| Nov 16, 2017 | Completed final sign-off Oct 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen & bath remodel in kind, for units 12s, 16g, 23c & 32b, nbo wallms moved/added/infilled (e) layout to remain unchangedDetails
kitchen & bath remodel in kind, for units 12s, 16g, 23c & 32b, nbo wallms moved/added/infilled (e) layout to remain unchanged | $60,000 |
| Oct 30, 2017 | Completed final sign-off Dec 2017 | 167 Jessie St | Anderson, Rowe & Buckley, Inc. | floors 1,3 & 4 - existing fire sprinkler system per t.i.: 1st - 2 relocated uprights; 2 added uprights; 2 relocated pendents. 3rd floor: 1 relocated pendent; 4 relcoated uprights; 1 added uprights. 4th floor: 13 relcoated pendents; 4 added pendents; 2 added uprights. n/a maher ordinanceDetails
floors 1,3 & 4 - existing fire sprinkler system per t.i.: 1st - 2 relocated uprights; 2 added uprights; 2 relocated pendents. 3rd floor: 1 relocated pendent; 4 relcoated uprights; 1 added uprights. 4th floor: 13 relcoated pendents; 4 added pendents; 2 added uprights. n/a maher ordinance | $4,650 |
| Oct 27, 2017 | Completed final sign-off Sep 2018 | 680 Mission St | Holland Brooks Builders Inc | kichen & bath remodel "in-kind" for units: 21s, 7j, 11n, 18k; no walls moved/added/infilled, (e) layout to remain unchanged.Details
kichen & bath remodel "in-kind" for units: 21s, 7j, 11n, 18k; no walls moved/added/infilled, (e) layout to remain unchanged. | $75,000 |
| Oct 27, 2017 | Completed final sign-off Oct 2018 | 680 Mission St | Holland Brooks Builders Inc | kichen & bath remodel "in-kind" for units: 37h, 21r, 39g, 14g & 39b; no walls moved/added/infilled, (e) layout to remain unchanged.Details
kichen & bath remodel "in-kind" for units: 37h, 21r, 39g, 14g & 39b; no walls moved/added/infilled, (e) layout to remain unchanged. | $75,000 |
| Oct 27, 2017 | Completed final sign-off Oct 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen & bath remodel "in-kind" for units: 40c, 22b, 10c, 28b, 38a; no walls moved/added/infilled, (e) layout to remain unchanged.Details
kitchen & bath remodel "in-kind" for units: 40c, 22b, 10c, 28b, 38a; no walls moved/added/infilled, (e) layout to remain unchanged. | $75,000 |
| Oct 27, 2017 | Completed final sign-off Dec 2018 | 680 Mission St | Holland Brooks Builders Inc | kichen & bath remodel "in-kind" for units: 22n, 32k, 40d & 39e; no walls moved/added/infilledDetails
kichen & bath remodel "in-kind" for units: 22n, 32k, 40d & 39e; no walls moved/added/infilled | $60,000 |
| Oct 27, 2017 | Completed final sign-off Oct 2018 | 680 Mission St | Holland Brooks Builders Inc | kichen & bath remodel "in-kind" for units: 30a, 15t, 37d, 31e, 34b; no walls moved/added/infilled, (e) layout to remain unchanged.Details
kichen & bath remodel "in-kind" for units: 30a, 15t, 37d, 31e, 34b; no walls moved/added/infilled, (e) layout to remain unchanged. | $75,000 |
| Oct 24, 2017 | Completed final sign-off Dec 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen & bath remodel "in-kind" for units: 17k, 24e, 26e, 31r, 33aDetails
kitchen & bath remodel "in-kind" for units: 17k, 24e, 26e, 31r, 33a | $75,000 |
| Oct 19, 2017 | Completed final sign-off May 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen & bath remodel "in-kind" for units 20n, 22e, 19p, 40g, & 26k; (e) layout to remain unchanged. maher ord 155-13 naDetails
kitchen & bath remodel "in-kind" for units 20n, 22e, 19p, 40g, & 26k; (e) layout to remain unchanged. maher ord 155-13 na | $60,000 |
| Oct 19, 2017 | Completed final sign-off May 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen & bath remodel "in-kind" for units 16e, 165, 30r, 29f, & 38f; (e) layout to remain unchanged. maher ord 155-13 naDetails
