Royal Lyon Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jun 2023
- Last 24 months
- 0 permits filed
221 permits since 2000: 191 completed, 15 never finaled, 15 expired or cancelled.
Of the 15 never-finaled permits, 4 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Roof deck permits
7 roof deck permits: 6 completed, 1 expired or cancelled. Typically 121 days from filing to permit and 590 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2019 | Completed final sign-off Aug 2020 | 670 19th Av | convert 1st fl storage to living space (home office), relocate laundry, kitchen reno, relocate powder room, 1 full bath & install a new full bath @ 3rd floor. new 3rd floor roof deck; replace front windows in-kind, new rear windows & doorsDetails
convert 1st fl storage to living space (home office), relocate laundry, kitchen reno, relocate powder room, 1 full bath & install a new full bath @ 3rd floor. new 3rd floor roof deck; replace front windows in-kind, new rear windows & doors | $125,000 |
| Jan 15, 2019 | Completed final sign-off Jun 2024 | 740 Shotwell St | excavation (e) bldg to add basement(2nd unit), (e) 2 flrs to be remodeld & combined into 1 unit, horizontal addition @ south rear side @ 2nd flr. west rear addition converts (e) roof deck @ 2nd flr into liveable space, vertical addition of roof deck above (n) liveable space. solar panels @ roof.Details
excavation (e) bldg to add basement(2nd unit), (e) 2 flrs to be remodeld & combined into 1 unit, horizontal addition @ south rear side @ 2nd flr. west rear addition converts (e) roof deck @ 2nd flr into liveable space, vertical addition of roof deck above (n) liveable space. solar panels @ roof. | $140,000 |
| Apr 23, 2015 | Expired or cancelled cancelled Oct 2017 | 2 Romain St | a new vertical addition to (e) 2 story single family res'd. add a 3rd level to an (e) 2 level house. constructed over a porton of the (e) roof. the (n) 3rd level will have a home office, multi purpose rm. a media area & bathrm. a roof deck will also be constructed. a (n) interior stairs will be addDetails
a new vertical addition to (e) 2 story single family res'd. add a 3rd level to an (e) 2 level house. constructed over a porton of the (e) roof. the (n) 3rd level will have a home office, multi purpose rm. a media area & bathrm. a roof deck will also be constructed. a (n) interior stairs will be add | $230,000 |
| Mar 25, 2015 | Completed final sign-off May 2015 | 560 Greenwich St | repair (e) roof deck, size about 16 x 18 less than 50% in kindDetails
repair (e) roof deck, size about 16 x 18 less than 50% in kind | $6,000 |
| May 7, 2013 | Completed final sign-off May 2015 | 74 Aztec St | convert single car garage to family rm, double car garage to remain, const interior stairs from 1st to 2nd level, add a shower stall to (e) bath on lower level, move garage door locations, install (n) windows on lower level, install replacement windows on 2nd level, install (n) rooftop deckDetails
convert single car garage to family rm, double car garage to remain, const interior stairs from 1st to 2nd level, add a shower stall to (e) bath on lower level, move garage door locations, install (n) windows on lower level, install replacement windows on 2nd level, install (n) rooftop deck | $92,000 |
| Sep 7, 2011 | Completed final sign-off Apr 2015 | 1759 14th Av | veritical addition on 3rd floor with roof deck. minor horizontal addition on 1st & 2nd floors & interior remodel.Details
veritical addition on 3rd floor with roof deck. minor horizontal addition on 1st & 2nd floors & interior remodel. | $300,000 |
| Jul 2, 2009 | Completed final sign-off Apr 2010 | 3 Saturn St | repair dry rotted at back of building, replace tiles at roof deck.Details
repair dry rotted at back of building, replace tiles at roof deck. | $20,000 |