Block 6555, lot 040
447 Clipper St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 2 bathrooms
- Building
- 2,514 sq ft
- Lot
- 2,848 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 11, 2023 | Completed final sign-off Apr 2026 | 447 Clipper St | Brady Construction Inc | new subterranean garage. no increase to habitable area.Details
new subterranean garage. no increase to habitable area. | $66,500 |
| Jun 10, 2014 | Completed final sign-off Dec 2014 | 447 Clipper St | Aotearoa Construction | remove an existing wall between kitchen and dinning roomDetails
remove an existing wall between kitchen and dinning room | $15,000 |
| Apr 26, 2012 | Never finaled issued Apr 2012, no final | 447 Clipper St | street space.Details
street space. | ||
| Jan 10, 2012 | Completed final sign-off Jul 2012 | 447 Clipper St | Aran Construction | revision to appl #201103021253 - submitted shotcrete drawings with placement of rebars per engineer in compliance with 106.33. all shotcrete placed was 4000 psi per engineer.Details
revision to appl #201103021253 - submitted shotcrete drawings with placement of rebars per engineer in compliance with 106.33. all shotcrete placed was 4000 psi per engineer. | |
| Mar 2, 2011 | Completed final sign-off Jul 2012 | 447 Clipper St | 2/fl addition of 82.5 feet 56 of which is replacement 26.5 ft of which is new. new comunication stair betw 2nd & 1st story, kitchen remodel replace fountaion & excavation of 1/fl level. 1/fl new condition family room, lalundry/bathroom guest bedroom &closet new assoc plumbing & elec & mech.Details
2/fl addition of 82.5 feet 56 of which is replacement 26.5 ft of which is new. new comunication stair betw 2nd & 1st story, kitchen remodel replace fountaion & excavation of 1/fl level. 1/fl new condition family room, lalundry/bathroom guest bedroom &closet new assoc plumbing & elec & mech. | $250,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.