Back to kitchen remodel contractors
Euro Team Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2017 to Feb 2026
- Last 24 months
- 11 permits filed
47 permits since 2000: 33 completed, 10 in progress, 4 never finaled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
18 kitchen remodel permits: 15 completed, 2 in progress, 1 never finaled. Typically 0 days from filing to permit and 156 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 18, 2024 | In progress issued Oct 2024 | 381 Dellbrook Av | kitchen and two bathrooms remodeling. new subpanel installation entire first floor rewire, first floor drywall installation. windows replacing in two front bedrooms, bathrooms and kitchen. same opening size. aluminum clad wood slider operation windows st visible.Details
kitchen and two bathrooms remodeling. new subpanel installation entire first floor rewire, first floor drywall installation. windows replacing in two front bedrooms, bathrooms and kitchen. same opening size. aluminum clad wood slider operation windows st visible. | $88,000 |
| Jan 29, 2024 | In progress issued Jan 2024 | 1 Crestline Dr | apt# 2: kitchen and bathroom remodel, like for like. new electrical panel installation, living room and bedroom recessed lights installation, hardwood floors and carpet installation, header beam over sliding door replacing in living room.Details
apt# 2: kitchen and bathroom remodel, like for like. new electrical panel installation, living room and bedroom recessed lights installation, hardwood floors and carpet installation, header beam over sliding door replacing in living room. | $42,000 |
| Dec 19, 2023 | Completed final sign-off Feb 2025 | 265 Wawona St | one kitchen and bathroom remodel in kind. new subpanel installation. entire 1/f rewire, new dry wall installation in kitchen, bathroom, living room, dinning room and 2 bedroooms. new flooring installation.Details
one kitchen and bathroom remodel in kind. new subpanel installation. entire 1/f rewire, new dry wall installation in kitchen, bathroom, living room, dinning room and 2 bedroooms. new flooring installation. | $85,000 |
| Dec 19, 2023 | Completed final sign-off Feb 2025 | 455 Euclid Av | apt 101: 1 kitchen and 1 bathroom remodel in kind. electrical subpanel update. living room and bedroom new recessed lights installation.Details
apt 101: 1 kitchen and 1 bathroom remodel in kind. electrical subpanel update. living room and bedroom new recessed lights installation. | $42,000 |
| Nov 14, 2023 | Completed final sign-off Dec 2023 | 1899 California St | apt# 3: partial kitchen repair (sink side of the kitchen). cabinets installation, countertop installation. new sink and faucet installation. garbage disposal power outlet installation. patching and painting like for like.Details
apt# 3: partial kitchen repair (sink side of the kitchen). cabinets installation, countertop installation. new sink and faucet installation. garbage disposal power outlet installation. patching and painting like for like. | $3,200 |
| Nov 4, 2022 | Completed final sign-off Mar 2023 | 1 Crestline Dr | apt #10: kitchen remodeling, like for like, one bathroom remodeling like for like. new electrical panel installation, living room and bedroom recessed lights installation, new shower value and bath tub installation, toilet vanity intallation. hardwood floor and carpet installation.Details
apt #10: kitchen remodeling, like for like, one bathroom remodeling like for like. new electrical panel installation, living room and bedroom recessed lights installation, new shower value and bath tub installation, toilet vanity intallation. hardwood floor and carpet installation. | $42,000 |
| Sep 1, 2022 | Completed final sign-off Oct 2022 | 1280 Ellis St | unit 11:newsubpanel install. living room, dining room, and kitchen new recessed lights installation, power outlets and switches installation in livng room and dining room.copper water supply line replacing in ceiling area of living room. insulation in ceiling and exterior walls where accessible. newDetails
unit 11:newsubpanel install. living room, dining room, and kitchen new recessed lights installation, power outlets and switches installation in livng room and dining room.copper water supply line replacing in ceiling area of living room. insulation in ceiling and exterior walls where accessible. new | $34,052 |
