Back to kitchen remodel contractors
Royal Lyon Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jun 2023
- Last 24 months
- 0 permits filed
221 permits since 2000: 191 completed, 15 never finaled, 15 expired or cancelled.
Of the 15 never-finaled permits, 4 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
63 kitchen remodel permits: 54 completed, 4 never finaled, 5 expired or cancelled. Typically 0 days from filing to permit and 208 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 12, 2022 | Completed final sign-off Nov 2022 | 955 Corbett Av | unit #5: (1) kitchen (1) bathroom remodel, in-kind. non structural.Details
unit #5: (1) kitchen (1) bathroom remodel, in-kind. non structural. | $25,000 |
| Apr 21, 2022 | Completed final sign-off Nov 2022 | 466 09th Av | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $12,000 |
| Feb 15, 2022 | Completed final sign-off Apr 2022 | 779 10th Av | one kitchen (1) and one bathroom (1) remodel. no structural alteration.Details
one kitchen (1) and one bathroom (1) remodel. no structural alteration. | $20,000 |
| Feb 3, 2022 | Completed final sign-off Jun 2022 | 164 Banks St | interior renovation of (e) one kitchen & one bathroom with the (e) space, in-kind. (n) windows replacement will be install in each space & a (n) pati8o door will be install in (e) openings. no change of size or location.(n) cabinets & finishes will be installed. non structural work. all work in kindDetails
interior renovation of (e) one kitchen & one bathroom with the (e) space, in-kind. (n) windows replacement will be install in each space & a (n) pati8o door will be install in (e) openings. no change of size or location.(n) cabinets & finishes will be installed. non structural work. all work in kind | $42,000 |
| May 28, 2021 | Completed final sign-off Oct 2021 | 1478 11th Av | kitchen (1) and bathroom (1) remodel. in kind replacement. (led exit fan) replace furnace in kind. high efficiency.Details
kitchen (1) and bathroom (1) remodel. in kind replacement. (led exit fan) replace furnace in kind. high efficiency. | $18,000 |
| May 11, 2021 | Completed final sign-off Nov 2022 | 63 Germania St | refinish e stairs level 2/3, remove walll at level 13, replace e gas fireplace with new gas insert at e location, add new window at rear level 3, not visible, kitchen remodel in place level 3, new flooring, new recessed lights, remove e bath lvel 2, remoel e bath level 4Details
refinish e stairs level 2/3, remove walll at level 13, replace e gas fireplace with new gas insert at e location, add new window at rear level 3, not visible, kitchen remodel in place level 3, new flooring, new recessed lights, remove e bath lvel 2, remoel e bath level 4 | $80,000 |
| Apr 7, 2021 | Completed final sign-off Dec 2021 | 60 Marietta Dr | widen opening to dining room (n) kitchen cabs, upgrade kitchen lightingDetails
widen opening to dining room (n) kitchen cabs, upgrade kitchen lighting | $12,000 |
| Jan 8, 2021 | Completed final sign-off Jun 2021 | 1336 20th St | kitchen and bathroom remodel in kind.Details
kitchen and bathroom remodel in kind. | $20,000 |
| Mar 29, 2019 | Completed final sign-off Jul 2019 | 1350 California St | unit 206: replace kitchen counter top and plumbing fixtures. replace plumbing, fixtures, and tile at (2) bathrooms.Details
unit 206: replace kitchen counter top and plumbing fixtures. replace plumbing, fixtures, and tile at (2) bathrooms. | $20,000 |
| Feb 13, 2019 | Completed final sign-off Aug 2020 | 670 19th Av | convert 1st fl storage to living space (home office), relocate laundry, kitchen reno, relocate powder room, 1 full bath & install a new full bath @ 3rd floor. new 3rd floor roof deck; replace front windows in-kind, new rear windows & doorsDetails
convert 1st fl storage to living space (home office), relocate laundry, kitchen reno, relocate powder room, 1 full bath & install a new full bath @ 3rd floor. new 3rd floor roof deck; replace front windows in-kind, new rear windows & doors | $125,000 |
