Back to kitchen remodel contractors
Ncr Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Oct 2000 to Feb 2025
- Last 24 months
- 1 permit filed
94 permits since 2000: 67 completed, 1 in progress, 18 never finaled, 8 expired or cancelled.
Of the 18 never-finaled permits, 3 are 5 to 10 years old, 15 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 9 completed, 1 never finaled, 1 expired or cancelled. Typically 102 days from filing to permit and 227 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 20, 2023 | Completed final sign-off Sep 2023 | 328 Tehama St | units 408/508/608/708/808: interior ti, upgrade kitchen & bathrooms for (5)accesible units to code, replace kitchen counter tops, add removable cabinets for workspace, expand roll-in showers, change swing doors to pocket doors.Details
units 408/508/608/708/808: interior ti, upgrade kitchen & bathrooms for (5)accesible units to code, replace kitchen counter tops, add removable cabinets for workspace, expand roll-in showers, change swing doors to pocket doors. | $155,000 |
| May 10, 2017 | Completed final sign-off Feb 2018 | 1700 Sutter St | renovation of a cummunity kitchen & upgrade nearby restrooms for accessibility per 20% rule. casework & finishes to be repalced in scope of work. mech, elec, plbg & fire sprinkler work to be deferred submittals under separate permit.Details
renovation of a cummunity kitchen & upgrade nearby restrooms for accessibility per 20% rule. casework & finishes to be repalced in scope of work. mech, elec, plbg & fire sprinkler work to be deferred submittals under separate permit. | $180,800 |
| Feb 14, 2017 | Expired or cancelled cancelled Jan 2026 | 2750 Geary Bl | remodel and relocation of (e) kitchen, demolish (e) kitchen, replace resident rooms and bath into former kitchen space. demolish (e) dumbwaiter and renovate (e) nurse station. revise stair and closet area for accessible ramp. reuse existing kitchen hood, new duct to roof. maher naDetails
remodel and relocation of (e) kitchen, demolish (e) kitchen, replace resident rooms and bath into former kitchen space. demolish (e) dumbwaiter and renovate (e) nurse station. revise stair and closet area for accessible ramp. reuse existing kitchen hood, new duct to roof. maher na | $155,000 |
| Jan 29, 2016 | Completed final sign-off Mar 2026 | 241 06th St | accesibility improvements, unit kitchen upgrades, window replacement, light fixture replacement, exterior paint, bathroom ventilation upgrade. emergency generator work (replacement and enclosure) for reference only and to be separate submittal.Details
accesibility improvements, unit kitchen upgrades, window replacement, light fixture replacement, exterior paint, bathroom ventilation upgrade. emergency generator work (replacement and enclosure) for reference only and to be separate submittal. | $325,000 |
| Jun 25, 2014 | Completed final sign-off Apr 2017 | 1441 Powell St | replace window, skylight, sliding door thru-out, new ext paint, int finish upgrades, kitchen casework, shower head, valve & bath lavatory replace @ all units, various ada upgrades incl (5) baths, new roofing & guardrails thru-out,limited mech, plbg upgrades incl ventilation,backup boiler, generatorDetails
replace window, skylight, sliding door thru-out, new ext paint, int finish upgrades, kitchen casework, shower head, valve & bath lavatory replace @ all units, various ada upgrades incl (5) baths, new roofing & guardrails thru-out,limited mech, plbg upgrades incl ventilation,backup boiler, generator | $2,500,000 |
| Apr 29, 2014 | Never finaled issued Apr 2014, no final | 115 Gates St | replacement of fixtures and finishes at bathroom and kitchen.Details
replacement of fixtures and finishes at bathroom and kitchen. | $20,000 |
| Jan 21, 2010 | Completed final sign-off May 2014 | 1095 Mission St | replace building interior finishes and residential windows in kind. upgrade unit kitchenettes & heaters, create a basement community room and recycling area.Details
replace building interior finishes and residential windows in kind. upgrade unit kitchenettes & heaters, create a basement community room and recycling area. | $2,100,000 |
| Sep 24, 2009 | Completed final sign-off Mar 2010 | 1607 Howard St | kitchen & bathroom remodel, window replacement @ front, water heater & space heater replacement.Details
kitchen & bathroom remodel, window replacement @ front, water heater & space heater replacement. | $47,000 |
| Jan 9, 2009 | Completed final sign-off Dec 2009 | 1038 Post St | change use to youth center. t.i. to g/f & 2/f. work includes new accessible restrooms, staff kitchen, and soundroom on g/f, new acessible restrooms, offices, conference room on 2/fr, stairway upgrade and new limited use/access elevator for building. new mech. system upgrade under seperate permit.Details
change use to youth center. t.i. to g/f & 2/f. work includes new accessible restrooms, staff kitchen, and soundroom on g/f, new acessible restrooms, offices, conference room on 2/fr, stairway upgrade and new limited use/access elevator for building. new mech. system upgrade under seperate permit. | $300,000 |
| Mar 24, 2005 | Completed final sign-off Jul 2006 | 1010 Mission St | additional work to approval t.i permit. includes non structural partitions & kitchen cabinets.orgDetails
additional work to approval t.i permit. includes non structural partitions & kitchen cabinets.org | $35,000 |
| Oct 13, 2000 | Completed final sign-off Jul 2001 | 220 Pierce St | maintenance repair,replace all windows in kind,reroof, bathroom & kitchen fans,dr hardwre,ext sidingDetails
maintenance repair,replace all windows in kind,reroof, bathroom & kitchen fans,dr hardwre,ext siding | $96,000 |