Back to kitchen remodel contractors
Centoni Restoration & Development
- Based in
- San Francisco
- On San Francisco permits
- May 2009 to Oct 2026
- Last 24 months
- 15 permits filed
114 permits since 2000: 93 completed, 8 in progress, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
40 kitchen remodel permits: 36 completed, 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 205 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 25, 2025 | Completed final sign-off Apr 2026 | 1120 Elm St | bathroom renovation, widen opening between living room and kitchen, voluntary strengthening of foundation system, voluntary seismic strenghthening of foundation system. voluntary siesmic strengthening of basement walls.Details
bathroom renovation, widen opening between living room and kitchen, voluntary strengthening of foundation system, voluntary seismic strenghthening of foundation system. voluntary siesmic strengthening of basement walls. | $80,000 |
| Jun 20, 2025 | Completed final sign-off Mar 2026 | 260 29th St | renovate (e) kitchen in kind. new cabinets. stone counter tops, appliances, electrical & plumbing up to codeDetails
renovate (e) kitchen in kind. new cabinets. stone counter tops, appliances, electrical & plumbing up to code | $80,000 |
| Apr 11, 2025 | Expired or cancelled withdrawn Jun 2025 | 260 29th St | relocation of 2nd/fl: bathroom, kitchen renovation, relocation of skylight and solar tubes, replacement of fixtures,tiles, and finishes, in first floor bathroom.Details
relocation of 2nd/fl: bathroom, kitchen renovation, relocation of skylight and solar tubes, replacement of fixtures,tiles, and finishes, in first floor bathroom. | $98,500 |
| Feb 7, 2025 | Completed final sign-off Aug 2025 | 538 Baker St | modification of an opening between kitchen & dining room. reducing opening width & increase opening height. no work at exterior wallsDetails
modification of an opening between kitchen & dining room. reducing opening width & increase opening height. no work at exterior walls | $7,000 |
| May 13, 2024 | Completed final sign-off Aug 2024 | 662 Cole St | in-kind kitchen renovation. new cabinets, appliances, lighting, plumbing fixtures. no modification to walls, structure.Details
in-kind kitchen renovation. new cabinets, appliances, lighting, plumbing fixtures. no modification to walls, structure. | $75,000 |
| Feb 3, 2023 | Completed final sign-off Dec 2023 | 1360 Fulton St | kitchen & laundry room renovation; relocating rear door & window; alteration to ground floor deck @ backyard; in addition to the project, includes voluntary seismic strengthening to gl1 & gl1.6 of lower unit. revision to reduce rear deck to landing.Details
kitchen & laundry room renovation; relocating rear door & window; alteration to ground floor deck @ backyard; in addition to the project, includes voluntary seismic strengthening to gl1 & gl1.6 of lower unit. revision to reduce rear deck to landing. | $80,000 |
| Aug 30, 2022 | Completed final sign-off Dec 2022 | 79 Gaviota Wy | in-kind kitchen remodel = new cabinets, appliances, lighting, tile + counter top. non structural.Details
in-kind kitchen remodel = new cabinets, appliances, lighting, tile + counter top. non structural. | $45,000 |
| Aug 1, 2022 | Completed final sign-off Jul 2023 | 1614 Fulton St | bathroom addition, kitchen renovation, removal or interior wall @ 1/f unitDetails
bathroom addition, kitchen renovation, removal or interior wall @ 1/f unit | $50,000 |
| Aug 1, 2022 | Completed final sign-off May 2023 | 3927 Cesar Chavez St | bathroom & kitchen renovation @3rd flDetails
bathroom & kitchen renovation @3rd fl | $60,000 |
| Apr 19, 2022 | Completed final sign-off Oct 2022 | 6418 California St | remodel one (e) kitchen in kind. new cabinets, appliances, lighting & flooring. no change to existing layout.Details
remodel one (e) kitchen in kind. new cabinets, appliances, lighting & flooring. no change to existing layout. | $50,000 |
| Mar 8, 2022 | Completed final sign-off Dec 2022 | 15 Loyola Tr | lower unit. kitchen renovation, powder room addition and reinforcement of rear mud room.Details
lower unit. kitchen renovation, powder room addition and reinforcement of rear mud room. | $180,000 |
| Mar 8, 2022 | Completed final sign-off Dec 2022 | 17 Loyola Tr | kitchen renovation, post & footing addition. upper unit.Details
kitchen renovation, post & footing addition. upper unit. | $90,000 |
| Aug 26, 2021 | Completed final sign-off Oct 2022 | 1618 Fulton St | interior renovation on 2nd fl consisting of new laundry closet and kitchen relocationDetails
