Block 2611, lot 002
18 Castro St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 2
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 2,374 sq ft
- Lot
- 2,730 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 16, 2022 | Completed final sign-off Dec 2022 | 18 Castro St | Centoni Restoration & Development | one bathroom in kind remodel. tile, faucets, fixtures, fan lighting, and cabinetry. non structural.Details
one bathroom in kind remodel. tile, faucets, fixtures, fan lighting, and cabinetry. non structural. | $25,000 |
| May 19, 2017 | Never finaled issued May 2017, no final | 18 Castro St | street spaceDetails
street space | ||
| Mar 21, 2017 | Never finaled issued Mar 2017, no final | 18 Castro St | street spaceDetails
street space | ||
| Feb 1, 2017 | Never finaled issued Feb 2017, no final | 18 Castro St | street space permitDetails
street space permit | ||
| Dec 23, 2016 | Never finaled issued Dec 2016, no final | 18 Castro St | street space permitDetails
street space permit | ||
| Nov 28, 2016 | Never finaled issued Nov 2016, no final | 18 Castro St | street space permitDetails
street space permit | ||
| Oct 18, 2016 | Completed final sign-off Jul 2017 | 18 Castro St | remodel bathroom and kitchen for lower unit.Details
remodel bathroom and kitchen for lower unit. | $20,000 | |
| Oct 13, 2016 | Completed final sign-off Jan 2017 | 18 Castro St | window replacment 8 total, 2 face street. no change in rough openings. to mactch existing fiberglass windows approved under permit 201302261000. u factor .32 max.Details
window replacment 8 total, 2 face street. no change in rough openings. to mactch existing fiberglass windows approved under permit 201302261000. u factor .32 max. | $5,550 | |
| Oct 13, 2016 | Completed final sign-off Dec 2016 | 18 Castro St | Cal-Quake Construction Inc | voluntary strengthening: anchoring w/ 5/8", a 4' o.c. exis sill plate of exter walls in sub/basement crawl space & bracing cripple walls in sub/basement with 1/2 plywood.Details
voluntary strengthening: anchoring w/ 5/8", a 4' o.c. exis sill plate of exter walls in sub/basement crawl space & bracing cripple walls in sub/basement with 1/2 plywood. | $11,400 |
| Feb 26, 2013 | Never finaled issued Feb 2013, no final | 18 Castro St | Armstrong Installation Service | window replacement, 6 total, 5 face the street. no change in rough openings, aluminum existing, fiberglass proposed. u factor =0.35Details
window replacement, 6 total, 5 face the street. no change in rough openings, aluminum existing, fiberglass proposed. u factor =0.35 | $9,000 |
| Mar 7, 2006 | Completed final sign-off Jun 2006 | 18 Castro St | G And M Inspection Company | report# 205-409 & # 205-409-s. g & m inspection co. item# 9, 13, 16, 17, 25, & 26. (6 items)Details
report# 205-409 & # 205-409-s. g & m inspection co. item# 9, 13, 16, 17, 25, & 26. (6 items) | $25,950 |
| Mar 1, 2002 | Expired or cancelled expired Sep 2002 | 18 Castro St | Dan Mccarthy Roofing | reroofingDetails
reroofing | $9,400 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Armstrong Installation Service, Cal-Quake Construction Inc, Centoni Restoration & Development, Dan Mccarthy Roofing, G And M Inspection Company
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.