Centoni Restoration & Development
- Based in
- San Francisco
- On San Francisco permits
- May 2009 to Oct 2026
- Last 24 months
- 15 permits filed
114 permits since 2000: 93 completed, 8 in progress, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
4 roof deck permits: 1 completed, 1 in progress, 2 expired or cancelled. Typically 232 days from filing to permit and 266 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 279 Diamond St | horizontal addition at rear 1st floor and 2nd floor, new roof deck over 1st floor, new stairs to rear yard.Details
horizontal addition at rear 1st floor and 2nd floor, new roof deck over 1st floor, new stairs to rear yard. | $100,000 |
| Dec 15, 2022 | Completed final sign-off Jan 2024 | 2576 Green St | replace (e) wood deck on sleepers with porcelian tile on pedestals roof deck, replace (e) metal guard rails with glass rails, replace (e) windows and door with new insulated windows and doors voluntary strengthening of 3rd fl.Details
replace (e) wood deck on sleepers with porcelian tile on pedestals roof deck, replace (e) metal guard rails with glass rails, replace (e) windows and door with new insulated windows and doors voluntary strengthening of 3rd fl. | $80,000 |
| Dec 12, 2014 | Expired or cancelled cancelled Dec 2017 | 1238 Masonic Av | single story rear addition for new unit approx 24'3" x 22'-0". new roof deck above rear addition. remove stair from 2nd floor to 4th floor.Details
single story rear addition for new unit approx 24'3" x 22'-0". new roof deck above rear addition. remove stair from 2nd floor to 4th floor. | $100,000 |
| May 23, 2014 | Expired or cancelled cancelled Jan 2019 | 339 Lincoln Wy | rear horizontal single story addition with roof deck. addition consists of two bedrooms and one bath.Details
rear horizontal single story addition with roof deck. addition consists of two bedrooms and one bath. | $80,000 |