interior renovation on 2nd fl consisting of new laundry closet and kitchen relocation | $50,000 |
| May 10, 2021 | Completed final sign-off Oct 2021 | 82 El Sereno Ct | remodel kitchen, in kind. new appliances, cabinets, lighting, tile, countertop.Details
remodel kitchen, in kind. new appliances, cabinets, lighting, tile, countertop. | $50,000 |
| Sep 17, 2020 | Completed final sign-off Apr 2021 | 533 Noe St | kitchen remodel in-kind. new cabinets, appliances, counter top, flooring.Details
kitchen remodel in-kind. new cabinets, appliances, counter top, flooring. | $7,500 |
| Aug 17, 2020 | Completed final sign-off Apr 2021 | 1807 Greenwich St | kitchen remodel in kind. new cabinets, counter top, appliances & lighting.Details
kitchen remodel in kind. new cabinets, counter top, appliances & lighting. | $75,000 |
| Dec 11, 2018 | Completed final sign-off Jun 2019 | 432 Lawton St | interior renovation of entry floor including addition of powder room, kitchen renovation, rear sun room renovation, repair of framing deficiencies and voluntary strengthening.Details
interior renovation of entry floor including addition of powder room, kitchen renovation, rear sun room renovation, repair of framing deficiencies and voluntary strengthening. | $150,000 |
| Feb 23, 2018 | Completed final sign-off Jan 2019 | 2276 Fulton St | interior revonation at 1/f and basement. new masterbedroom & bathroom at basement level. first floor kitchen, bathroom, laundry, bedroom & living room renovation. replace (4) windows at basement level in kind at front facade wood single &(1) window at 1/f.replace with compliant window for egressDetails
interior revonation at 1/f and basement. new masterbedroom & bathroom at basement level. first floor kitchen, bathroom, laundry, bedroom & living room renovation. replace (4) windows at basement level in kind at front facade wood single &(1) window at 1/f.replace with compliant window for egress | $125,000 |
| Jul 11, 2017 | Completed final sign-off Feb 2018 | 2093 Golden Gate Av | infill of interior lightwell for new half bath, renovation of existing bathroom and kitchen. no exterior alteration.Details
infill of interior lightwell for new half bath, renovation of existing bathroom and kitchen. no exterior alteration. | $50,000 |
| Nov 18, 2016 | Completed final sign-off Aug 2017 | 1550 Shrader St | remodel kitchen & bathroom, in kind. new tile, vanity, toilet , light and fan.Details
remodel kitchen & bathroom, in kind. new tile, vanity, toilet , light and fan. | $8,000 |
| Jun 23, 2016 | Completed final sign-off Jan 2018 | 280 Divisadero St | interior renovation including bathroom expansion and new utility closet at basement level; 1st floor - kitchen renovation; 2nd floor - two bathroom remodel and new closet space; 3rd floor - bathroom remodel. no exterior workDetails
interior renovation including bathroom expansion and new utility closet at basement level; 1st floor - kitchen renovation; 2nd floor - two bathroom remodel and new closet space; 3rd floor - bathroom remodel. no exterior work | $150,000 |
| Mar 4, 2016 | Completed final sign-off Nov 2016 | 31 Claremont Bl | interior renovation at upper level and strengthening of sun room. remodel kitchen and two bathrooms.Details
interior renovation at upper level and strengthening of sun room. remodel kitchen and two bathrooms. | $50,000 |
| Jun 9, 2015 | Completed final sign-off Mar 2016 | 1225 Hayes St | remodel kitchen and bathroom. recofigure kitchen and family room per plan.Details
remodel kitchen and bathroom. recofigure kitchen and family room per plan. | $20,000 |
| Jun 2, 2015 | Never finaled issued Jun 2015, no final | 2484 21st Av | relocate bearing wall/beam between kitchen and dining room.Details
relocate bearing wall/beam between kitchen and dining room. | $8,000 |
| May 5, 2015 | Completed final sign-off Sep 2015 | 2484 21st Av | remodel kitchen & bathroom; to comply with cec150.0(k)3 & n5Details
remodel kitchen & bathroom; to comply with cec150.0(k)3 & n5 | $50,000 |
| Mar 3, 2015 | Completed final sign-off Dec 2015 | 1230 04th Av | unit #1230: kitchen, bath,dining, and living remodel.Details
unit #1230: kitchen, bath,dining, and living remodel. | $40,000 |
| Feb 2, 2015 | Expired or cancelled expired Feb 2017 | 436 Hamilton St | revision to pa 201412314763 work not visible from street - remove & replace, inkind kitchen window, remove and replace windows with patio door install, firerated door & garageDetails