| Apr 23, 2018 | Completed final sign-off May 2019 | 1309 20th St | renovation of vacant 2-story bld. remove (e) kitchen, stairs, & split bathrm. constr (n) kitchen, bathrom, livingrm, bedrm at 1st flr. constr (n) stairs to 2nd flr for (n) main bedrm & 1/2 bath.Details
renovation of vacant 2-story bld. remove (e) kitchen, stairs, & split bathrm. constr (n) kitchen, bathrom, livingrm, bedrm at 1st flr. constr (n) stairs to 2nd flr for (n) main bedrm & 1/2 bath. | $276,000 |
| Jan 3, 2018 | Completed final sign-off Oct 2018 | 1380 Greenwich St | unit 10: kitchen & bathroomremodel - no structural work in same location. nomoving of walls, doors or windows.Details
unit 10: kitchen & bathroomremodel - no structural work in same location. nomoving of walls, doors or windows. | $10,000 |
| Jun 1, 2017 | Completed final sign-off Oct 2017 | 347 Prague St | kitchen remodel including relocating extg cabinets, minor changes to plmg. removal of load bearing wall, construction of load bearing beam, electrical and mechanical work.Details
kitchen remodel including relocating extg cabinets, minor changes to plmg. removal of load bearing wall, construction of load bearing beam, electrical and mechanical work. | $22,000 |
| Mar 23, 2016 | Completed final sign-off Dec 2016 | 639 12th Av | 2nd flr: demo (e)kitchen & powder rm, install new kitchen & powder rm within (e)spaces,3rd flr: demo (e) en suite bathrm, install a new bathrm in space. all construction is within (e)bldg envelope.no new addition or sq.ft. will be added.Details
2nd flr: demo (e)kitchen & powder rm, install new kitchen & powder rm within (e)spaces,3rd flr: demo (e) en suite bathrm, install a new bathrm in space. all construction is within (e)bldg envelope.no new addition or sq.ft. will be added. | $35,200 |
| Nov 17, 2015 | Completed final sign-off Mar 2016 | 83 Park St | at e 3rd floor dwelling unit, remove e partitions, plumbing fixtures and cabinetry a e kitchen and baths. provide new cabinetry, plumbing, fixtures, light fixtures at e kitchen and baths. provide and replace light fixtures in hallway, living room, dining roomDetails
at e 3rd floor dwelling unit, remove e partitions, plumbing fixtures and cabinetry a e kitchen and baths. provide new cabinetry, plumbing, fixtures, light fixtures at e kitchen and baths. provide and replace light fixtures in hallway, living room, dining room | $80,465 |
| Oct 23, 2015 | Never finaled issued Oct 2016, no final | 447 Vermont St | interior remodel and addition at rear of existing residence, replace bath at 1st floor. remodel kitchen and add powder rm at 2/f. add 2 baths at 3/f remodel bedrm at 1/f. add 2 bedrms at 3/f by remodeling existing habitable space. for previous work at stair to 3rd floor see permit #2011-0603-7402.Details
interior remodel and addition at rear of existing residence, replace bath at 1st floor. remodel kitchen and add powder rm at 2/f. add 2 baths at 3/f remodel bedrm at 1/f. add 2 bedrms at 3/f by remodeling existing habitable space. for previous work at stair to 3rd floor see permit #2011-0603-7402. | $448,000 |
| Aug 7, 2015 | Completed final sign-off Oct 2019 | 10 Romain St | 3rd floor addition & renovation of (e) 2nd floor, (n) kitchen, (1)(n) bathroom.Details
3rd floor addition & renovation of (e) 2nd floor, (n) kitchen, (1)(n) bathroom. | $250,000 |
| Jun 1, 2015 | Completed final sign-off Jan 2019 | 782 Wisconsin St | vertical addition to 1 story rear unit of 2 unit condo bldg, kitchen remodel.Details
vertical addition to 1 story rear unit of 2 unit condo bldg, kitchen remodel. | $150,000 |
| Mar 6, 2015 | Completed final sign-off Oct 2019 | 321 Chenery St | remove & replace (e)rear structure, deck & stairs with new horizontal two story addition, deck & stairs. relocate (e) 3rd flr. one bedroom unit to 1st flr. infill at ground flr level, remodel garage & ground flr level. remodel kitchen & 2nd flr bath.Details
remove & replace (e)rear structure, deck & stairs with new horizontal two story addition, deck & stairs. relocate (e) 3rd flr. one bedroom unit to 1st flr. infill at ground flr level, remodel garage & ground flr level. remodel kitchen & 2nd flr bath. | $200,000 |
