Block 3598, lot 036
63 Cumberland St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2007 | Completed final sign-off Apr 2008 | 63 Cumberland St | Royal Lyon Construction | construct decks on the 2nd and 3rd floor in the rear yard. construct a 1-hr rated wall from greade to 42" above the 3rd fl deck on the east side.remove an (e)window in the 2nd, 3rd fl kitchen and intall doors at these locations.Details
construct decks on the 2nd and 3rd floor in the rear yard. construct a 1-hr rated wall from greade to 42" above the 3rd fl deck on the east side.remove an (e)window in the 2nd, 3rd fl kitchen and intall doors at these locations. | $30,000 |
| Aug 13, 2007 | Completed final sign-off Mar 2008 | 67 Cumberland St | add a new powder room in the upper level of a 3 unit bldg. the existing closet and entry hall will be modified slightly to construct the new powder room. all work are interior. no change to bldg envelope or exterior.Details
add a new powder room in the upper level of a 3 unit bldg. the existing closet and entry hall will be modified slightly to construct the new powder room. all work are interior. no change to bldg envelope or exterior. | $19,400 | |
| Jun 6, 2006 | Completed final sign-off Jun 2006 | 63 Cumberland St | to comply with 3r physical inspection report. 3r-4396.Details
to comply with 3r physical inspection report. 3r-4396. | $200 | |
| Sep 30, 2005 | Completed final sign-off Mar 2006 | 63 Cumberland St | V And Company, Incorporated | 2 @ replace finishes in (e) 1 kitchen, 1 bath, 1 half bath. add @ 1st furnace. no structural work.Details
2 @ replace finishes in (e) 1 kitchen, 1 bath, 1 half bath. add @ 1st furnace. no structural work. | $35,000 |
| Feb 11, 2002 | Completed final sign-off Mar 2002 | 65 Cumberland St | V And Company, Incorporated | pull old cabinets, replace with new cabs & counters, new lino floor, no structural workDetails
pull old cabinets, replace with new cabs & counters, new lino floor, no structural work | $10,000 |
| Dec 3, 2001 | Completed final sign-off Jun 2002 | 67 Cumberland St | V And Company, Incorporated | kitchen and bathroom remodel at upper unit #67Details
kitchen and bathroom remodel at upper unit #67 | $80,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- V And Company, Incorporated (3), Royal Lyon Construction
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.