Back to kitchen remodel contractors
M L S Builder Inc.
- Based in
- Oakland
- On San Francisco permits
- Sep 2010 to Apr 2026
- Last 24 months
- 7 permits filed
73 permits since 2000: 40 completed, 4 in progress, 15 never finaled, 14 expired or cancelled.
Of the 15 never-finaled permits, 7 are 5 to 10 years old, 8 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 2 completed, 2 in progress, 1 never finaled. Typically 10 days from filing to permit and 262 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2026 | In progress issued Mar 2026 | 1028 Balboa St | kitchen remodel: replace 2nd floor kitchen cabinets.Details
kitchen remodel: replace 2nd floor kitchen cabinets. | $10,000 |
| Feb 17, 2026 | Completed final sign-off Jun 2026 | 1593 Mcallister St | apt 206: replace kitchen/cabinets, flooring, and counter. apt 305 replace countertop and sink. to comply with nov#202650430Details
apt 206: replace kitchen/cabinets, flooring, and counter. apt 305 replace countertop and sink. to comply with nov#202650430 | $10,000 |
| Dec 10, 2024 | In progress issued May 2025 | 3405 Geary Bl | remodel residence on 2nd fl: kitchen & bathroom . add bath and convert great room to 2 bedroom at frontDetails
remodel residence on 2nd fl: kitchen & bathroom . add bath and convert great room to 2 bedroom at front | $45,000 |
| May 1, 2015 | Completed final sign-off Jun 2016 | 3359 26th St | interior remodel of the residential unit: kitchen remodel, bathroom, and powder room remodel. new bathroom, reconfigure non-bearing walls on 2nd floor only.Details
interior remodel of the residential unit: kitchen remodel, bathroom, and powder room remodel. new bathroom, reconfigure non-bearing walls on 2nd floor only. | $55,000 |
| Aug 26, 2013 | Never finaled issued Aug 2013, no final | 1635 26th Av | remove the basement kitchen, legalize (e) bathroom on ground floorDetails
remove the basement kitchen, legalize (e) bathroom on ground floor | $500 |