| Oct 7, 2014 | Completed final sign-off Aug 2015 | 2230 15th St | interior remodel of unit #2230. work includes remodeling of (e) kitchen and bathroom. add half bath per plan. open up the wall between kitchen and living.Details
interior remodel of unit #2230. work includes remodeling of (e) kitchen and bathroom. add half bath per plan. open up the wall between kitchen and living. | $80,100 |
| Aug 12, 2014 | Completed final sign-off Apr 2019 | 2 Douglass St | interior remodel of (e) single fam dwelling,gr: reconfigure interior partitions to add (1) bedrm. relocate (2)(e) bathrms & (e) laundry rm. 2/f: remove & reconfigure interior partitions to expand(e) kitchen. remove(e) exterior windows & (e) doors at sides & rear of bldg & replace w/(n) windows & (n)Details
interior remodel of (e) single fam dwelling,gr: reconfigure interior partitions to add (1) bedrm. relocate (2)(e) bathrms & (e) laundry rm. 2/f: remove & reconfigure interior partitions to expand(e) kitchen. remove(e) exterior windows & (e) doors at sides & rear of bldg & replace w/(n) windows & (n) | $255,000 |
| Jul 16, 2014 | Completed final sign-off Jul 2015 | 224 Castenada Av | interior remodeling: remodel kitchen in same location on 2nd floor. add door to bath room on 3rd floor. replace extg door to bedroom with double door. add a storage room in (e) garage.Details
interior remodeling: remodel kitchen in same location on 2nd floor. add door to bath room on 3rd floor. replace extg door to bedroom with double door. add a storage room in (e) garage. | $39,000 |
| Jun 19, 2014 | Completed final sign-off Jan 2015 | 2237 15th Av | demolition of existing kitchen and bath on second floor. relocation of kitchen and add home office. remodel existing bathroom. replace existing windows per plan and all windows are not visible from street. relocation and install new furnace. relocate existing water heater.Details
demolition of existing kitchen and bath on second floor. relocation of kitchen and add home office. remodel existing bathroom. replace existing windows per plan and all windows are not visible from street. relocation and install new furnace. relocate existing water heater. | $58,000 |
| Dec 10, 2013 | Completed final sign-off Feb 2015 | 1924 Pine St | remove non-load bearing wall and stairs between kitchen and billiard room. build out new kitchen, laundry room, and master bathroom. add new spiral stair. new door, windows, and one skylight. new electrical and light fixtures.no work visible from the streetDetails
remove non-load bearing wall and stairs between kitchen and billiard room. build out new kitchen, laundry room, and master bathroom. add new spiral stair. new door, windows, and one skylight. new electrical and light fixtures.no work visible from the street | $70,000 |
| Jul 8, 2013 | Expired or cancelled expired Mar 2017 | 3686 Folsom St | renovate (e) kitchen, remove (e) cabinets, sink, remove 2 (e) skylights & 1 window. install new cabinets, appliances, sinks, lighting, electrical outlets & finishes. install 1 new skylight & 1 new window in (e) opening. (n) wood, (e) vinylDetails
renovate (e) kitchen, remove (e) cabinets, sink, remove 2 (e) skylights & 1 window. install new cabinets, appliances, sinks, lighting, electrical outlets & finishes. install 1 new skylight & 1 new window in (e) opening. (n) wood, (e) vinyl | $32,000 |
| Mar 25, 2013 | Expired or cancelled expired Apr 2019 | 2245 Webster St | addition of garage door & ramp and curb cut, fill in (e) side yard on all 3 levels approx614 sq ft)full interior remodel struct. upgrade new rear facade, new kitchen, new bathrms (2.5) new finishes thruout, new elect. thruout. repair (e) staircase. replace stair to garage, new doors & windowsDetails
addition of garage door & ramp and curb cut, fill in (e) side yard on all 3 levels approx614 sq ft)full interior remodel struct. upgrade new rear facade, new kitchen, new bathrms (2.5) new finishes thruout, new elect. thruout. repair (e) staircase. replace stair to garage, new doors & windows | $180,000 |