revision to pa 201412314763 work not visible from street - remove & replace, inkind kitchen window, remove and replace windows with patio door install, firerated door & garage | $3,500 |
| Dec 31, 2014 | Expired or cancelled expired Feb 2017 | 436 Hamilton St | kitchen remodel in kind; new cabinets, floorings, tiles, app;iance and lighting. ; to comply with cec150.0(k)3Details
kitchen remodel in kind; new cabinets, floorings, tiles, app;iance and lighting. ; to comply with cec150.0(k)3 | $20,000 |
| Aug 7, 2014 | Completed final sign-off Jun 2015 | 1458 15th Av | add master bed & bathroom at 1st floor. infill lightwell at 2nd floor, remodel kitchen & bathroom.Details
add master bed & bathroom at 1st floor. infill lightwell at 2nd floor, remodel kitchen & bathroom. | $100,000 |
| Jun 11, 2014 | Completed final sign-off Oct 2014 | 134 Grattan St | kitchen remodel, bedroom modification, add 2 closets, building per planDetails
kitchen remodel, bedroom modification, add 2 closets, building per plan | $40,000 |
| Apr 17, 2014 | Completed final sign-off Jul 2014 | 590 38th Av | revision to appl #201403191086: structural modification to wall opening at 2nd floor between dining room & kitchen.Details
revision to appl #201403191086: structural modification to wall opening at 2nd floor between dining room & kitchen. | $2,000 |
| Apr 3, 2014 | Completed final sign-off Aug 2014 | 66 Cleary Ct | #703 - cosmetic remodel of kitchen, 2 baths, in kind, new tiles, countertop , cabinets, and fixtures.Details
#703 - cosmetic remodel of kitchen, 2 baths, in kind, new tiles, countertop , cabinets, and fixtures. | $35,000 |
| Mar 19, 2014 | Completed final sign-off Jul 2014 | 590 38th Av | kitchen remodel in kind, new cabinets, appliances and counter topDetails
kitchen remodel in kind, new cabinets, appliances and counter top | $12,000 |
| Nov 15, 2013 | Completed final sign-off Jul 2014 | 123 Lincoln Wy | interior remodel. remove existing closet and add new bath at rear e bedroom. add new closet, kitchen remodel, enlarge existing opening between kitchen and nook at non bearing wall, new closet for washer and dryer.Details
interior remodel. remove existing closet and add new bath at rear e bedroom. add new closet, kitchen remodel, enlarge existing opening between kitchen and nook at non bearing wall, new closet for washer and dryer. | $15,000 |
| Oct 18, 2013 | Completed final sign-off Feb 2014 | 900 Green St | #200 - remodel existing kitchen in kind. install cabinets, countertop, fixtures, appliances & lightingDetails
#200 - remodel existing kitchen in kind. install cabinets, countertop, fixtures, appliances & lighting | $25,000 |
| Aug 9, 2013 | Completed final sign-off Nov 2013 | 1024 Page St | unit 2- kitchen remodel; install new cabinets, counter to new appliances, sink, fixtures and lighting. no structural . to comply with cec150(k)6Details
unit 2- kitchen remodel; install new cabinets, counter to new appliances, sink, fixtures and lighting. no structural . to comply with cec150(k)6 | $30,000 |
| Jun 26, 2013 | Completed final sign-off Aug 2013 | 56 Winfield St | kitchen remodel of existing kitchen replace cabinets counter top , fixtures and appliances, no structural changes, comply with cec 150k 8Details
kitchen remodel of existing kitchen replace cabinets counter top , fixtures and appliances, no structural changes, comply with cec 150k 8 | $30,000 |
| Jun 19, 2013 | Completed final sign-off Nov 2013 | 32 Nido Av | kitchen remodel at existing kitchen: replace cabinets, counter top, fixtures, appliances. no structural changes, no new wall and no existing wall relocation. kitchen remodel shall comply with cec 150(k)8.Details
kitchen remodel at existing kitchen: replace cabinets, counter top, fixtures, appliances. no structural changes, no new wall and no existing wall relocation. kitchen remodel shall comply with cec 150(k)8. | $30,000 |
| Apr 12, 2013 | Completed final sign-off Jan 2014 | 245 Central Av | kitchen remodel, replace cabinet, appliances counter top - no structural changes. no lighting changes.Details
kitchen remodel, replace cabinet, appliances counter top - no structural changes. no lighting changes. | $30,000 |
| May 28, 2009 | Completed final sign-off Nov 2009 | 1844 Stockton St | remodel (1) kitchen-replace existing cabinets & appliances. remodel (1) bathroom-replace existing tub, sink & shower, no structural changes (in-kind).Details
remodel (1) kitchen-replace existing cabinets & appliances. remodel (1) bathroom-replace existing tub, sink & shower, no structural changes (in-kind). | $18,000 |