Permit GraphShortlistSan Francisco building permits since 2000

Barats Lee

License
E25033
Electrical engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up E25033 at the Board for Professional Engineers
Listed as
engineer
Firm
Green Water And Power
Based in
Van Nuys
On San Francisco permits
Jan 2025 to Mar 2025

2 permits since 2000 (engineer on 2 permits): 1 completed, 1 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Green Water And Power (2)

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 25, 2025In progress
issued May 2025
450 Folsom StGreen Water And Powerinstallation of 40 level 2 electrical vehicle charges in both existing and proposed locations of subterraniean valet, & self park areas. install (1) subpanel. install of all required conduit and conductors to connect proposed ev charging system to (e) electrical service.
Details
Permit
202411255632
Permit issued
May 20, 2025

installation of 40 level 2 electrical vehicle charges in both existing and proposed locations of subterraniean valet, & self park areas. install (1) subpanel. install of all required conduit and conductors to connect proposed ev charging system to (e) electrical service.

Open the permit page

$45,000
Jan 2, 2025Completed
final sign-off Oct 2025
680 Mission StGreen Water And Powerinstallation of 40 level 2 electric vehicle chargers in valet area of parking garage. installation of 1 sub panel. installation of all required conduit and conductors to connect proposed ev charging system to existing electrical service.
Details
Permit
202412025887
Permit issued
Jul 25, 2025
Final sign-off
Oct 28, 2025

installation of 40 level 2 electric vehicle chargers in valet area of parking garage. installation of 1 sub panel. installation of all required conduit and conductors to connect proposed ev charging system to existing electrical service.

Open the permit page

$45,000