| Feb 19, 2013 | Completed final sign-off Jan 2016 | 871 Lawton St | remodel including: new 1/f coat closet, 376 sq. ft. 2/f rear addition & deck, new interior stairway wall openings, 2/f kitchen remodel, remodel 2/f powder room. new pocket doors at 2nd floor storage room; replace (e) windows & sliding glass doors at 2nd & 3rd floor, 142 sq.ft. 3rd floor front additnDetails
remodel including: new 1/f coat closet, 376 sq. ft. 2/f rear addition & deck, new interior stairway wall openings, 2/f kitchen remodel, remodel 2/f powder room. new pocket doors at 2nd floor storage room; replace (e) windows & sliding glass doors at 2nd & 3rd floor, 142 sq.ft. 3rd floor front additn | $125,000 |
| Oct 16, 2012 | Completed final sign-off Apr 2019 | 2245 Webster St | interior remodel to include 3 new bathrooms, new kitchen, new plumbing and electrical throughout, new mechanical, nw foundation. foundation to be lowered to create 8'6 clr headroom in basement. new exercise room in basementDetails
interior remodel to include 3 new bathrooms, new kitchen, new plumbing and electrical throughout, new mechanical, nw foundation. foundation to be lowered to create 8'6 clr headroom in basement. new exercise room in basement | $230,000 |
| Aug 29, 2012 | Never finaled issued Aug 2012, no final | 1255 California St | remove & install existing kitchen & bathroom cabinets, plumbing fixtures, light fixtures. new tile for bathroom, to replace existing tile, no wall to be changed, replace existing hood & exhause fan to existing duct.Details
remove & install existing kitchen & bathroom cabinets, plumbing fixtures, light fixtures. new tile for bathroom, to replace existing tile, no wall to be changed, replace existing hood & exhause fan to existing duct. | $12,000 |
| May 1, 2012 | Completed final sign-off Jul 2012 | 1925 Pacific Av | remove existing cabinets, plumbing fixture, light fixture, install new cabinets, plumbing fixture, light fixtures in kitchen & bath, no wall to be changed.Details
remove existing cabinets, plumbing fixture, light fixture, install new cabinets, plumbing fixture, light fixtures in kitchen & bath, no wall to be changed. | $15,000 |
| Oct 27, 2011 | Completed final sign-off Apr 2012 | 1865 Post St | tenant improvement of existing restaurant. new kitchen and hvac equipment. existing egress to remain. no change to exterior. existing bathrooms comply with accessibility requirementsDetails
tenant improvement of existing restaurant. new kitchen and hvac equipment. existing egress to remain. no change to exterior. existing bathrooms comply with accessibility requirements | $140,000 |
| Sep 6, 2011 | Completed final sign-off Dec 2011 | 1626 Pacheco St | removed (e) kitchen cabinets, install new kitchen cabinets, update plumbing & electrical works at 2nd floor. no structural work, new lighting comply with cec 150 (k)Details
removed (e) kitchen cabinets, install new kitchen cabinets, update plumbing & electrical works at 2nd floor. no structural work, new lighting comply with cec 150 (k) | $10,000 |
| May 23, 2011 | Completed final sign-off May 2013 | 572 17th Av | remodel (e) residence and add a total of 564 sqft. addition of one bathroom and relocate kitchen to newly added space.Details
remodel (e) residence and add a total of 564 sqft. addition of one bathroom and relocate kitchen to newly added space. | $70,000 |
| Apr 1, 2010 | Completed final sign-off Mar 2011 | 641 Moraga St | infill addition under (e) sunroom for new study at 1st floor. upgrades to (e) bath , kitchen and dining room.Details
infill addition under (e) sunroom for new study at 1st floor. upgrades to (e) bath , kitchen and dining room. | $45,000 |
| Feb 20, 2009 | Completed final sign-off Feb 2012 | 884 Douglass St | exploratory demolition dryrot repair. remodel kitchen (2nd floor), remodel 1 bath (3rd floor) install 5/8" type x gyp bd. as required for 1 hourconstruction at all property line walls where existing finishes removed.Details
