Back to kitchen remodel contractors
Qse Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Aug 2026
- Last 24 months
- 8 permits filed
341 permits since 2000: 214 completed, 7 in progress, 55 never finaled, 65 expired or cancelled.
Of the 55 never-finaled permits, 6 are 3 to 5 years old, 16 are 5 to 10 years old, 33 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 3 completed, 1 expired or cancelled. Typically 497 days from filing to permit and 857 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2024 | Expired or cancelled cancelled Jan 2026 | 2262 Pine St | kitchen remodel like in kind: remove and replace broicon granite, countertop with new sink - no new faucets. minor kitchen rehab (e) cabinets and appliances to remain.Details
kitchen remodel like in kind: remove and replace broicon granite, countertop with new sink - no new faucets. minor kitchen rehab (e) cabinets and appliances to remain. | $5,000 |
| Mar 26, 2021 | Completed final sign-off Dec 2025 | 324 Collingwood St | reconfigure 3/f to add 2 (n) bedrooms, 1 (n) bathroom. reconfigure first floor to add 1 (n) half bathh, 1 (n) wet bar in theater room & 1 (n) store, 1 (n) bathroom, 1 (n) second kitchen in family room. add 1(n) wet bar & 1 (n) half bath at 2/f. (n) roof deck w/ new wet bar & 1 (n) hot tub.Details
reconfigure 3/f to add 2 (n) bedrooms, 1 (n) bathroom. reconfigure first floor to add 1 (n) half bathh, 1 (n) wet bar in theater room & 1 (n) store, 1 (n) bathroom, 1 (n) second kitchen in family room. add 1(n) wet bar & 1 (n) half bath at 2/f. (n) roof deck w/ new wet bar & 1 (n) hot tub. | $25,000 |
| Jul 29, 2016 | Completed final sign-off Aug 2022 | 200 Saint Francis Bl | basement seismic upgrade, (n) exercise room, (n) family room, (n) bathroom. 1st floor kitchen & bath renovation. (n) lighting & electrical system upgrade.Details
basement seismic upgrade, (n) exercise room, (n) family room, (n) bathroom. 1st floor kitchen & bath renovation. (n) lighting & electrical system upgrade. | $80,000 |
| Sep 27, 2013 | Completed final sign-off Apr 2016 | 1132 Green St | excavate basement to create new garage, new elevator,add nezzanine and interior remodel of kitchens and 3 baths. include temporary shroing plan in this submittal.Details
excavate basement to create new garage, new elevator,add nezzanine and interior remodel of kitchens and 3 baths. include temporary shroing plan in this submittal. | $350,000 |