kitchen & bath remodel "in-kind" for units 16e, 165, 30r, 29f, & 38f; (e) layout to remain unchanged. maher ord 155-13 na | $60,000 |
| Oct 19, 2017 | Completed final sign-off Oct 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen & bath remodel "in-kind" for units 15e, 15g, 15n, 8c, & 29s; (e) layout to remain unchanged. maher ord 155-13 naDetails
kitchen & bath remodel "in-kind" for units 15e, 15g, 15n, 8c, & 29s; (e) layout to remain unchanged. maher ord 155-13 na | $60,000 |
| Oct 18, 2017 | Expired or cancelled cancelled Oct 2017 | 680 Mission St | Holland Brooks Builders Inc | kitchen & bath remodel "in-kind" for units 22e, 40g, 19p, 20n, & 26k, (e) remain unchanged. maher ord 155-13Details
kitchen & bath remodel "in-kind" for units 22e, 40g, 19p, 20n, & 26k, (e) remain unchanged. maher ord 155-13 | $60,000 |
| Oct 18, 2017 | Expired or cancelled cancelled Oct 2017 | 680 Mission St | Holland Brooks Builders Inc | kitchen & bath remodel "in-kind" for units 16r, 30r, 38f, 29f, & 16e; (e) remain unchanged. maher ord 155-13Details
kitchen & bath remodel "in-kind" for units 16r, 30r, 38f, 29f, & 16e; (e) remain unchanged. maher ord 155-13 | $60,000 |
| Oct 18, 2017 | Expired or cancelled cancelled Oct 2017 | 680 Mission St | Holland Brooks Builders Inc | kitchen & bath remodel "in-kind" for units 15e, 15n, 15g, 8c, & 29s; (e) remain unchanged. maher ord 155-13Details
kitchen & bath remodel "in-kind" for units 15e, 15n, 15g, 8c, & 29s; (e) remain unchanged. maher ord 155-13 | $60,000 |
| Oct 4, 2017 | Never finaled issued Nov 2017, no final | 71 03rd St | Bradford Construction | g/f -ti of restaurant w/non-structural walls, equipment, finishes w/associated plumbing, electrical, & mechanical. maher na. new address assignment: 91 third street.Details
g/f -ti of restaurant w/non-structural walls, equipment, finishes w/associated plumbing, electrical, & mechanical. maher na. new address assignment: 91 third street. | $215,000 |
| Sep 5, 2017 | Expired or cancelled cancelled Nov 2017 | 680 Mission St | Holland Brooks Builders Inc | in-kind kitchen/bath remodel for units 40c, 22b, 10c, 28b, 38a, no walls moved/added/infilled, (e) layout to remain unchanged.Details
in-kind kitchen/bath remodel for units 40c, 22b, 10c, 28b, 38a, no walls moved/added/infilled, (e) layout to remain unchanged. | $75,000 |
| Sep 5, 2017 | Expired or cancelled cancelled Nov 2017 | 680 Mission St | Holland Brooks Builders Inc | in-kind kitchen/bath remodel for units 22n, 32k, 22p, 40d, 39e, no walls moved/added/infilled, (e) layout to remain unchanged.Details
in-kind kitchen/bath remodel for units 22n, 32k, 22p, 40d, 39e, no walls moved/added/infilled, (e) layout to remain unchanged. | $75,000 |
| Sep 5, 2017 | Expired or cancelled cancelled Nov 2017 | 680 Mission St | Holland Brooks Builders Inc | in-kind kitchen/bath remodel for units 37h, 21r, 39g, 14g, 39b, no walls moved/added/infilled, (e) layout to remain unchanged. n/a maherDetails
in-kind kitchen/bath remodel for units 37h, 21r, 39g, 14g, 39b, no walls moved/added/infilled, (e) layout to remain unchanged. n/a maher | $75,000 |
| Sep 5, 2017 | Expired or cancelled cancelled Nov 2017 | 680 Mission St | Holland Brooks Builders Inc | in-kind kitchen/bath remodel for units 30a, 15t, 37d, 31e, 34b, no walls moved/added/infilled, (e) layout to remain unchanged.Details
in-kind kitchen/bath remodel for units 30a, 15t, 37d, 31e, 34b, no walls moved/added/infilled, (e) layout to remain unchanged. | $75,000 |
| Sep 5, 2017 | Expired or cancelled cancelled Nov 2017 | 680 Mission St | Holland Brooks Builders Inc | in-kind kitchen/bath remodel for units 21s, 7j, 11n, 18k, no walls moved/added/infilled, (e) layout to remain unchanged.Details