exploratory demolition dryrot repair. remodel kitchen (2nd floor), remodel 1 bath (3rd floor) install 5/8" type x gyp bd. as required for 1 hourconstruction at all property line walls where existing finishes removed. | $50,000 |
| Nov 10, 2008 | Completed final sign-off Mar 2009 | 3010 Franklin St | apt 2 - kitchen remodel- remove existing kitchen cabinets. install new kitchen cabinets, counter top, flooring and painting.Details
apt 2 - kitchen remodel- remove existing kitchen cabinets. install new kitchen cabinets, counter top, flooring and painting. | $16,000 |
| Oct 6, 2008 | Completed final sign-off May 2009 | 1450 Shrader St | kitchen remodel-close 1 door, open 1 door, under mount cabinet flourscent lights, counter repairDetails
kitchen remodel-close 1 door, open 1 door, under mount cabinet flourscent lights, counter repair | $4,200 |
| Sep 8, 2008 | Completed final sign-off Feb 2010 | 1719 09th Av | horizontal extension to rear of (e) bldg on 1st & 2nd flrs. convert (e) 1st flr to additonal unit w/ 1 bedrm, study, kitchen & 1 bath. remodel (e) 2nd flr w/ 2 bedrms, study, kitchen & 2 bathrms. convert (e) 1 car parking to 2 car compact. convert from family to 2 unit dwelling.Details
horizontal extension to rear of (e) bldg on 1st & 2nd flrs. convert (e) 1st flr to additonal unit w/ 1 bedrm, study, kitchen & 1 bath. remodel (e) 2nd flr w/ 2 bedrms, study, kitchen & 2 bathrms. convert (e) 1 car parking to 2 car compact. convert from family to 2 unit dwelling. | $150,000 |
| Jan 8, 2008 | Completed final sign-off Dec 2008 | 1345 16th Av | work @ apartment #1, 2, 3, 4, 5, 6 only. 6 kitchen & 6 bath remodel.Details
work @ apartment #1, 2, 3, 4, 5, 6 only. 6 kitchen & 6 bath remodel. | $87,000 |
| Oct 2, 2007 | Completed final sign-off Apr 2008 | 63 Cumberland St | construct decks on the 2nd and 3rd floor in the rear yard. construct a 1-hr rated wall from greade to 42" above the 3rd fl deck on the east side.remove an (e)window in the 2nd, 3rd fl kitchen and intall doors at these locations.Details
construct decks on the 2nd and 3rd floor in the rear yard. construct a 1-hr rated wall from greade to 42" above the 3rd fl deck on the east side.remove an (e)window in the 2nd, 3rd fl kitchen and intall doors at these locations. | $30,000 |
| Aug 10, 2007 | Completed final sign-off Mar 2008 | 1345 16th Av | increase est. cost $40,000 pre bldg inspection for kitchen & bath remodel under pa 3200707187146Details
increase est. cost $40,000 pre bldg inspection for kitchen & bath remodel under pa 3200707187146 | $40,000 |
| Jul 18, 2007 | Completed final sign-off Mar 2008 | 1345 16th Av | kitchen and bath remodel in apt 7,8,9,10Details
kitchen and bath remodel in apt 7,8,9,10 | $60,000 |
| Jul 18, 2007 | Completed final sign-off Nov 2007 | 371 Arkansas St | kitchen and bath remodelDetails
kitchen and bath remodel | $15,000 |
| May 23, 2007 | Never finaled issued May 2007, no final | 1152 Green St | 3 kitchens and 3 bathroom remodel. no changes to bearing walls or windows.Details
3 kitchens and 3 bathroom remodel. no changes to bearing walls or windows. | $50,000 |
| Jun 28, 2006 | Expired or cancelled expired Mar 2010 | 1615 Diamond St | new rear yard deck and storage area that replace and extend (e) decks, interior work that remodels the (e) entry, living & dining areas, kitchen, upstairs bathroom and the master bedroom and master bathroom (horizontal & vertical addition)Details
new rear yard deck and storage area that replace and extend (e) decks, interior work that remodels the (e) entry, living & dining areas, kitchen, upstairs bathroom and the master bedroom and master bathroom (horizontal & vertical addition) | $150,000 |
| Jan 18, 2006 | Completed final sign-off Aug 2007 | 74 Aztec St | add a 3rd level to the (e) house for 2 new bedrooms & 1 bathroom. add a new interior & exterior stairway. renovate (e) kitchen, add a powder room & convert (e) bedroom into dinning room on (e) 2nd floor.Details
add a 3rd level to the (e) house for 2 new bedrooms & 1 bathroom. add a new interior & exterior stairway. renovate (e) kitchen, add a powder room & convert (e) bedroom into dinning room on (e) 2nd floor. | $305,000 |
