Block 0792, lot 007E
355 Fulton St
- City’s use
- Multi-Family Residential
- Built
- 1926
- Stories
- 5
- Units
- 40
- Rooms
- 40 bedrooms, 40 bathrooms
- Building
- 24,428 sq ft
- Lot
- 8,044 sq ft
- Zoning
- NC3
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
56 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 21, 2024 | Completed final sign-off Mar 2025 | 355 Fulton St | Tip Managers Inc | uint 303: renovation of 1 apartment unit 303 2nd level, new kitchen cabinets and plumbing fixtures. new washer dryer. new lighting at e) j boxes. no change to mech. no exterior work, or fire alarm or sprinkler work. no structural work.Details
uint 303: renovation of 1 apartment unit 303 2nd level, new kitchen cabinets and plumbing fixtures. new washer dryer. new lighting at e) j boxes. no change to mech. no exterior work, or fire alarm or sprinkler work. no structural work. | $65,000 |
| Aug 26, 2022 | Never finaled issued Sep 2022, no final | 355 Fulton St | remove (8) (e) non fire rated interior doors in the building common areas and replace w/new fire rated doors.Details
remove (8) (e) non fire rated interior doors in the building common areas and replace w/new fire rated doors. | $8,000 | |
| Nov 23, 2021 | Completed final sign-off Mar 2022 | 355 Fulton St | Axel8 Construction | unit 505 - rehab (e) kitchen and bathroom; install washer/dryer. no removal of structural wallsDetails
unit 505 - rehab (e) kitchen and bathroom; install washer/dryer. no removal of structural walls | $26,000 |
| Nov 18, 2020 | Never finaled issued Nov 2020, no final | 355 Fulton St | Aguilera Construction Company | remove and replace kitchen cabinets same location in kind approx 110 sqftDetails
remove and replace kitchen cabinets same location in kind approx 110 sqft | $5,000 |
| Feb 6, 2020 | Never finaled issued Feb 2020, no final | 355 Fulton St | B-Side Inc. | #504: rehab kitchen, (e) replace washer/dryer combo. no structural work. no moving walls. kitchen sink 10 by 8.Details
#504: rehab kitchen, (e) replace washer/dryer combo. no structural work. no moving walls. kitchen sink 10 by 8. | $15,000 |
| Jan 27, 2020 | Never finaled issued Jan 2020, no final | 355 Fulton St | streetspaceDetails
streetspace | ||
| Dec 19, 2019 | Never finaled issued Jan 2020, no final | 355 Fulton St | B-Side Inc. | unit 210 - convert (e) kitchen to bedroom; relocate kitchen; rehabilitate (e) bathroom and install washer & dryerDetails
unit 210 - convert (e) kitchen to bedroom; relocate kitchen; rehabilitate (e) bathroom and install washer & dryer | $40,000 |
| Nov 4, 2019 | Never finaled issued Nov 2019, no final | 355 Fulton St | B-Side Inc. | #309: convert existing kitchen to bedroom, re-locate kitchen, rehabilitate existing bathroom, install washer & dryer.Details
#309: convert existing kitchen to bedroom, re-locate kitchen, rehabilitate existing bathroom, install washer & dryer. | $38,000 |
| Nov 4, 2019 | Never finaled issued Nov 2019, no final | 355 Fulton St | B-Side Inc. | apt #308: convert existing kitchen to bedroom, re-locate kitchen, rehabilitate existing bathroom, install washer & dryer. maher n/a.Details
apt #308: convert existing kitchen to bedroom, re-locate kitchen, rehabilitate existing bathroom, install washer & dryer. maher n/a. | $38,000 |
| Nov 4, 2019 | Never finaled issued Nov 2019, no final | 355 Fulton St | B-Side Inc. | #209: convert existing kitchen to bedroom, re-locate kitchen, rehabilitate existing bathroom, install washer & dryer.Details
#209: convert existing kitchen to bedroom, re-locate kitchen, rehabilitate existing bathroom, install washer & dryer. | $38,000 |
| Oct 8, 2019 | Never finaled issued Oct 2019, no final | 355 Fulton St | street spaceDetails
street space | ||