in-kind kitchen/bath remodel for units 21s, 7j, 11n, 18k, no walls moved/added/infilled, (e) layout to remain unchanged. | $75,000 |
| Aug 8, 2017 | Completed final sign-off May 2018 | 680 Mission St | Holland Brooks Builders Inc | as builts. fire permit only for amendment to issued pa#201707101336 for units #9c, 11t, 14f, 25c, 39c.Details
as builts. fire permit only for amendment to issued pa#201707101336 for units #9c, 11t, 14f, 25c, 39c. | |
| Aug 8, 2017 | Completed final sign-off Feb 2019 | 680 Mission St | Holland Brooks Builders Inc | as builts. fire permit only for amendment to issued pa#201707101333 for units #10b, 16n, 28g, 33t, ph6Details
as builts. fire permit only for amendment to issued pa#201707101333 for units #10b, 16n, 28g, 33t, ph6 | |
| Aug 8, 2017 | Completed final sign-off Feb 2019 | 680 Mission St | Holland Brooks Builders Inc | as builts. fire permit only for amendment to issued pa#201707101337 for units #22f, 27b, 28f, 40hDetails
as builts. fire permit only for amendment to issued pa#201707101337 for units #22f, 27b, 28f, 40h | |
| Aug 8, 2017 | Completed final sign-off Apr 2018 | 680 Mission St | Holland Brooks Builders Inc | as builts. fire permit only for amendment to issued pa#201707101335 for units #7h, 19k, 19t, 21c, 22n.Details
as builts. fire permit only for amendment to issued pa#201707101335 for units #7h, 19k, 19t, 21c, 22n. | |
| Jul 10, 2017 | Completed final sign-off May 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen and bath remodel in-kind for units: 22f, 27b, 28f, 386, 40h.no walls moved, added or in-filled. (e) layout to remain unchanged..Details
kitchen and bath remodel in-kind for units: 22f, 27b, 28f, 386, 40h.no walls moved, added or in-filled. (e) layout to remain unchanged.. | $75,000 |
| Jul 10, 2017 | Completed final sign-off Oct 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen and bath remodel in-kind for units: 7h, 19k,19t, 21c, 22n. no walls moved, added or in-filled. (e) layout to remain unchanged..Details
kitchen and bath remodel in-kind for units: 7h, 19k,19t, 21c, 22n. no walls moved, added or in-filled. (e) layout to remain unchanged.. | $75,000 |
| Jul 10, 2017 | Completed final sign-off Apr 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen and bath remodel in-kind for units: 9c, 11t, 14f, 25c, 39c. no walls moved, added or in-filled. (e) layout to remain unchanged..Details
kitchen and bath remodel in-kind for units: 9c, 11t, 14f, 25c, 39c. no walls moved, added or in-filled. (e) layout to remain unchanged.. | $75,000 |
| Jul 10, 2017 | Completed final sign-off May 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen and bath remodel in-kind for units: 10b, 16n, 286, 33t, and ph-6. no walls moved, added or in-filled. (e) layout to remain unchanged..Details
kitchen and bath remodel in-kind for units: 10b, 16n, 286, 33t, and ph-6. no walls moved, added or in-filled. (e) layout to remain unchanged.. | $75,000 |
| Jun 9, 2017 | Completed final sign-off May 2018 | 690 Mission St | Holland Brooks Builders Inc | kitchen & bath remodel in-kind for units 7c, 37f, 27l, 23k, 37a. no walls moved, added or infill (e) layouts to remain unchanged. maher ord 155-13 naDetails
kitchen & bath remodel in-kind for units 7c, 37f, 27l, 23k, 37a. no walls moved, added or infill (e) layouts to remain unchanged. maher ord 155-13 na | $75,000 |
| Jun 9, 2017 | Completed final sign-off Dec 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen & bath remodel in-kind for units 35s, 31f, 16f, 35n, 38d. no walls moved, added or infill (e) layouts to remain unchanged. maher ord 155-13 naDetails
