Adam Amortnont
- Listed as
- engineer
- Firm
- Tep Opco, Llc
- Based in
- Raleigh
- On San Francisco permits
- Nov 2025 to Apr 2026
8 permits since 2000 (engineer on 8 permits): 5 completed, 2 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 21, 2026 | Completed final sign-off Jun 2026 | 678 Portola Dr | Diablo Telecom & Construction Inc | revision to 202512111485- att modification to (e) wireless facility change 6x 3/4 in conduits from the ac panel to powerplan to 2x 2 inch conduitsDetails
revision to 202512111485- att modification to (e) wireless facility change 6x 3/4 in conduits from the ac panel to powerplan to 2x 2 inch conduits | |
| Apr 21, 2026 | Expired or cancelled withdrawn May 2026 | 250 Clay St | Diablo Telecom & Construction Inc | revision 202511149638- att modification to (e) wireless facility change 6x 3/4 in conduits from the ac panel to powerplan to 2x 2 inch conduitsDetails
revision 202511149638- att modification to (e) wireless facility change 6x 3/4 in conduits from the ac panel to powerplan to 2x 2 inch conduits | |
| Dec 17, 2025 | In progress issued Apr 2026 | 3110 Octavia St | Tier One Construction | at&t: modification of (e) wireless facility. install 4 antennas behind (e) frp screen. remove (1) power plant. install (1) netsure 7100 w/ conversion kit. 13 converters. 15 rectifiers, 1 expansion shelf, 4 50amp and 1 15amp dc breakers, 1 bbu. remove 20 batteries and install 20 new 210a.Details
at&t: modification of (e) wireless facility. install 4 antennas behind (e) frp screen. remove (1) power plant. install (1) netsure 7100 w/ conversion kit. 13 converters. 15 rectifiers, 1 expansion shelf, 4 50amp and 1 15amp dc breakers, 1 bbu. remove 20 batteries and install 20 new 210a. | $50,200 |
| Dec 3, 2025 | In progress issued Jun 2026 | 1701 Jerrold Av | High Band Construction Inc | at&t: modification of an (e) unmanned wireless facility. remove and replace 3 rrus. install (3) air antennas, angle mounts, pipe mounts. rotate alpha & beta sectors. remove (1) infinity pp, rectifiers and converters. r/r 20 batteries. install new rectifiers, converters, (1) 15amp, (6) 50amp dcDetails
at&t: modification of an (e) unmanned wireless facility. remove and replace 3 rrus. install (3) air antennas, angle mounts, pipe mounts. rotate alpha & beta sectors. remove (1) infinity pp, rectifiers and converters. r/r 20 batteries. install new rectifiers, converters, (1) 15amp, (6) 50amp dc | $84,000 |
| Dec 3, 2025 | Completed final sign-off Jun 2026 | 1745 Market St | Nrci Telecom | at&t: modification of an (e) unmanned wireless facility. remove/replace (3) antennas, (1) distribution shell in pp. install converters, rectifiers, (3) 50amp, (1) 15amp dc breakers in pp. remove (20) 160ah batteries and install (20) 210amp batteries in (e) pp and battery rack....Details
at&t: modification of an (e) unmanned wireless facility. remove/replace (3) antennas, (1) distribution shell in pp. install converters, rectifiers, (3) 50amp, (1) 15amp dc breakers in pp. remove (20) 160ah batteries and install (20) 210amp batteries in (e) pp and battery rack.... | $80,300 |
| Dec 3, 2025 | Completed final sign-off Apr 2026 | 555 De Haro St | Diablo Telecom & Construction Inc | at&t: modification of an (e) unmanned wireless facility. remove and replace 3 antennas behind frp screening, rf safety stripping, signs & barricade. remove (1) infinity pp w/ rectifiers and cabinets. install 1 vertiv battery cabinet w/ 12 relocated 210ah batteries. (1) netsure pp w/ (4) new (210ah)Details
at&t: modification of an (e) unmanned wireless facility. remove and replace 3 antennas behind frp screening, rf safety stripping, signs & barricade. remove (1) infinity pp w/ rectifiers and cabinets. install 1 vertiv battery cabinet w/ 12 relocated 210ah batteries. (1) netsure pp w/ (4) new (210ah) | $67,200 |
| Nov 25, 2025 | Completed final sign-off Jul 2026 | 1801 Broadway | Diablo Telecom & Construction Inc | at&t modification of an existing wireless facility consiting of: lower (2) and add (2) antennas; r/r (2) rrus; install (1) dc9 rays cap, (1) powertrunk, r/r infinity power plant w/7 rectifier; dc surges ups, install netsure with 9 retifier; 7 converters, (1) dc 12 2 50a dc breaker in new netsure.Details
at&t modification of an existing wireless facility consiting of: lower (2) and add (2) antennas; r/r (2) rrus; install (1) dc9 rays cap, (1) powertrunk, r/r infinity power plant w/7 rectifier; dc surges ups, install netsure with 9 retifier; 7 converters, (1) dc 12 2 50a dc breaker in new netsure. | $70,000 |
| Nov 19, 2025 | Completed final sign-off May 2026 | 2390 Market St | Metropolitan Electrical Construction | at&t mod of an unmanned wireless facity consisting of: r/r 3 antennas, remove 6 rrus, install 3 rrus, relocate 6 rrus, install netsure conversion kit w/ 8 converters and (3) 50 amp dc breakers, install (6) 2p breakers in (e) ac panel using available slots. install rf signs, stripping/barricadesDetails
at&t mod of an unmanned wireless facity consisting of: r/r 3 antennas, remove 6 rrus, install 3 rrus, relocate 6 rrus, install netsure conversion kit w/ 8 converters and (3) 50 amp dc breakers, install (6) 2p breakers in (e) ac panel using available slots. install rf signs, stripping/barricades | $47,750 |