Jefferson Scott Shewry
- Listed as
- authorized agent-others, contractor
- Firm
- High Band Construction Inc
- Based in
- Brentwood
- On San Francisco permits
- Jan 2022 to Aug 2026
21 permits since 2000 (contractor on 21 permits, authorized agent-others on 2 permits): 14 completed, 7 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 27, 2026 | In progress issued Sep 2026 | 491 Haight St | High Band Construction Inc | t-mobile: revision to bpa#202403278713. revise pts cabinet specs. revise antenna mast mounting details. no change to approved antennas, rf report, batteries,electricalDetails
t-mobile: revision to bpa#202403278713. revise pts cabinet specs. revise antenna mast mounting details. no change to approved antennas, rf report, batteries,electrical | |
| Mar 26, 2026 | In progress issued Sep 2026 | 589 Howard St | High Band Construction Inc | at&t: modification of an existing telecommunications facility consisting: r/r 3 antennas within e frp radomes; r/r 3 rru's; remove (20) 155 ah & (12) 180 ah batteries; install (20) 210 ah batteries in e power plant & battery rack; install (3) 50 amp dc breakers; 10 converters; 1 - 58v upgradeDetails
at&t: modification of an existing telecommunications facility consisting: r/r 3 antennas within e frp radomes; r/r 3 rru's; remove (20) 155 ah & (12) 180 ah batteries; install (20) 210 ah batteries in e power plant & battery rack; install (3) 50 amp dc breakers; 10 converters; 1 - 58v upgrade | $49,126 |
| Feb 18, 2026 | In progress issued Sep 2026 | 2121 19th Av | High Band Construction Inc | at&t: modification of an unmanned wireless facility. remove/replace 3 antennas, 3 rrus, 1 power plant, 1 batther cabinet. remove 24 batteries and install 20 new 210ah batteries. r/r converter and rectifiers. install (3) 50a dc breakers. install rf safety signs, stripping, barricades per eme report.Details
at&t: modification of an unmanned wireless facility. remove/replace 3 antennas, 3 rrus, 1 power plant, 1 batther cabinet. remove 24 batteries and install 20 new 210ah batteries. r/r converter and rectifiers. install (3) 50a dc breakers. install rf safety signs, stripping, barricades per eme report. | $80,325 |
| Dec 17, 2025 | Completed final sign-off Oct 2026 | 900 Palou Av | High Band Construction Inc | at&t modifciation of (e) wireless facility consisting of: lower 3 and add 3 new antennas w/mounts; power/fiber trunks. r/r 1 power plant; remove 1 in active cab; r/r rectifiers & converters w/new 10 rectifiers & 8 convertrs; 1 vertiv esure: r/r 20 batteries; install 1 15a & (3) 50 amp dc breakers,Details
at&t modifciation of (e) wireless facility consisting of: lower 3 and add 3 new antennas w/mounts; power/fiber trunks. r/r 1 power plant; remove 1 in active cab; r/r rectifiers & converters w/new 10 rectifiers & 8 convertrs; 1 vertiv esure: r/r 20 batteries; install 1 15a & (3) 50 amp dc breakers, | $127,100 |
| Dec 3, 2025 | In progress issued Jun 2026 | 1701 Jerrold Av | High Band Construction Inc | at&t: modification of an (e) unmanned wireless facility. remove and replace 3 rrus. install (3) air antennas, angle mounts, pipe mounts. rotate alpha & beta sectors. remove (1) infinity pp, rectifiers and converters. r/r 20 batteries. install new rectifiers, converters, (1) 15amp, (6) 50amp dcDetails
at&t: modification of an (e) unmanned wireless facility. remove and replace 3 rrus. install (3) air antennas, angle mounts, pipe mounts. rotate alpha & beta sectors. remove (1) infinity pp, rectifiers and converters. r/r 20 batteries. install new rectifiers, converters, (1) 15amp, (6) 50amp dc | $84,000 |
| Sep 30, 2025 | Completed final sign-off Apr 2026 | 1250 Columbus Av | High Band Construction Inc | at&t modification of (e) wireless facility consisting: r/r 3 antennas; r/r (3) rrus; remove (1) infinity power plant; 1 battery rack 2 converters 7 rectifiers (1) 225 cabinet; (20) 190 ah batteries. install (1) vertiv 7100 power plant; 1 battery rack; 11 converters; 1 esure converters.Details
at&t modification of (e) wireless facility consisting: r/r 3 antennas; r/r (3) rrus; remove (1) infinity power plant; 1 battery rack 2 converters 7 rectifiers (1) 225 cabinet; (20) 190 ah batteries. install (1) vertiv 7100 power plant; 1 battery rack; 11 converters; 1 esure converters. | $44,300 |