kitchen & bath remodel in-kind for units 35s, 31f, 16f, 35n, 38d. no walls moved, added or infill (e) layouts to remain unchanged. maher ord 155-13 na | $75,000 |
| Jun 9, 2017 | Completed final sign-off Oct 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen & bath remodel in-kind for units 16t, 7, 28t, 11s, 15g. no walls moved, added or infill (e) layouts to remain unchanged. all (e) layouts to remain unchanged. maher ord 155-13 naDetails
kitchen & bath remodel in-kind for units 16t, 7, 28t, 11s, 15g. no walls moved, added or infill (e) layouts to remain unchanged. all (e) layouts to remain unchanged. maher ord 155-13 na | $75,000 |
| Jun 9, 2017 | Completed final sign-off Sep 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen & bath remodel in-kind for units 29b, 33a, 34l, 39d, 26b. no walls moved, added or infill (e) layouts to remain unchanged. maher ord 155-13 naDetails
kitchen & bath remodel in-kind for units 29b, 33a, 34l, 39d, 26b. no walls moved, added or infill (e) layouts to remain unchanged. maher ord 155-13 na | $75,000 |
| Jun 8, 2017 | Completed final sign-off Jun 2017 | 680 Mission St | Interstate Restoration California Lp | remove and replace attached insulation & drywall on basement walls. water damaged drywall to be 5/8" typ x gwb. replace insulation in kind.Details
remove and replace attached insulation & drywall on basement walls. water damaged drywall to be 5/8" typ x gwb. replace insulation in kind. | $12,000 |
| May 22, 2017 | Completed final sign-off Jun 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen & bath remodel in-kind for units 15k, 28k, 29g, 37g, 41c; no walls moved/removed/added/infilled; all (e) layouts to remain unchanged.Details
kitchen & bath remodel in-kind for units 15k, 28k, 29g, 37g, 41c; no walls moved/removed/added/infilled; all (e) layouts to remain unchanged. | $75,000 |
| May 22, 2017 | Completed final sign-off Apr 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen & bath remodel in-kind for units 11k, 11p, 25b, 25n, 36d; no walls moved/removed/added/infilled; all (e) layouts to remain unchanged.Details
kitchen & bath remodel in-kind for units 11k, 11p, 25b, 25n, 36d; no walls moved/removed/added/infilled; all (e) layouts to remain unchanged. | $75,000 |
| May 22, 2017 | Completed final sign-off Apr 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen & bath remodel in-kind for units 14c, 18n, 18s, 22g, 36c; no walls moved/removed/added/infilled; all (e) layouts to remain unchanged.Details
kitchen & bath remodel in-kind for units 14c, 18n, 18s, 22g, 36c; no walls moved/removed/added/infilled; all (e) layouts to remain unchanged. | $75,000 |
| Apr 24, 2017 | Completed final sign-off Mar 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen cabinet & plumbing fixture & bathroom plumbing fixture, remodel in-kind for units: 26n, 29l, 25g, 30d, & 07e; no alteration of windows, walls/doors. maher ord 155-13 naDetails
kitchen cabinet & plumbing fixture & bathroom plumbing fixture, remodel in-kind for units: 26n, 29l, 25g, 30d, & 07e; no alteration of windows, walls/doors. maher ord 155-13 na | $75,000 |
| Apr 24, 2017 | Completed final sign-off Apr 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen cabinet & plumbing fixture & bathroom plumbing fixture, remodel in-kind for units: 11g, 35t, 34n, 14k, & 16b; no alteration of windows, walls/doors. maher ord 155-13 naDetails
kitchen cabinet & plumbing fixture & bathroom plumbing fixture, remodel in-kind for units: 11g, 35t, 34n, 14k, & 16b; no alteration of windows, walls/doors. maher ord 155-13 na | $75,000 |