| Sep 30, 2019 | Completed final sign-off Dec 2019 | 355 Fulton St | B-Side Inc. | all work in unit # 405: rehab existing kitchen and bathroom. upgrade washer/dryer "ventless" in existing closet. replace kitchen hood in kind. lighing shall be h.e provide vacancy sensor in bahtroom.Details
all work in unit # 405: rehab existing kitchen and bathroom. upgrade washer/dryer "ventless" in existing closet. replace kitchen hood in kind. lighing shall be h.e provide vacancy sensor in bahtroom. | $25,000 |
| Aug 19, 2019 | Completed final sign-off Dec 2019 | 355 Fulton St | B-Side Inc. | #501: remodel (e) 8' x 6' bathroom remodel, ~10' x 12' (e) kitchen. provide the new line to (e) washer/dryer. no structural work. no modification to bearing walls.Details
#501: remodel (e) 8' x 6' bathroom remodel, ~10' x 12' (e) kitchen. provide the new line to (e) washer/dryer. no structural work. no modification to bearing walls. | $25,000 |
| Aug 19, 2019 | Completed final sign-off Dec 2019 | 355 Fulton St | B-Side Inc. | #201: remodel (e) 8' x 6' bathroom remodel, ~10' x 12' (e) kitchen. (e) washer/dryer. no structural work. no modification to bearing walls.Details
#201: remodel (e) 8' x 6' bathroom remodel, ~10' x 12' (e) kitchen. (e) washer/dryer. no structural work. no modification to bearing walls. | $25,000 |
| Jul 31, 2019 | Never finaled issued Jul 2019, no final | 355 Fulton St | street spaceDetails
street space | ||
| Jul 17, 2019 | Never finaled issued Jul 2019, no final | 355 Fulton St | B-Side Inc. | apt 407: install ventless dryer & 220v washer in (e) closet. no alt of walls.Details
apt 407: install ventless dryer & 220v washer in (e) closet. no alt of walls. | $5,000 |
| Jul 9, 2019 | Expired or cancelled cancelled Jul 2019 | 355 Fulton St | B-Side Inc. | unit 505: install hook up for new washer and dryer in unit 505. no structuralDetails
unit 505: install hook up for new washer and dryer in unit 505. no structural | $5,000 |
| Jul 9, 2019 | Never finaled issued Jul 2019, no final | 355 Fulton St | B-Side Inc. | new hookups for washer and dryer in unit #302. no structuralDetails
new hookups for washer and dryer in unit #302. no structural | $5,000 |
| Jul 9, 2019 | Never finaled issued Jul 2019, no final | 355 Fulton St | B-Side Inc. | new hookups for washer and dryer in unit #206. no structuralDetails
new hookups for washer and dryer in unit #206. no structural | $5,000 |
| May 28, 2019 | Never finaled issued May 2019, no final | 355 Fulton St | street spaceDetails
street space | ||
| May 16, 2019 | Completed final sign-off Dec 2019 | 355 Fulton St | Wickman Development And Construction | unit# 310: to comply with nov # 201776211 dated 5/5/2017. repair rear concrete wall at bay window at unit # 310 and weatherize the area per nov. repair in-kind, less than 50%Details
unit# 310: to comply with nov # 201776211 dated 5/5/2017. repair rear concrete wall at bay window at unit # 310 and weatherize the area per nov. repair in-kind, less than 50% | $5,000 |
| May 16, 2019 | Completed final sign-off Nov 2019 | 355 Fulton St | Wickman Development And Construction | revision to app#201807033692 to provide opening at garage level align with above. n/a for maherDetails
revision to app#201807033692 to provide opening at garage level align with above. n/a for maher | |
| Mar 29, 2019 | Expired or cancelled cancelled Apr 2019 | 355 Fulton St | B-Side Inc. | unit 502. install ventless washer / dryer in (e) closet. all electrical.Details
unit 502. install ventless washer / dryer in (e) closet. all electrical. | $4,000 |
| Mar 18, 2019 | Completed final sign-off Apr 2019 | 355 Fulton St | Wickman Development And Construction | concrete is spaulding on the beam chip away loose concrete and patch and repair with hi stregenth mortarDetails
