Block 1073, lot 017
2737 Sutter St
- City’s use
- Multi-Family Residential
- Built
- 1905
- Stories
- 3
- Units
- 13
- Rooms
- 25 bedrooms, 18 bathrooms
- Building
- 10,191 sq ft
- Lot
- 6,030 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
24 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 30, 2021 | Completed final sign-off Mar 2022 | 2737 Sutter St | Markoff Structural Pest Control | termite report # 18154 3/23/2018 & supp report 11/11/21 item #'s 1,3,4,5 supp repor #1, repair termite and dryrot damageDetails
termite report # 18154 3/23/2018 & supp report 11/11/21 item #'s 1,3,4,5 supp repor #1, repair termite and dryrot damage | $35,000 |
| Dec 18, 2019 | Completed final sign-off Apr 2021 | 2737 Sutter St | Hue & Cry Security System | upgrade of extg fire alarm system with additions of wireless low frequency sounders in all sleeping areas to meet code 1103.7.6.1Details
upgrade of extg fire alarm system with additions of wireless low frequency sounders in all sleeping areas to meet code 1103.7.6.1 | $58,971 |
| Jul 15, 2019 | Completed final sign-off Sep 2019 | 2737 Sutter St | Qse Construction | the rear wall of his extg bldg soft story app#201810123089 has termit damage that is to be repaired here for the safety of tenants.Details
the rear wall of his extg bldg soft story app#201810123089 has termit damage that is to be repaired here for the safety of tenants. | $5,000 |
| Jul 12, 2019 | Never finaled issued Jul 2019, no final | 2737 Sutter St | street spaceDetails
street space | ||
| Jun 11, 2019 | Never finaled issued Jun 2019, no final | 2737 Sutter St | street spaceDetails
street space | ||
| Jan 14, 2019 | Completed final sign-off Feb 2019 | 2737 Sutter St | Holland Brooks Builders Inc | apt 3: rev to pa201810011869. open bathroom wall to lcoate gas line. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged.Details
apt 3: rev to pa201810011869. open bathroom wall to lcoate gas line. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. | $750 |
| Oct 12, 2018 | Completed final sign-off Oct 2019 | 2737 Sutter St | seismic retrofit using iebc a4. retrofit work is performed at the first floorDetails
seismic retrofit using iebc a4. retrofit work is performed at the first floor | $80,000 | |
| Oct 1, 2018 | Completed final sign-off Feb 2019 | 2737 Sutter St | Holland Brooks Builders Inc | install new washer and dryer. all work in unit # 3Details
install new washer and dryer. all work in unit # 3 | $17,800 |
| Jun 6, 2018 | Completed final sign-off Jun 2018 | 2737 Sutter St | Euro Team Construction | unit 8: to comply with complaint #201843176 dated 3/2/2018, install (3) new steam radiators in unit 8, steam pipe relocation where needed; relocate power oulets behind radiator to new location, open floor for pipe insulation, items 2 & 3.Details
unit 8: to comply with complaint #201843176 dated 3/2/2018, install (3) new steam radiators in unit 8, steam pipe relocation where needed; relocate power oulets behind radiator to new location, open floor for pipe insulation, items 2 & 3. | $6,000 |
| Jun 15, 2015 | Completed final sign-off Jun 2015 | 2737 Sutter St | Make Ready Maintenance Inc | revision to app#201406107987 to add plans to unit #3 and #11. to remodel kitchen and bathroom in unit 3 and 11Details
revision to app#201406107987 to add plans to unit #3 and #11. to remodel kitchen and bathroom in unit 3 and 11 | $24,000 |
| Nov 13, 2014 | Completed final sign-off Jun 2015 | 2737 Sutter St | Make Ready Maintenance Inc | unit 5 - remodel kitchen and bath4room with like fixtures ; to comply with cec150.0(k) 3&5Details
unit 5 - remodel kitchen and bath4room with like fixtures ; to comply with cec150.0(k) 3&5 | $20,000 |
| Nov 13, 2014 | Completed final sign-off Jun 2015 | 2737 Sutter St | Make Ready Maintenance Inc | unit 2 - remodel kitchen and bathroom with like fixtures; ;to comply with cec150>09k)3 & 5Details
unit 2 - remodel kitchen and bathroom with like fixtures; ;to comply with cec150>09k)3 & 5 | $20,000 |
| Jun 10, 2014 | Completed final sign-off Jun 2015 | 2737 Sutter St | Make Ready Maintenance Inc | unit #3,8,11 - kitchen & bathroom remodelDetails
