Euro Team Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2017 to Feb 2026
- Last 24 months
- 11 permits filed
47 permits since 2000: 33 completed, 10 in progress, 4 never finaled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 6, 2026 | In progress issued Feb 2026 | 1332 10th Av | unit #302 - in kind bathroom remodel, like for like. relocate electrical subpanel from inside bedroom closet to bedroom.Details
unit #302 - in kind bathroom remodel, like for like. relocate electrical subpanel from inside bedroom closet to bedroom. | $16,000 |
| Nov 24, 2025 | Completed final sign-off Apr 2026 | 70 Laidley St | two garage doors replacement like for likeDetails
two garage doors replacement like for like | $6,200 |
| Sep 19, 2025 | In progress issued Sep 2025 | 455 Euclid Av | new 3-ply stucco installation on the back of the building at driveway are approximately 1200 square feet. like for like materials.Details
new 3-ply stucco installation on the back of the building at driveway are approximately 1200 square feet. like for like materials. | $12,000 |
| Sep 4, 2025 | In progress issued Sep 2025 | 381 Dellbrook Av | new 3-ply stucco installation on the left and right slab of the house. street visible.Details
new 3-ply stucco installation on the left and right slab of the house. street visible. | $12,500 |
| Jul 11, 2025 | Completed final sign-off Sep 2025 | 4348 23rd St | remove and dispose concrete at garage door floor 17'x17' and 12'x5'. install rebars #4 at 16" o.c. pour back with standard concrete mix 3000 psi 5" concrete thickness, crack control joints like for like.Details
remove and dispose concrete at garage door floor 17'x17' and 12'x5'. install rebars #4 at 16" o.c. pour back with standard concrete mix 3000 psi 5" concrete thickness, crack control joints like for like. | $12,000 |
| May 2, 2025 | Completed final sign-off May 2025 | 1407 Larkin St | to obtain final inspection for work approved under pa# 201801128588. all work is complete.Details
to obtain final inspection for work approved under pa# 201801128588. all work is complete. | |
| Feb 14, 2025 | Completed final sign-off Apr 2025 | 265 Wawona St | garage door replacement. same size and materials. no rough opening changes. provide 2 number of 100 sq. in. minimuym openings at garage door for ventilation.Details
garage door replacement. same size and materials. no rough opening changes. provide 2 number of 100 sq. in. minimuym openings at garage door for ventilation. | $2,500 |
| Jan 10, 2025 | In progress issued Feb 2025 | 381 Dellbrook Av | 1st fl: convert storage area into a bedroom, bath and laundry. provide outdoor grill and sink. replace furnace and water heater. 2nd fl: rebuild stair. provide new ceiling beams and new deck at the back. replace front and back cladding to stucco.Details
1st fl: convert storage area into a bedroom, bath and laundry. provide outdoor grill and sink. replace furnace and water heater. 2nd fl: rebuild stair. provide new ceiling beams and new deck at the back. replace front and back cladding to stucco. | $145,000 |
| Dec 2, 2024 | In progress issued Dec 2024 | 381 Dellbrook Av | roof replacement like for like. no hot work.Details
roof replacement like for like. no hot work. | $8,000 |
| Oct 21, 2024 | In progress issued Oct 2024 | 381 Dellbrook Av | revision to permit # 202410183309: one window replaceing in right hand side bedroom aluminum clad wood slider operation window.Details
revision to permit # 202410183309: one window replaceing in right hand side bedroom aluminum clad wood slider operation window. | $1,200 |
| Oct 18, 2024 | In progress issued Oct 2024 | 381 Dellbrook Av | kitchen and two bathrooms remodeling. new subpanel installation entire first floor rewire, first floor drywall installation. windows replacing in two front bedrooms, bathrooms and kitchen. same opening size. aluminum clad wood slider operation windows st visible.Details
kitchen and two bathrooms remodeling. new subpanel installation entire first floor rewire, first floor drywall installation. windows replacing in two front bedrooms, bathrooms and kitchen. same opening size. aluminum clad wood slider operation windows st visible. | $88,000 |
| Jul 5, 2024 | Completed final sign-off Aug 2024 | 1247 11th Av | in kind window replacement. vinyl windows installation on south side at 2 lightwells area. 18 windows totoal. new siding installation approx 1000 sq ft.Details
in kind window replacement. vinyl windows installation on south side at 2 lightwells area. 18 windows totoal. new siding installation approx 1000 sq ft. | $48,000 |
| Feb 20, 2024 | Completed final sign-off Apr 2024 | 1332 10th Av | in kind vinly window replacement on the southside of building. 18 windows total. new siding installation approx 1000 sq ft near lightwell area. u.30maxDetails