| Jul 8, 2022 | Completed final sign-off Oct 2022 | 1 Crestline Dr | unit #6: one kitchen and one bathroom remodel in-kind. new electrical panel. living room and bedroom recessed lights installation. new shower valve, bathtub, toilet, and vanity. hardwood floor and carpet installation.Details
unit #6: one kitchen and one bathroom remodel in-kind. new electrical panel. living room and bedroom recessed lights installation. new shower valve, bathtub, toilet, and vanity. hardwood floor and carpet installation. | $42,000 |
| Nov 18, 2021 | Completed final sign-off May 2022 | 619 Castro St | replace all kitchen cabinets, kitchen fixtues, bathroom fixtues. (n) tilesDetails
replace all kitchen cabinets, kitchen fixtues, bathroom fixtues. (n) tiles | $50,000 |
| Oct 12, 2021 | Completed final sign-off Mar 2022 | 1 Crestline Dr | unit #7:kitchen remodeling,like for like, new electrical panel installation, living room & bedroom recesseed lights installation,bathroom fl replacing, new shower valve installion, toilet,vanity,hardwood fl installation.Details
unit #7:kitchen remodeling,like for like, new electrical panel installation, living room & bedroom recesseed lights installation,bathroom fl replacing, new shower valve installion, toilet,vanity,hardwood fl installation. | $42,000 |
| Jul 19, 2020 | Completed final sign-off Nov 2021 | 272 Wawona St | remodel kitchen, add half bath & window replacement. no other worksDetails
remodel kitchen, add half bath & window replacement. no other works | $90,000 |
| Jun 8, 2020 | Completed final sign-off Feb 2021 | 139 Lake Merced Hill So | unit #4e: remodel kitchen & 2 bathrooms, add 10 new recessed lights in the kitchen + 2 bathroom. all work in kind/like for like.Details
unit #4e: remodel kitchen & 2 bathrooms, add 10 new recessed lights in the kitchen + 2 bathroom. all work in kind/like for like. | $40,000 |
| Jun 6, 2018 | Completed final sign-off Nov 2018 | 1950 Clay St | unit 504: kitchen remodel, demo (e) cabinets/countertops, install new electrical subpanel, new cabinets/countertops, kitechen appliances, new angle stops, finish plumbingDetails
unit 504: kitchen remodel, demo (e) cabinets/countertops, install new electrical subpanel, new cabinets/countertops, kitechen appliances, new angle stops, finish plumbing | $27,500 |
| Feb 6, 2018 | Completed final sign-off Mar 2018 | 1950 Clay St | revision to 201831922kitchen and bath remodel. new shower valves, angle stops, vanity, toilet. no framingDetails
revision to 201831922kitchen and bath remodel. new shower valves, angle stops, vanity, toilet. no framing | $35,000 |
| Jan 22, 2018 | Completed final sign-off Jun 2018 | 1950 Clay St | apt 301: remodel of (e) kitchen & 2 bathrooms, no change in walls & opening layout. to comply with complaint #201831922.Details
apt 301: remodel of (e) kitchen & 2 bathrooms, no change in walls & opening layout. to comply with complaint #201831922. | $35,000 |
| Jan 12, 2018 | Never finaled issued Aug 2018, no final | 1407 Larkin St | interior remodel: including relocate/reconfigure (e) bathroom, add new bathroom & laundry closet, relocate/remodel kitchen, reconfigure bedroom layout. exterior: replace all (e) aluminum new insulated windows with nw wood insulated windows. matching size. n/a maherDetails
interior remodel: including relocate/reconfigure (e) bathroom, add new bathroom & laundry closet, relocate/remodel kitchen, reconfigure bedroom layout. exterior: replace all (e) aluminum new insulated windows with nw wood insulated windows. matching size. n/a maher | $97,000 |
| Dec 20, 2017 | Completed final sign-off Oct 2018 | 1150 Union St | unit #706: kitchen and bathroom remodel. replace cabinets, countertops, power outlets, lights. replace vanity, install bathroom fan, replace shower tiles, painting. no rough framing & change of (e). no structural work. maher n/aDetails
unit #706: kitchen and bathroom remodel. replace cabinets, countertops, power outlets, lights. replace vanity, install bathroom fan, replace shower tiles, painting. no rough framing & change of (e). no structural work. maher n/a | $28,000 |
| Dec 8, 2017 | Completed final sign-off Apr 2018 | 342 24th Av | #202 - remodel existing kitchen & bathroom. replace ktichen cabients & countertops, upgrade electrical outlets in kitchen.Details
#202 - remodel existing kitchen & bathroom. replace ktichen cabients & countertops, upgrade electrical outlets in kitchen. | $25,000 |