unit #3,8,11 - kitchen & bathroom remodel | $20,000 |
| Mar 7, 2014 | Completed final sign-off May 2014 | 2737 Sutter St | Apex Construction & Maintenance Inc. | replace 2 new washer and dryer in existing laundry room, add one floor drain in basement area comply with 200451428,201345131Details
replace 2 new washer and dryer in existing laundry room, add one floor drain in basement area comply with 200451428,201345131 | $2,000 |
| Dec 24, 2013 | Completed final sign-off Apr 2014 | 2737 Sutter St | Mashal Builders & Contractors Inc | work in unit #4: revision to 201311010955: remove old plaster off walls and replace with sheetrock and add insulation in walls. no new partitions on this permit.Details
work in unit #4: revision to 201311010955: remove old plaster off walls and replace with sheetrock and add insulation in walls. no new partitions on this permit. | $15,000 |
| Nov 1, 2013 | Completed final sign-off Apr 2014 | 2737 Sutter St | Mashal Builders & Contractors Inc | #4- to complete work and obtain final inspection for work approved under pa#200705111098.Details
#4- to complete work and obtain final inspection for work approved under pa#200705111098. | $15,000 |
| Nov 1, 2013 | Completed final sign-off Apr 2014 | 2737 Sutter St | Mashal Builders & Contractors Inc | #13- kitchen & bath remodeling to comply with title 24 lights in bathroom and kitchen. rewire all eelctric for units, new sheetrock, new doors.Details
#13- kitchen & bath remodeling to comply with title 24 lights in bathroom and kitchen. rewire all eelctric for units, new sheetrock, new doors. | $20,000 |
| Jul 16, 2013 | Completed final sign-off Apr 2014 | 2737 Sutter St | Randomity Construction | comply with notice of violation complaint # 201297936. repair rear dry rotted stair less than 50% in-kind, not visible from street. work to include: rotted landing joist support, rotted landing handrails, rotted stringer and rotted handrail at stair.Details
comply with notice of violation complaint # 201297936. repair rear dry rotted stair less than 50% in-kind, not visible from street. work to include: rotted landing joist support, rotted landing handrails, rotted stringer and rotted handrail at stair. | $750 |
| Jun 6, 2013 | Completed final sign-off Apr 2014 | 2737 Sutter St | Architectural Fenestration & Restoration | replace existing windows - all non-visible from street with new vinyl framed windows in same kind/like/type. double hung units 49 windows. to comply w/his nov#201297936, item #2 only.Details
replace existing windows - all non-visible from street with new vinyl framed windows in same kind/like/type. double hung units 49 windows. to comply w/his nov#201297936, item #2 only. | $17,500 |
| Jun 5, 2013 | Completed final sign-off Oct 2013 | 2737 Sutter St | Mashal Builders & Contractors Inc | work in unit #7: kitchen and bath remodeling to comply with nov 3200797296. 201297936 to be obtained at a later day.Details
work in unit #7: kitchen and bath remodeling to comply with nov 3200797296. 201297936 to be obtained at a later day. | $12,000 |
| Apr 3, 2013 | Completed final sign-off Apr 2013 | 2737 Sutter St | Lovett & Lovett Roofing Co Inc | reroofingDetails
reroofing | $22,500 |
| Jun 6, 2012 | Completed final sign-off Jun 2012 | 2737 Sutter St | repair rear staris / dryrot replace w/exact design (same). replace rotted step (1) & (1) riser & (1) stringer - in kind.Details
repair rear staris / dryrot replace w/exact design (same). replace rotted step (1) & (1) riser & (1) stringer - in kind. | $750 | |
| May 11, 2007 | Never finaled issued May 2007, no final | 2737 Sutter St | remodel kitchen & bathroom. new cabinets and fixtures to comply w/nov#200797296.Details
remodel kitchen & bathroom. new cabinets and fixtures to comply w/nov#200797296. | $7,000 | |
| Nov 4, 2003 | Completed final sign-off Feb 2004 | 2737 Sutter St | comply w/n.o.v. dated 09/11/03 #200342862. #9 line walls with 26 galvanized sheet metal. convert (e)Details
comply w/n.o.v. dated 09/11/03 #200342862. #9 line walls with 26 galvanized sheet metal. convert (e) | $2,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.