Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 27, 2026 | Completed final sign-off Jul 2026 | 324 Yerba Buena Dr | Infraservices Group Wireless Llc | verizon: remove (1)(e) antenna & (2)(e) rrvs; install (1) (n) antenna & (1) (n) rrv. no change to (e) batteriesDetails
verizon: remove (1)(e) antenna & (2)(e) rrvs; install (1) (n) antenna & (1) (n) rrv. no change to (e) batteries | $25,000 |
| Mar 21, 2024 | In progress issued Apr 2024 | 275 Yerba Buena Rd | panorama park 275 yerba buena rd linked to apn 8950/002 per dt approval,Details
panorama park 275 yerba buena rd linked to apn 8950/002 per dt approval, | ||
| Aug 29, 2022 | Completed final sign-off Nov 2022 | 324 Yerba Buena Dr | Momentum Services Corp | verizon: connect site to permanent power, install new 2" u/e conduit, remove temp conduits and conductors, install new 200a cam lock gen interface.Details
verizon: connect site to permanent power, install new 2" u/e conduit, remove temp conduits and conductors, install new 200a cam lock gen interface. | $10,000 |
| Jun 28, 2022 | Completed final sign-off Feb 2023 | 66 Yerba Buena Rd | High Band Construction Inc | att: remove (1) (e) antena: install (1) (n) antenna; remove (1) (e) rru; install other small equipment no change to (e) batteriesDetails
att: remove (1) (e) antena: install (1) (n) antenna; remove (1) (e) rru; install other small equipment no change to (e) batteries | $26,000 |
| Nov 5, 2021 | Completed final sign-off Jan 2022 | 66 Yerba Buena Rd | Electric Tech Construction Inc | att: remove (2) (e) antennas; remove (1) (e)rru, install (3) (n) rru; install (2) (n) antennas; install (4) (n) pipe mast; install (1) (n) cabinet.Details
att: remove (2) (e) antennas; remove (1) (e)rru, install (3) (n) rru; install (2) (n) antennas; install (4) (n) pipe mast; install (1) (n) cabinet. | $49,000 |
| Jun 10, 2020 | Completed final sign-off May 2021 | 66 Yerba Buena Rd | Triton Tower Inc | treasure island: remove 1 emerson dc battery cabinet, relocate 2 purcell flx-ws16 stack mounted, install 200a meter, install 200a power panel, relocation of 1 gen plug, relocation of 1 ciena and hoffman box, relocate 1 dc 12 box, install concrete pad w/cmu retaining wall.Details
treasure island: remove 1 emerson dc battery cabinet, relocate 2 purcell flx-ws16 stack mounted, install 200a meter, install 200a power panel, relocation of 1 gen plug, relocation of 1 ciena and hoffman box, relocate 1 dc 12 box, install concrete pad w/cmu retaining wall. | $75,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Electric Tech Construction Inc, High Band Construction Inc, Infraservices Group Wireless Llc, Momentum Services Corp, Triton Tower Inc
- Engineers
- Chris Lee, Chris S Lee, James Spore, Kevin Sorensen, Wissam Zalzali
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.