| Sep 11, 2025 | In progress issued Mar 2026 | 251 Barneveld Av | High Band Construction Inc | at&t modification of (e) wireless facility consisting of: r/r (3) antennas & (3) rrus; remove infantry power plant; rectifiers remove 3106 cabinet; relocate (12) batteries in new pp; add (1) vertiv pp w/(12) 50v converters; (1) rectifier convertor shelf; (13) 48v rectifiers; (6) 50amp dc breakers;Details
at&t modification of (e) wireless facility consisting of: r/r (3) antennas & (3) rrus; remove infantry power plant; rectifiers remove 3106 cabinet; relocate (12) batteries in new pp; add (1) vertiv pp w/(12) 50v converters; (1) rectifier convertor shelf; (13) 48v rectifiers; (6) 50amp dc breakers; | $80,300 |
| Sep 10, 2025 | In progress issued Sep 2026 | 1881 Post St | High Band Construction Inc | at&t modification of an existing wireless facility consisting of removal six rru's; add 3 rru & 3 air antennas; lower 3 air 6449 antennas; install rf signage, stripping & barricades; r/r one power plant; r/r 20 batteries; r/r rectifiers; install 11 -58v converters; install one 15 amp dcDetails
at&t modification of an existing wireless facility consisting of removal six rru's; add 3 rru & 3 air antennas; lower 3 air 6449 antennas; install rf signage, stripping & barricades; r/r one power plant; r/r 20 batteries; r/r rectifiers; install 11 -58v converters; install one 15 amp dc | $80,200 |
| Aug 21, 2025 | Completed final sign-off Apr 2026 | 2242 Polk St | High Band Construction Inc | modification of (e) att wireless facility to consisting of relocate (3) antennas & add (3)withing (e) frp radome; r/r(3)rru's. remove(1) infinety power plant;install(1)netsure conversion power plant;(13)rectifies;(12)58v converters;(1)expansion shelf;(1)15amp+(6)50amp dc breakers.(1)g4 bbu;(1)dc12Details
modification of (e) att wireless facility to consisting of relocate (3) antennas & add (3)withing (e) frp radome; r/r(3)rru's. remove(1) infinety power plant;install(1)netsure conversion power plant;(13)rectifies;(12)58v converters;(1)expansion shelf;(1)15amp+(6)50amp dc breakers.(1)g4 bbu;(1)dc12 | $35,000 |
| Mar 27, 2024 | In progress issued May 2026 | 491 Haight St | High Band Construction Inc | t-mobile - remove (e) antenna and install (6) new antenna w/in (n) radome; install (n) 200amp panel and (12) new batteries inside (n) cabinetDetails
t-mobile - remove (e) antenna and install (6) new antenna w/in (n) radome; install (n) 200amp panel and (12) new batteries inside (n) cabinet | $150,000 |
| Feb 8, 2023 | Completed final sign-off Sep 2024 | 15 Marina Bl | High Band Construction Inc | at&t mobility unmanned telecom facility modification consisting remove & replace (3) (e) omi antennas, install new rf safety signs & stripping install (2) new rrus at equipment area install back-to-back rru mount on (e) unistruct at equipment area and (6) new 1/2" coax cablesDetails
at&t mobility unmanned telecom facility modification consisting remove & replace (3) (e) omi antennas, install new rf safety signs & stripping install (2) new rrus at equipment area install back-to-back rru mount on (e) unistruct at equipment area and (6) new 1/2" coax cables | $25,000 |
| Nov 17, 2022 | Completed final sign-off Dec 2022 | 678 Portola Dr | High Band Construction Inc | revision to pa# 2022-0310-9643: change of scope to remove not install proposed cabinet in detail 3/a-2 and detail 2/a-5. reduction of work. remove cabinet & special inspection requirements.Details
revision to pa# 2022-0310-9643: change of scope to remove not install proposed cabinet in detail 3/a-2 and detail 2/a-5. reduction of work. remove cabinet & special inspection requirements. | |
| Sep 26, 2022 | Completed final sign-off Apr 2023 | 725 Greenwich St | High Band Construction Inc | remove and replace 6 antennas, remove 1 antenna shroud and replace 6 new rear antenna shrouds, 4 kicker at sec c, 3 dc6 awg dc power trunks,add 3 dc6 surge suppressors, remove 1 duw from e purcell caabin, remove 4 155h lead batteries from e cabinet. install rectifiers e cab and new rf safety signs,Details
remove and replace 6 antennas, remove 1 antenna shroud and replace 6 new rear antenna shrouds, 4 kicker at sec c, 3 dc6 awg dc power trunks,add 3 dc6 surge suppressors, remove 1 duw from e purcell caabin, remove 4 155h lead batteries from e cabinet. install rectifiers e cab and new rf safety signs, | $55,000 |