concrete is spaulding on the beam chip away loose concrete and patch and repair with hi stregenth mortar | $10,500 |
| Jul 3, 2018 | Completed final sign-off Nov 2019 | 355 Fulton St | Wickman Development And Construction | repair rear elevations deteriorating concrete wall. proposed work is to remove bay windows & provide a (n) flat concrete wall across the entire rear facade. to comply with nov #201775772 number 2. **maher n/a**Details
repair rear elevations deteriorating concrete wall. proposed work is to remove bay windows & provide a (n) flat concrete wall across the entire rear facade. to comply with nov #201775772 number 2. **maher n/a** | $80,000 |
| Nov 21, 2017 | Completed final sign-off Apr 2018 | 355 Fulton St | Palmera Construction Co | unit 307 - rehabilitate (e) kitchen, rehabilitate (e) bathroom, install washer & dryer. n/a maher ordinanceDetails
unit 307 - rehabilitate (e) kitchen, rehabilitate (e) bathroom, install washer & dryer. n/a maher ordinance | $28,000 |
| Oct 23, 2017 | Never finaled issued Oct 2017, no final | 355 Fulton St | street spaceDetails
street space | ||
| Oct 13, 2017 | Never finaled issued Oct 2017, no final | 355 Fulton St | Kendall James Seffer Smith | to comply with nov 201775772 spall repair at concrete wall and window trim replacement, not visible from streetDetails
to comply with nov 201775772 spall repair at concrete wall and window trim replacement, not visible from street | $25,000 |
| Jun 30, 2017 | Never finaled issued Jun 2017, no final | 355 Fulton St | street spaceDetails
street space | ||
| Jun 8, 2017 | Never finaled issued Jun 2017, no final | 355 Fulton St | work related to water intrusion into units. scope includes interior demo/remediation along exterior wall. interior repairs to comply with nov #s: 201759536, item #3 & #4 and 201775772, item #2Details
work related to water intrusion into units. scope includes interior demo/remediation along exterior wall. interior repairs to comply with nov #s: 201759536, item #3 & #4 and 201775772, item #2 | $30,000 | |
| Apr 10, 2015 | Never finaled issued Apr 2015, no final | 355 Fulton St | Kwan Wo Ironworks Inc | unit #403 - add washer & dryer, remodel kitchen in kind. n/a maher ordinanceDetails
unit #403 - add washer & dryer, remodel kitchen in kind. n/a maher ordinance | $10,000 |
| Apr 10, 2015 | Never finaled issued Apr 2015, no final | 355 Fulton St | Kwan Wo Ironworks Inc | unit #207 - add washer & dryer, remodel kitchen in kind. n/a maher ordinanceDetails
unit #207 - add washer & dryer, remodel kitchen in kind. n/a maher ordinance | $10,000 |
| Feb 18, 2015 | Completed final sign-off Jun 2015 | 355 Fulton St | Kwan Wo Ironworks Inc | unit #304 - add new wash & dryer, remodle kitchen in kind. n/a maher ordinanceDetails
unit #304 - add new wash & dryer, remodle kitchen in kind. n/a maher ordinance | $9,000 |
| Sep 19, 2014 | Never finaled issued Sep 2014, no final | 355 Fulton St | Construction Depot Inc | # 407: bath remodel- replace tub, toilet, dedestal sink. install new tile surround. replace 7 light fixtures. n/a maher ordinance # 155-13Details
# 407: bath remodel- replace tub, toilet, dedestal sink. install new tile surround. replace 7 light fixtures. n/a maher ordinance # 155-13 | $10,000 |
| Aug 13, 2014 | Never finaled issued Aug 2014, no final | 355 Fulton St | B-Side Inc. | unit #206 only - remove/add interior non-bearing walls, remodel kitchen & bath, lighting to modified spaces.Details
unit #206 only - remove/add interior non-bearing walls, remodel kitchen & bath, lighting to modified spaces. | $30,000 |
| Nov 7, 2013 | Completed final sign-off Jan 2014 | 355 Fulton St | B-Side Inc. | unit #310-relocating of kitchen fixtures & cabinets. remodeling of bathroom. upgrade of electrical & plumbing fixtures. re-routing of electrical wires & plumbing as neededDetails