in kind vinly window replacement on the southside of building. 18 windows total. new siding installation approx 1000 sq ft near lightwell area. u.30max | $45,000 |
| Jan 29, 2024 | In progress issued Jan 2024 | 1 Crestline Dr | apt# 2: kitchen and bathroom remodel, like for like. new electrical panel installation, living room and bedroom recessed lights installation, hardwood floors and carpet installation, header beam over sliding door replacing in living room.Details
apt# 2: kitchen and bathroom remodel, like for like. new electrical panel installation, living room and bedroom recessed lights installation, hardwood floors and carpet installation, header beam over sliding door replacing in living room. | $42,000 |
| Dec 19, 2023 | Completed final sign-off Apr 2025 | 265 Wawona St | stucco removal and installation (3 coats) on south wall approx. 750sf. dry rot removal where needed. replace 5 windows in kind (side elevation) same size, same location. u=.30maxDetails
stucco removal and installation (3 coats) on south wall approx. 750sf. dry rot removal where needed. replace 5 windows in kind (side elevation) same size, same location. u=.30max | $24,000 |
| Dec 19, 2023 | Completed final sign-off Feb 2025 | 265 Wawona St | one kitchen and bathroom remodel in kind. new subpanel installation. entire 1/f rewire, new dry wall installation in kitchen, bathroom, living room, dinning room and 2 bedroooms. new flooring installation.Details
one kitchen and bathroom remodel in kind. new subpanel installation. entire 1/f rewire, new dry wall installation in kitchen, bathroom, living room, dinning room and 2 bedroooms. new flooring installation. | $85,000 |
| Dec 19, 2023 | Completed final sign-off Feb 2025 | 455 Euclid Av | apt 101: 1 kitchen and 1 bathroom remodel in kind. electrical subpanel update. living room and bedroom new recessed lights installation.Details
apt 101: 1 kitchen and 1 bathroom remodel in kind. electrical subpanel update. living room and bedroom new recessed lights installation. | $42,000 |
| Dec 1, 2023 | In progress issued Jan 2025 | 272 Wawona St | vertical addition to add 2 bedroom and 1 bath.Details
vertical addition to add 2 bedroom and 1 bath. | $180,000 |
| Nov 14, 2023 | Completed final sign-off Dec 2023 | 1899 California St | apt# 3: partial kitchen repair (sink side of the kitchen). cabinets installation, countertop installation. new sink and faucet installation. garbage disposal power outlet installation. patching and painting like for like.Details
apt# 3: partial kitchen repair (sink side of the kitchen). cabinets installation, countertop installation. new sink and faucet installation. garbage disposal power outlet installation. patching and painting like for like. | $3,200 |
| Oct 11, 2023 | In progress issued Oct 2023 | 1 Crestline Dr | stucco on south back wall of bldg. replacing approx. 2000 sq ft. 6 nw construction windows replacement. 6 new patio doors replaced like for like.Details
stucco on south back wall of bldg. replacing approx. 2000 sq ft. 6 nw construction windows replacement. 6 new patio doors replaced like for like. | $58,000 |
| Oct 11, 2023 | Completed final sign-off Dec 2023 | 455 Euclid Av | stucco on south back wall of the bldg. replacing approx. 1200 sq ft.Details
stucco on south back wall of the bldg. replacing approx. 1200 sq ft. | $28,000 |
| Jun 23, 2023 | Never finaled issued Jun 2023, no final | 1685 Chestnut St | new vinyl windows installation on back wall of the building. not visible from street. south side of the building new stucco on south back side of the building. like for like. total of 30 windows. approx 1000 sf of stucco.Details
new vinyl windows installation on back wall of the building. not visible from street. south side of the building new stucco on south back side of the building. like for like. total of 30 windows. approx 1000 sf of stucco. | $46,000 |
| May 19, 2023 | Completed final sign-off Jun 2023 | 342 24th Av | siding replacement on south side of the buildingapprox 2000 sqft. 12 new construction windows installation. not visible from the street.Details
siding replacement on south side of the buildingapprox 2000 sqft. 12 new construction windows installation. not visible from the street. | $34,000 |
| May 1, 2023 | Completed final sign-off Jul 2023 | 1441 Taylor St | repair (e) brick in kind. front facade 1st floor to 3rd floor.Details
repair (e) brick in kind. front facade 1st floor to 3rd floor. | $9,500 |
| Nov 4, 2022 | Completed final sign-off Mar 2023 | 1 Crestline Dr | apt #10: kitchen remodeling, like for like, one bathroom remodeling like for like. new electrical panel installation, living room and bedroom recessed lights installation, new shower value and bath tub installation, toilet vanity intallation. hardwood floor and carpet installation.Details