| Jan 12, 2006 | Completed final sign-off Sep 2006 | 714 Broderick St | renovation of (e) kitchen including removal of 2 (e) structural post. renovation of (e) powder room & 2nd floor bath 2, finishes only.Details
renovation of (e) kitchen including removal of 2 (e) structural post. renovation of (e) powder room & 2nd floor bath 2, finishes only. | $55,000 |
| May 18, 2005 | Completed final sign-off Feb 2006 | 2245 Cabrillo St | apartment 3 , 2 , and 5. kitchen and bath remodel. no structuralDetails
apartment 3 , 2 , and 5. kitchen and bath remodel. no structural | $40,000 |
| Mar 17, 2005 | Completed final sign-off Feb 2006 | 210 Noe St | 2 kitchen & 2 bathroom remodel - both unitsDetails
2 kitchen & 2 bathroom remodel - both units | $40,000 |
| Mar 17, 2005 | Completed final sign-off Oct 2005 | 2245 Cabrillo St | bathroom and kitchen remodel in apt 1, 4, and 6Details
bathroom and kitchen remodel in apt 1, 4, and 6 | $50,000 |
| Feb 15, 2005 | Completed final sign-off May 2005 | 136 Corona St | 1 kitchen 2 bath rm remodel dry rotten repair for window 50 ft. replace sewer line interior paint.Details
1 kitchen 2 bath rm remodel dry rotten repair for window 50 ft. replace sewer line interior paint. | $26,000 |
| Jul 14, 2004 | Completed final sign-off Sep 2004 | 10 Pinehurst Wy | kitchen remodel. removed existing cabs plumbing fixture light fixtures install new cabs, plumbing fiDetails
kitchen remodel. removed existing cabs plumbing fixture light fixtures install new cabs, plumbing fi | $5,000 |
| Jul 1, 2004 | Completed final sign-off Apr 2005 | 584 Alvarado St | simple addition at rear renovation of kitchen relocated bathrm upgrade electrical (n) replacementDetails
simple addition at rear renovation of kitchen relocated bathrm upgrade electrical (n) replacement | $95,000 |
| Jun 11, 2004 | Completed final sign-off Jan 2005 | 491 Harkness Av | no window facing street- non-structural work- remodel kitchen & bathrm, replace cabs, replace (4) wiDetails
no window facing street- non-structural work- remodel kitchen & bathrm, replace cabs, replace (4) wi | $16,000 |
| Jan 24, 2002 | Completed final sign-off Jan 2002 | 41 Merced Av | kitchen remodelDetails
kitchen remodel | $5,000 |
| Aug 15, 2001 | Expired or cancelled expired Dec 2001 | 1707 23rd Av | remove (e) downstairs (basement) stove, hood, and kitchen sink altered by tenant.Details
remove (e) downstairs (basement) stove, hood, and kitchen sink altered by tenant. | $1,000 |
| Jul 30, 2001 | Completed final sign-off Mar 2003 | 1146 Stanyan St | rear yard extension, new bedrm on lower lev. enlarge kitchen/bkfast area & add deck on mid-lev.Details
rear yard extension, new bedrm on lower lev. enlarge kitchen/bkfast area & add deck on mid-lev. | $30,000 |
| Mar 21, 2001 | Completed final sign-off Jul 2001 | 282 Yerba Buena Av | kitchen & powder room remodelDetails
kitchen & powder room remodel | $10,000 |
| Feb 22, 2001 | Expired or cancelled expired Feb 2002 | 78 Seacliff Av | removed all plaster and lath. install insulation in wall & ceiling. remodel kitchen & all bath rms.iDetails
removed all plaster and lath. install insulation in wall & ceiling. remodel kitchen & all bath rms.i | $50,000 |
| Dec 27, 2000 | Never finaled issued Apr 2002, no final | 4250 22nd St | horiontal extension of three levelsof bldg, to expand a kitchen, roomDetails
horiontal extension of three levelsof bldg, to expand a kitchen, room | $250,000 |
| Jun 30, 2000 | Completed final sign-off Nov 2000 | 2200 Sacramento St | replace kitchen & bathroom,cabinets, sinks, appliances,countertop, flooring in #702 onlyDetails
replace kitchen & bathroom,cabinets, sinks, appliances,countertop, flooring in #702 only | $20,000 |
| Apr 6, 2000 | Completed final sign-off Jul 2000 | 1671 Mcallister St | kitchen remodelingDetails
kitchen remodeling | $10,000 |
| Apr 6, 2000 | Completed final sign-off Aug 2000 | 530 Moraga St | kitchen remodelingDetails
kitchen remodeling |