unit #310-relocating of kitchen fixtures & cabinets. remodeling of bathroom. upgrade of electrical & plumbing fixtures. re-routing of electrical wires & plumbing as needed | $20,000 |
| Apr 30, 2013 | Completed final sign-off Jun 2013 | 355 Fulton St | Arcon Construction Corp | unit # 302: painting and cabinet workDetails
unit # 302: painting and cabinet work | $6,000 |
| Dec 6, 2012 | Completed final sign-off Mar 2013 | 355 Fulton St | Arcon Construction Corp | bath remodel studio unit, relocate kitchen and bedroom, add laundry rm. no structural walls to be removed. no exterior work.Details
bath remodel studio unit, relocate kitchen and bedroom, add laundry rm. no structural walls to be removed. no exterior work. | $18,000 |
| Dec 6, 2012 | Completed final sign-off Mar 2013 | 355 Fulton St | Arcon Construction Corp | revision to 201211134071.change layout of unit, relocate kitchen. lighting to comply with cec 150(k)Details
revision to 201211134071.change layout of unit, relocate kitchen. lighting to comply with cec 150(k) | $3,000 |
| Dec 6, 2012 | Never finaled issued Dec 2012, no final | 355 Fulton St | Arcon Construction Corp | revision to 201211134072. relocate kitchenDetails
revision to 201211134072. relocate kitchen | $3,000 |
| Dec 6, 2012 | Completed final sign-off Mar 2013 | 355 Fulton St | Arcon Construction Corp | bath remodel, relocate kitchen in studio unit 204. no structural or exterior work. create bedroom and laundry roomDetails
bath remodel, relocate kitchen in studio unit 204. no structural or exterior work. create bedroom and laundry room | $18,000 |
| Nov 16, 2012 | Completed final sign-off Dec 2012 | 355 Fulton St | Arcon Construction Corp | #501, #502, #504- comply with nov #200854271 renew pa#200805192358 for final inspection.Details
#501, #502, #504- comply with nov #200854271 renew pa#200805192358 for final inspection. | |
| Nov 16, 2012 | Completed final sign-off Dec 2012 | 355 Fulton St | Arcon Construction Corp | #407- renew pa#200807156714 for final inspection.Details
#407- renew pa#200807156714 for final inspection. | |
| Nov 16, 2012 | Completed final sign-off Dec 2012 | 355 Fulton St | Arcon Construction Corp | #208, #309, #405- comply with nov#2008542715 renew pa#200807156716 for final inspection.Details
#208, #309, #405- comply with nov#2008542715 renew pa#200807156716 for final inspection. | |
| Nov 16, 2012 | Completed final sign-off Dec 2012 | 355 Fulton St | Arcon Construction Corp | #204, #209, #304, #306, #307, #308, #406- comply with nov #2008542715 renew pa#200805192361 for final inspection.Details
#204, #209, #304, #306, #307, #308, #406- comply with nov #2008542715 renew pa#200805192361 for final inspection. | |
| Nov 16, 2012 | Completed final sign-off Dec 2012 | 355 Fulton St | Arcon Construction Corp | #506- comply with nov #200666475 renew pa#200603146588 for final inspection.Details
#506- comply with nov #200666475 renew pa#200603146588 for final inspection. | |
| Nov 13, 2012 | Expired or cancelled expired Feb 2014 | 355 Fulton St | Arcon Construction Corp | remodel existing kitchen, bathroom, add new laundry. no structural walls to be removed, no exterior work.Details
remodel existing kitchen, bathroom, add new laundry. no structural walls to be removed, no exterior work. | $18,000 |
| Nov 13, 2012 | Completed final sign-off Mar 2013 | 355 Fulton St | Arcon Construction Corp | remodel existing kitchen, bathroom, add new laundry. no structural walls to be removed, no exterior work.Details
remodel existing kitchen, bathroom, add new laundry. no structural walls to be removed, no exterior work. | $18,000 |