apt #10: kitchen remodeling, like for like, one bathroom remodeling like for like. new electrical panel installation, living room and bedroom recessed lights installation, new shower value and bath tub installation, toilet vanity intallation. hardwood floor and carpet installation. | $42,000 |
| Sep 1, 2022 | Completed final sign-off Oct 2022 | 1280 Ellis St | unit 11:newsubpanel install. living room, dining room, and kitchen new recessed lights installation, power outlets and switches installation in livng room and dining room.copper water supply line replacing in ceiling area of living room. insulation in ceiling and exterior walls where accessible. newDetails
unit 11:newsubpanel install. living room, dining room, and kitchen new recessed lights installation, power outlets and switches installation in livng room and dining room.copper water supply line replacing in ceiling area of living room. insulation in ceiling and exterior walls where accessible. new | $34,052 |
| Jul 8, 2022 | Completed final sign-off Oct 2022 | 1 Crestline Dr | unit #6: one kitchen and one bathroom remodel in-kind. new electrical panel. living room and bedroom recessed lights installation. new shower valve, bathtub, toilet, and vanity. hardwood floor and carpet installation.Details
unit #6: one kitchen and one bathroom remodel in-kind. new electrical panel. living room and bedroom recessed lights installation. new shower valve, bathtub, toilet, and vanity. hardwood floor and carpet installation. | $42,000 |
| Nov 18, 2021 | Completed final sign-off May 2022 | 619 Castro St | replace all kitchen cabinets, kitchen fixtues, bathroom fixtues. (n) tilesDetails
replace all kitchen cabinets, kitchen fixtues, bathroom fixtues. (n) tiles | $50,000 |
| Oct 12, 2021 | Completed final sign-off Mar 2022 | 1 Crestline Dr | unit #7:kitchen remodeling,like for like, new electrical panel installation, living room & bedroom recesseed lights installation,bathroom fl replacing, new shower valve installion, toilet,vanity,hardwood fl installation.Details
unit #7:kitchen remodeling,like for like, new electrical panel installation, living room & bedroom recesseed lights installation,bathroom fl replacing, new shower valve installion, toilet,vanity,hardwood fl installation. | $42,000 |
| May 27, 2021 | Completed final sign-off Nov 2021 | 272 Wawona St | drywall installation in bedroom #1 & #2 (aprox 400 sqft). window replacing in bedroom #1 & #2 (seven windows ) u-factor 0.30 max. like for like size window in addition to permit 202007190444Details
drywall installation in bedroom #1 & #2 (aprox 400 sqft). window replacing in bedroom #1 & #2 (seven windows ) u-factor 0.30 max. like for like size window in addition to permit 202007190444 | $8,000 |
| Jul 19, 2020 | Completed final sign-off Nov 2021 | 272 Wawona St | remodel kitchen, add half bath & window replacement. no other worksDetails
remodel kitchen, add half bath & window replacement. no other works | $90,000 |
| Jun 13, 2020 | Never finaled filed Jun 2020, never issued | 1379 10th Av | replace 9 windows seen from the street with new wood clad windows.Details
replace 9 windows seen from the street with new wood clad windows. | $10,000 |
| Jun 8, 2020 | Completed final sign-off Feb 2021 | 139 Lake Merced Hill So | unit #4e: remodel kitchen & 2 bathrooms, add 10 new recessed lights in the kitchen + 2 bathroom. all work in kind/like for like.Details
unit #4e: remodel kitchen & 2 bathrooms, add 10 new recessed lights in the kitchen + 2 bathroom. all work in kind/like for like. | $40,000 |
| May 18, 2020 | Never finaled issued Aug 2020, no final | 925 Pierce St | structural plans to accommodate adu under permit# 201703302785. new raised floor framing,headers and footingDetails
structural plans to accommodate adu under permit# 201703302785. new raised floor framing,headers and footing | $10,000 |
| Feb 27, 2020 | Completed final sign-off Jun 2020 | 1379 10th Av | removal of e stucco on front of bldg up to 1st fl no more than 500 sf. check for dryrot. change dryrot wood membrane. new stucco installation to match e stuccoDetails
removal of e stucco on front of bldg up to 1st fl no more than 500 sf. check for dryrot. change dryrot wood membrane. new stucco installation to match e stucco | $12,000 |
| Nov 20, 2018 | Completed final sign-off Dec 2018 | 747 Natoma St | unit 16: repair leak in garage through waterproofing membrane. all work located at the rear of the subject building. to comply with nov 201721521.Details
unit 16: repair leak in garage through waterproofing membrane. all work located at the rear of the subject building. to comply with nov 201721521. | $6,000 |