| Jul 13, 2022 | Completed final sign-off May 2023 | 1745 Market St | High Band Construction Inc | att: remove (6) (e) antennas ; install (6) (n) antennas, (3) (n) rrus; remove (16) (e) batteries; install (16) (n) batteries.Details
att: remove (6) (e) antennas ; install (6) (n) antennas, (3) (n) rrus; remove (16) (e) batteries; install (16) (n) batteries. | $45,000 |
| Jun 28, 2022 | Completed final sign-off Feb 2023 | 66 Yerba Buena Rd | High Band Construction Inc | att: remove (1) (e) antena: install (1) (n) antenna; remove (1) (e) rru; install other small equipment no change to (e) batteriesDetails
att: remove (1) (e) antena: install (1) (n) antenna; remove (1) (e) rru; install other small equipment no change to (e) batteries | $26,000 |
| Jun 9, 2022 | Completed final sign-off Jan 2023 | 899 Hyde St | High Band Construction Inc | att modification of an (e) unmanned telecom facility, remove + replace (6) panel antennas mounted behind (e) frp extension + 3'7" extension. remove + replace (3) pipe masts. install new rf safety signs, barricades + stripping at rooftop.Details
att modification of an (e) unmanned telecom facility, remove + replace (6) panel antennas mounted behind (e) frp extension + 3'7" extension. remove + replace (3) pipe masts. install new rf safety signs, barricades + stripping at rooftop. | $35,000 |
| Apr 28, 2022 | Completed final sign-off Mar 2023 | 555 De Haro St | High Band Construction Inc | at&t modification unmanned telecom facility. remove/replace (6)panel atennas w/in (e)frp faux vents, remove (3)ruus's/(3)(e) #8awg dc power trunks, install (3)new #4awg dc power trunks, (3)new fiber truns, new rf safety signs, barriers/tripping @ rooftop. install (4)new rectifiers in (e)dcpp &Details
at&t modification unmanned telecom facility. remove/replace (6)panel atennas w/in (e)frp faux vents, remove (3)ruus's/(3)(e) #8awg dc power trunks, install (3)new #4awg dc power trunks, (3)new fiber truns, new rf safety signs, barriers/tripping @ rooftop. install (4)new rectifiers in (e)dcpp & | $45,000 |
| Mar 24, 2022 | Completed final sign-off Dec 2022 | 2300 Chestnut St | High Band Construction Inc | at&t: remove and replace 9 antennas. remove 12 rrus and replace with 6 rrus. remove and replace 4 frp radomes at sector a and c. remove and replace 2 cabinets. install new rf and caution signs, batteries and stripping.Details
at&t: remove and replace 9 antennas. remove 12 rrus and replace with 6 rrus. remove and replace 4 frp radomes at sector a and c. remove and replace 2 cabinets. install new rf and caution signs, batteries and stripping. | $45,000 |
| Mar 10, 2022 | Completed final sign-off Jun 2025 | 678 Portola Dr | High Band Construction Inc | at&t: remove + install 3 antennas. install 1 new dc6squid, rf safety signs, burriers/stripping. install 4 new 175ah batteries in (e) cabinet. 2 new rectifiers in (e) dcpp, 1 new 6648 baseband in new fix21 v2 cabinet and 1 1/4" fiber trunk.Details
at&t: remove + install 3 antennas. install 1 new dc6squid, rf safety signs, burriers/stripping. install 4 new 175ah batteries in (e) cabinet. 2 new rectifiers in (e) dcpp, 1 new 6648 baseband in new fix21 v2 cabinet and 1 1/4" fiber trunk. | $45,000 |
| Feb 28, 2022 | Completed final sign-off Feb 2023 | 670 04th St | High Band Construction Inc | at&t modification of an unmanned telecom facility consisting of: remove + replace 6 panel antennas behind (e) frp / modification / extend, 6 rrus + relocate 3 rrus, 1 power trunk & 20 batteries within (e) dcpp + rack. install 4 rectifiers in (e) dcpp. 1 twin diplex each sector + 1 filter per sector.Details
at&t modification of an unmanned telecom facility consisting of: remove + replace 6 panel antennas behind (e) frp / modification / extend, 6 rrus + relocate 3 rrus, 1 power trunk & 20 batteries within (e) dcpp + rack. install 4 rectifiers in (e) dcpp. 1 twin diplex each sector + 1 filter per sector. | $45,000 |
| Jan 18, 2022 | Completed final sign-off Jul 2022 | 1485 Bay Shore Bl | High Band Construction Inc | remove 9 antennas, install 9 antennas, remove 6 rrus, install 6 rrus, install 6 dc trunk, install 1 baseboard, install dc12, install 1 power trunk, swap 9 power strings.Details
remove 9 antennas, install 9 antennas, remove 6 rrus, install 6 rrus, install 6 dc trunk, install 1 baseboard, install dc12, install 1 power trunk, swap 9 power strings. | $25,000 |