Ronald Mark Radziner
- License
- C22228
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C22228 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Marmol Radziner & Assoc
- Based in
- Los Angeles
- On San Francisco permits
- Apr 2009 to Oct 2026
10 permits since 2000 (architect on 9 permits, engineer on 1 permit): 3 completed, 3 in progress, 4 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Forma Construction (3), Novo Construction Inc (3), Paul Ryan Associates (2), M C S Construction Services, Marmol Radziner Arch Corp, Sajo, Inc.
- Pmt consultant/expediters
- Southwest Sign Co.
Where they worked
- Single-family 5
- Multi-family (2-family, apartments) 0
- Commercial 5
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 20, 2026 | In progress issued Nov 2026 | 2707 Larkin St | Forma Construction | revision to pa #202510167563. to revise sport court structural details based on field investigations during construction.Details
revision to pa #202510167563. to revise sport court structural details based on field investigations during construction. | |
| Dec 12, 2025 | In progress issued Jan 2026 | 2707 Larkin St | Forma Construction | rear yard landscaping remodel | $35,000 |
| Oct 16, 2025 | In progress issued Feb 2026 | 2707 Larkin St | Forma Construction | remodel and small addition to den and bedroom on ground floor.Details
remodel and small addition to den and bedroom on ground floor. | $196,000 |
| Sep 12, 2022 | Completed final sign-off Sep 2023 | 415 Natoma St | M C S Construction Services | 14th fl: tenant improvement consisting of non-rated full height partitions, huddle rooms, refreshments, boardroom, lounge, conference rooms, respite. deferred mep/life safety.Details
14th fl: tenant improvement consisting of non-rated full height partitions, huddle rooms, refreshments, boardroom, lounge, conference rooms, respite. deferred mep/life safety. | $1,153,950 |
| Apr 2, 2015 | Never finaled issued May 2015, no final | 680 Mission St | Novo Construction Inc | new connecting stair between 3rd and 4th floors. work includes penetration of slab floor and new steel frame and wood tread convenience stair. n/a for maher.Details
new connecting stair between 3rd and 4th floors. work includes penetration of slab floor and new steel frame and wood tread convenience stair. n/a for maher. | $80,000 |
| Dec 23, 2014 | Never finaled issued May 2015, no final | 680 Mission St | Novo Construction Inc | mep associated with 201408042914 all other work unde sep permit(maher ordinance extended #155-13 not required)Details
mep associated with 201408042914 all other work unde sep permit(maher ordinance extended #155-13 not required) | $600,000 |
| Oct 17, 2014 | Never finaled issued Sep 2015, no final | 2798 Broadway | Paul Ryan Associates | enlarge window on north facadeDetails
enlarge window on north facade | $3,500 |
| Aug 4, 2014 | Never finaled issued Jan 2015, no final | 680 Mission St | Marmol Radziner Arch Corp, Novo Construction Inc | t.i. on 3rd & 4th flr office & pool areas. work includes (n) partitions, fixtures, finishes. mep & fire protection under separate permits.Details
t.i. on 3rd & 4th flr office & pool areas. work includes (n) partitions, fixtures, finishes. mep & fire protection under separate permits. | $3,000,000 |
| Dec 21, 2012 | Completed final sign-off Oct 2015 | 2798 Broadway | Paul Ryan Associates | expansion of habitable area into existing crawl space below and within existing structure; no expansion of bldg footprint height. new windows to match existing.Details
expansion of habitable area into existing crawl space below and within existing structure; no expansion of bldg footprint height. new windows to match existing. | $320,000 |
| Apr 21, 2009 | Completed final sign-off Jan 2010 | 36 Geary St | Sajo, Inc. | ground floor interior reconfiguration of retail space and mezzanine. mechanical & electrical under separate permit.Details
ground floor interior reconfiguration of retail space and mezzanine. mechanical & electrical under separate permit. | $300,000 |