| Jul 27, 2012 | Completed final sign-off Aug 2012 | 355 Fulton St | D3 Construction | comply with nov# 200859850-units #208/309/405-expose walls in kitchen & bathroom if required for inspection in units #208, 309, 405. re-sheetrock, prime, paint. legalize all kitchens & bathrooms with this permitDetails
comply with nov# 200859850-units #208/309/405-expose walls in kitchen & bathroom if required for inspection in units #208, 309, 405. re-sheetrock, prime, paint. legalize all kitchens & bathrooms with this permit | $2,000 |
| Jul 15, 2008 | Never finaled issued Jul 2008, no final | 355 Fulton St | F B E And Sons General Const | apt#407. kitchen and bathroom remodel. no structural work-no lighting work. remove and replace kitchen cabinet, counter floor and wall tile.Details
apt#407. kitchen and bathroom remodel. no structural work-no lighting work. remove and replace kitchen cabinet, counter floor and wall tile. | $15,000 |
| Jul 15, 2008 | Never finaled issued Jul 2008, no final | 355 Fulton St | F B E And Sons General Const | apt#208,309,#405. comply with nov.#200859850 and #200851811. kitchen and bathroom remodel, non structural work. no lighting work.Details
apt#208,309,#405. comply with nov.#200859850 and #200851811. kitchen and bathroom remodel, non structural work. no lighting work. | $35,000 |
| May 19, 2008 | Never finaled issued May 2008, no final | 355 Fulton St | F B E And Sons General Const | work @ apt# 501, # 502 & #504. to comply with nov# 200854271. kitchen & bathroom remodel. his nov# 200851811. no lighting changes. no structural.Details
work @ apt# 501, # 502 & #504. to comply with nov# 200854271. kitchen & bathroom remodel. his nov# 200851811. no lighting changes. no structural. | $42,000 |
| May 19, 2008 | Never finaled issued May 2008, no final | 355 Fulton St | F B E And Sons General Const | work @ apt# 204, # 209, # 304, # 306, # 307, # 308 & # 406. to comply with nov# 200854271. bathroom remodel. 7 bathroom. his nov# 200851811. no lighting changes. no structural.Details
work @ apt# 204, # 209, # 304, # 306, # 307, # 308 & # 406. to comply with nov# 200854271. bathroom remodel. 7 bathroom. his nov# 200851811. no lighting changes. no structural. | $45,000 |
| Mar 14, 2006 | Never finaled issued Mar 2006, no final | 355 Fulton St | On-Site Maintenance | correction for notice of violation complaint#200666475.no other work, remove caps of light bulbs, remove shed roofs on lightwell.Details
correction for notice of violation complaint#200666475.no other work, remove caps of light bulbs, remove shed roofs on lightwell. | $2,500 |
| Mar 4, 2002 | Completed final sign-off Jan 2003 | 355 Fulton St | to correct record to reflect 41 existing units not 40 based upon assessors record any permitsDetails
to correct record to reflect 41 existing units not 40 based upon assessors record any permits | $100 | |
| Oct 12, 2001 | Expired or cancelled expired Apr 2002 | 355 Fulton St | Qse Construction | repair existing concrete spalling of chimney stack by rmoveing & replacing bad concrete w/ new concrDetails
repair existing concrete spalling of chimney stack by rmoveing & replacing bad concrete w/ new concr | $10,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- B-Side Inc. (15), Arcon Construction Corp (12), F B E And Sons General Const (4), Wickman Development And Construction (4), Kwan Wo Ironworks Inc (3), Aguilera Construction Company, Axel8 Construction, Construction Depot Inc, D3 Construction, Kendall James Seffer Smith, On-Site Maintenance, Palmera Construction Co, Qse Construction, Tip Managers Inc
- Architects
- Jacob Herczeg, Nathan C. Simpson
- Engineers
- Jefferson Chen (3), Daniel Barringer, Joe Kon, Joe Win Kon, William E. Tremayne
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.