| Apr 7, 2017 | Completed final sign-off Mar 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen & bath remodel in-kind for these units: 32n, 18e, 34d, phc, & 16kDetails
kitchen & bath remodel in-kind for these units: 32n, 18e, 34d, phc, & 16k | $75,000 |
| Apr 7, 2017 | Completed final sign-off Mar 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen & bath remodel in-kind for these units: 25k, 22f, 30p, 31t, & 17fDetails
kitchen & bath remodel in-kind for these units: 25k, 22f, 30p, 31t, & 17f | $75,000 |
| Mar 24, 2017 | Completed final sign-off Oct 2018 | 680 Mission St | Holland Brooks Builders Inc | 5 units a2g, 9j, 14b, 27n, and pha - kitchen & bath remodel 'in kind'Details
5 units a2g, 9j, 14b, 27n, and pha - kitchen & bath remodel 'in kind' | $75,000 |
| Feb 6, 2017 | Completed final sign-off Mar 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen and bath remodel "in kind" in five units: 9d, 14n, 14p, 27l, 35l. n/a maher ord. 155-13Details
kitchen and bath remodel "in kind" in five units: 9d, 14n, 14p, 27l, 35l. n/a maher ord. 155-13 | $75,000 |
| Feb 6, 2017 | Completed final sign-off Mar 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen and bath remodel "in kind" in five units: 14s, 25e, 34a, 34t and 37b. n/a maher ord. 155-13Details
kitchen and bath remodel "in kind" in five units: 14s, 25e, 34a, 34t and 37b. n/a maher ord. 155-13 | $75,000 |
| Feb 6, 2017 | Completed final sign-off Oct 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen and bath remodel "in kind" in five units: 15c, 22k, 25d, 29c and penthouse d. n/a maher ord. 155-13Details
kitchen and bath remodel "in kind" in five units: 15c, 22k, 25d, 29c and penthouse d. n/a maher ord. 155-13 | $75,000 |
| Feb 6, 2017 | Completed final sign-off Mar 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen and bath remodel "in kind" in five units: 30l, 31b, 35p, penthouse e, penthouse h. n/a maher ord. 155-13Details
kitchen and bath remodel "in kind" in five units: 30l, 31b, 35p, penthouse e, penthouse h. n/a maher ord. 155-13 | $75,000 |
| Feb 6, 2017 | Completed final sign-off Sep 2018 | 680 Mission St | Holland Brooks Builders Inc | kitchen and bath remodel "in kind" in five units: 17f, 26t, 33a, 34d and 34f n/a maher ord. 155-13Details
kitchen and bath remodel "in kind" in five units: 17f, 26t, 33a, 34d and 34f n/a maher ord. 155-13 | $75,000 |
| Jan 23, 2017 | Completed final sign-off Feb 2017 | 680 Mission St | Anderson, Rowe & Buckley, Inc. | ground flr: (e) fire sprinkler system ti - 24 relocate sprinklers 4 added. ref 201610120033Details
ground flr: (e) fire sprinkler system ti - 24 relocate sprinklers 4 added. ref 201610120033 | $6,800 |
| Jan 5, 2017 | Completed final sign-off Mar 2017 | 680 Mission St | Sabah International Incorporated | add 1 ceiling speaker/strobe, 1 wall speaker/strobe, 3 smoke detectors, 3 control relays, 3 interposing replays, relocate 1 wall speaker/strobe, 1 wall strobe, ti 2016-1012-0033Details
add 1 ceiling speaker/strobe, 1 wall speaker/strobe, 3 smoke detectors, 3 control relays, 3 interposing replays, relocate 1 wall speaker/strobe, 1 wall strobe, ti 2016-1012-0033 | $12,430 |
| Dec 28, 2016 | Completed final sign-off Aug 2018 | 167 Jessie St | Skender Construction Llc | ti- portion of 3rd & 4th flr including: a) tie into (e) bld systems for plumb, ele & hvac. b) construction of offices, storage space, meeting rooms, staff kitchenette. c) construct ada bathrooms. d) install ff&e ground floor entry & 3rd/4th flr offices maher naDetails
ti- portion of 3rd & 4th flr including: a) tie into (e) bld systems for plumb, ele & hvac. b) construction of offices, storage space, meeting rooms, staff kitchenette. c) construct ada bathrooms. d) install ff&e ground floor entry & 3rd/4th flr offices maher na | $950,000 |
