Expert Design Builders
- Based in
- Oakland
- On San Francisco permits
- Jun 2014 to Mar 2017
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 17, 2017 | Completed final sign-off Sep 2017 | 3469 19th St | limited renovation to condo in the mission district proposed alterations include conversion of (e) den into bathroom and addition of hallway closetDetails
limited renovation to condo in the mission district proposed alterations include conversion of (e) den into bathroom and addition of hallway closet | $25,000 |
| Jun 25, 2015 | Completed final sign-off Dec 2015 | 2250 Jerrold Av | unit#13 - revision to appl #2014.0627.9861 - add interior sound insulating walls + ceiling at 2nd floor residential area. add shear wall, remove winodw, replace door (not visible from street). n/a maher ordinanceDetails
unit#13 - revision to appl #2014.0627.9861 - add interior sound insulating walls + ceiling at 2nd floor residential area. add shear wall, remove winodw, replace door (not visible from street). n/a maher ordinance | $7,000 |
| Jun 27, 2014 | Completed final sign-off Dec 2015 | 2250 Jerrold Av | add accessory dwelling unit within existing artist studio. requires certificate of final completion & occupancy (cfc) for change of use from b to b/r-3. planning considered accessory unit. bldg considered as mixed use, not as live/work. all work within unit #13. (n) windows. interior remodel.Details
add accessory dwelling unit within existing artist studio. requires certificate of final completion & occupancy (cfc) for change of use from b to b/r-3. planning considered accessory unit. bldg considered as mixed use, not as live/work. all work within unit #13. (n) windows. interior remodel. | $90,000 |