| Jun 6, 2018 | Completed final sign-off Nov 2018 | 1950 Clay St | unit 504: kitchen remodel, demo (e) cabinets/countertops, install new electrical subpanel, new cabinets/countertops, kitechen appliances, new angle stops, finish plumbingDetails
unit 504: kitchen remodel, demo (e) cabinets/countertops, install new electrical subpanel, new cabinets/countertops, kitechen appliances, new angle stops, finish plumbing | $27,500 |
| Jun 6, 2018 | Completed final sign-off Jun 2018 | 2737 Sutter St | unit 8: to comply with complaint #201843176 dated 3/2/2018, install (3) new steam radiators in unit 8, steam pipe relocation where needed; relocate power oulets behind radiator to new location, open floor for pipe insulation, items 2 & 3.Details
unit 8: to comply with complaint #201843176 dated 3/2/2018, install (3) new steam radiators in unit 8, steam pipe relocation where needed; relocate power oulets behind radiator to new location, open floor for pipe insulation, items 2 & 3. | $6,000 |
| Apr 20, 2018 | Completed final sign-off Oct 2018 | 747 Natoma St | balcony repair (955 sq) - remove existing tiles, build new slope, install new plywood flooring, flashings, waterproofing memebrane, install new westcoat system alx and repair stucco where neededDetails
balcony repair (955 sq) - remove existing tiles, build new slope, install new plywood flooring, flashings, waterproofing memebrane, install new westcoat system alx and repair stucco where needed | $12,000 |
| Apr 20, 2018 | Completed final sign-off Oct 2018 | 747 Natoma St | balcony repair (955 sq) - remove existing tiles,repair dry rot, build new slope, install new plywood flooring, flashings, waterproofing membrane, install new westcoat system hlx and repair stucco where neededDetails
balcony repair (955 sq) - remove existing tiles,repair dry rot, build new slope, install new plywood flooring, flashings, waterproofing membrane, install new westcoat system hlx and repair stucco where needed | $13,000 |
| Feb 6, 2018 | Completed final sign-off Mar 2018 | 1950 Clay St | revision to 201831922kitchen and bath remodel. new shower valves, angle stops, vanity, toilet. no framingDetails
revision to 201831922kitchen and bath remodel. new shower valves, angle stops, vanity, toilet. no framing | $35,000 |
| Jan 22, 2018 | Completed final sign-off Jun 2018 | 1950 Clay St | apt 301: remodel of (e) kitchen & 2 bathrooms, no change in walls & opening layout. to comply with complaint #201831922.Details
apt 301: remodel of (e) kitchen & 2 bathrooms, no change in walls & opening layout. to comply with complaint #201831922. | $35,000 |
| Jan 12, 2018 | Never finaled issued Aug 2018, no final | 1407 Larkin St | interior remodel: including relocate/reconfigure (e) bathroom, add new bathroom & laundry closet, relocate/remodel kitchen, reconfigure bedroom layout. exterior: replace all (e) aluminum new insulated windows with nw wood insulated windows. matching size. n/a maherDetails
interior remodel: including relocate/reconfigure (e) bathroom, add new bathroom & laundry closet, relocate/remodel kitchen, reconfigure bedroom layout. exterior: replace all (e) aluminum new insulated windows with nw wood insulated windows. matching size. n/a maher | $97,000 |
| Dec 20, 2017 | Completed final sign-off Oct 2018 | 1150 Union St | unit #706: kitchen and bathroom remodel. replace cabinets, countertops, power outlets, lights. replace vanity, install bathroom fan, replace shower tiles, painting. no rough framing & change of (e). no structural work. maher n/aDetails
unit #706: kitchen and bathroom remodel. replace cabinets, countertops, power outlets, lights. replace vanity, install bathroom fan, replace shower tiles, painting. no rough framing & change of (e). no structural work. maher n/a | $28,000 |
| Dec 8, 2017 | Completed final sign-off Apr 2018 | 342 24th Av | #202 - remodel existing kitchen & bathroom. replace ktichen cabients & countertops, upgrade electrical outlets in kitchen.Details
#202 - remodel existing kitchen & bathroom. replace ktichen cabients & countertops, upgrade electrical outlets in kitchen. | $25,000 |
| Mar 30, 2017 | Completed final sign-off Mar 2022 | 925 Pierce St | add unit per ordinance no. 162-16. convert (e) garage space to (n) 2bedrom/2 bathrm unit at ground floor. total 13 units.Details
add unit per ordinance no. 162-16. convert (e) garage space to (n) 2bedrom/2 bathrm unit at ground floor. total 13 units. | $30,000 |
| Mar 1, 2017 | Completed final sign-off Dec 2017 | 1728 Union St | demo (e) siding & trim dry rot repair replace trim membrane siding flashing paint replace windows if damaged all material & window replacement in kind. new window wood alum/cladDetails
demo (e) siding & trim dry rot repair replace trim membrane siding flashing paint replace windows if damaged all material & window replacement in kind. new window wood alum/clad | $20,000 |