Barats Lee
- License
- E25033
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E25033 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Green Water And Power
- Based in
- Van Nuys
- On San Francisco permits
- Jan 2025 to Mar 2025
2 permits since 2000 (engineer on 2 permits): 1 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Green Water And Power (2)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 25, 2025 | In progress issued May 2025 | 450 Folsom St | Green Water And Power | installation of 40 level 2 electrical vehicle charges in both existing and proposed locations of subterraniean valet, & self park areas. install (1) subpanel. install of all required conduit and conductors to connect proposed ev charging system to (e) electrical service.Details
installation of 40 level 2 electrical vehicle charges in both existing and proposed locations of subterraniean valet, & self park areas. install (1) subpanel. install of all required conduit and conductors to connect proposed ev charging system to (e) electrical service. | $45,000 |
| Jan 2, 2025 | Completed final sign-off Oct 2025 | 680 Mission St | Green Water And Power | installation of 40 level 2 electric vehicle chargers in valet area of parking garage. installation of 1 sub panel. installation of all required conduit and conductors to connect proposed ev charging system to existing electrical service.Details
installation of 40 level 2 electric vehicle chargers in valet area of parking garage. installation of 1 sub panel. installation of all required conduit and conductors to connect proposed ev charging system to existing electrical service. | $45,000 |