| Nov 16, 2016 | Completed final sign-off Oct 2017 | 680 Mission St | Novo Construction Inc | temporary access area for lobby ti work under pa 201610120033: work on ground floor only - no exterior work - 90-days or less for this condition permit. maher naDetails
temporary access area for lobby ti work under pa 201610120033: work on ground floor only - no exterior work - 90-days or less for this condition permit. maher na | $15,000 |
| Oct 12, 2016 | Never finaled issued Nov 2016, no final | 680 Mission St | Novo Construction Inc | lobby renovation in an (e) high rise condominium building, new fixtures, finishes & elevator cab's finishes. n/a ordinance #155-13Details
lobby renovation in an (e) high rise condominium building, new fixtures, finishes & elevator cab's finishes. n/a ordinance #155-13 | $185,000 |
| Aug 9, 2016 | Completed final sign-off Oct 2016 | 680 Mission St | Reliable Commercial Services | work in unit 19b: kitchen remodel in kind and (n) cabinetry, fixtures.Details
work in unit 19b: kitchen remodel in kind and (n) cabinetry, fixtures. | $15,000 |
| Apr 28, 2016 | Never finaled issued May 2016, no final | 680 Mission St | Novo Construction Inc | administrative change of use for transfer of 10000 sq ft of extg office space from 3rd floor to 2nd floor, currently vacant small institutional use. 3rd floor changed to residential amenities space prevously approved under app#201408042914. misc repairs include temporary walls and bathroom upgrade.Details
administrative change of use for transfer of 10000 sq ft of extg office space from 3rd floor to 2nd floor, currently vacant small institutional use. 3rd floor changed to residential amenities space prevously approved under app#201408042914. misc repairs include temporary walls and bathroom upgrade. | $15,000 |
| Apr 21, 2015 | Never finaled issued May 2015, no final | 680 Mission St | Sabah International Incorporated | 3rd & 4th flrs: upgrade (e) fire alarms system for the added notification devices. the upgrade system shall include the following; add 1 new booster power supply, 9 new speaker/strobes. and 16 new strobes. maher - not req'dDetails
3rd & 4th flrs: upgrade (e) fire alarms system for the added notification devices. the upgrade system shall include the following; add 1 new booster power supply, 9 new speaker/strobes. and 16 new strobes. maher - not req'd | $12,875 |
| Apr 15, 2015 | Completed final sign-off Aug 2015 | 680 Mission St | Westates Mechanical Corporation Inc | 3rd & 4th flrs: fire sprinklers. maher - not req'd. 142 new heads, all quick-release flex heads. ref t.i. 2014-0804-2914.Details
3rd & 4th flrs: fire sprinklers. maher - not req'd. 142 new heads, all quick-release flex heads. ref t.i. 2014-0804-2914. | $73,130 |
| Apr 2, 2015 | Never finaled issued May 2015, no final | 680 Mission St | Novo Construction Inc | new connecting stair between 3rd and 4th floors. work includes penetration of slab floor and new steel frame and wood tread convenience stair. n/a for maher.Details
new connecting stair between 3rd and 4th floors. work includes penetration of slab floor and new steel frame and wood tread convenience stair. n/a for maher. | $80,000 |
| Dec 23, 2014 | Never finaled issued May 2015, no final | 680 Mission St | Novo Construction Inc | mep associated with 201408042914 all other work unde sep permit(maher ordinance extended #155-13 not required)Details
mep associated with 201408042914 all other work unde sep permit(maher ordinance extended #155-13 not required) | $600,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.