Block 4108, lot 003A
2342 03rd St
- City’s use
- Commercial Hotel
- Built
- 1900
- Stories
- 3
- Rooms
- 4 bathrooms
- Building
- 5,850 sq ft
- Lot
- 2,395 sq ft
- Zoning
- M2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 13, 2026 | Completed final sign-off Jun 2026 | 2342 03rd St | addressing permit only: purpose of this permit is to formally address the residential units associated with 2342 03rd stDetails
addressing permit only: purpose of this permit is to formally address the residential units associated with 2342 03rd st | ||
| Apr 10, 2023 | Never finaled issued Apr 2023, no final | 2344 03rd St | change of use m to b. establish a personal service use (tattoo shop) no residential guest rooms will be removed or converted. no construction work done, only furniture added.Details
change of use m to b. establish a personal service use (tattoo shop) no residential guest rooms will be removed or converted. no construction work done, only furniture added. | ||
| Feb 3, 2020 | Completed final sign-off Dec 2020 | 2342 03rd St | Crime Watch Security Sys Llc | new fire alarm system with sprinkler monitoring new facu, aes 7707, pull station, smoke detector, horn strobe, strobe, low frequency, door holders, and modulesDetails
new fire alarm system with sprinkler monitoring new facu, aes 7707, pull station, smoke detector, horn strobe, strobe, low frequency, door holders, and modules | $16,000 |
| Oct 25, 2019 | Completed final sign-off Feb 2020 | 2344 03rd St | A -1 Roof Management & Construction, Inc | otc approval - overlay existing roof, install felt underlayment followed by the installation of shingles.Details
otc approval - overlay existing roof, install felt underlayment followed by the installation of shingles. | $15,412 |
| Sep 13, 2019 | Never finaled issued Sep 2019, no final | 2342 03rd St | street spaceDetails
street space | ||
| Aug 15, 2019 | Completed final sign-off Jul 2023 | 2342 03rd St | revision to pa 2015-0317-1039. to update the demo calculations due to sub-standard and deterioration of existing structure membranes. all work to be performed within existing boundary of bldg.Details
revision to pa 2015-0317-1039. to update the demo calculations due to sub-standard and deterioration of existing structure membranes. all work to be performed within existing boundary of bldg. | ||
| Jun 17, 2019 | Completed final sign-off Sep 2021 | 2342 03rd St | M L S Builder Inc. | new fire sprinkler system for interior and underground connection.Details
new fire sprinkler system for interior and underground connection. | $20,000 |
| Jun 13, 2019 | Never finaled issued Jun 2019, no final | 2342 03rd St | street spaceDetails
street space | ||
| May 22, 2019 | Completed final sign-off Jul 2023 | 2342 03rd St | to comply with nov 201956861 temp shoringDetails
to comply with nov 201956861 temp shoring | ||
| Apr 23, 2019 | Completed final sign-off Jul 2023 | 2342 03rd St | revision to approved pa 2015-0317-1039 to perform minor interior layout adjustment. structural revision to match architectural- all work to be performed within existing boundary of the bldg. no kitchenettes in guest room. to include structural special inspection form.Details
revision to approved pa 2015-0317-1039 to perform minor interior layout adjustment. structural revision to match architectural- all work to be performed within existing boundary of the bldg. no kitchenettes in guest room. to include structural special inspection form. | ||
| Aug 23, 2017 | Completed final sign-off Jul 2023 | 2342 03rd St | exploratory surface removal per elevations per dcp request: removal of flront elevation surace (not to exceed 5% of facade area). removal of left elevation surface (not to exceed 5% of elevation area). patch & replace as needed after expoloratory work. maher naDetails
exploratory surface removal per elevations per dcp request: removal of flront elevation surace (not to exceed 5% of facade area). removal of left elevation surface (not to exceed 5% of elevation area). patch & replace as needed after expoloratory work. maher na | $1,000 | |
| May 27, 2015 | Expired or cancelled cancelled Jan 2026 | 2342 03rd St | interior work to include new ada compliant stairs/handrails, new ada commercial restroom and kitchenette. 18 sro bathrooms(4 accessible and kitchenette). repair wood framing in kind per pest report. soft story structural upgrades and mep under seperate permit. n/a for maher.Details
interior work to include new ada compliant stairs/handrails, new ada commercial restroom and kitchenette. 18 sro bathrooms(4 accessible and kitchenette). repair wood framing in kind per pest report. soft story structural upgrades and mep under seperate permit. n/a for maher. | $100,000 | |
| Mar 17, 2015 | Completed final sign-off Nov 2021 | 2342 03rd St | new ada compliant walkwy, storefront, entry, comm'l restrm, kitchenette,lobby entranc. install 18 sro bathrms & kitchenettes. replace all (e) aluminum windows w/double hang wood windows, replace rear wood fire escape w/steel fire escape. mep/structural under sep permitDetails
new ada compliant walkwy, storefront, entry, comm'l restrm, kitchenette,lobby entranc. install 18 sro bathrms & kitchenettes. replace all (e) aluminum windows w/double hang wood windows, replace rear wood fire escape w/steel fire escape. mep/structural under sep permit | $200,000 | |
| Feb 10, 2000 | Completed final sign-off Jun 2000 | 2342 03rd St | stairs repairDetails
stairs repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- A -1 Roof Management & Construction, Inc, Crime Watch Security Sys Llc, M L S Builder Inc.
- Architects
- Bahman Ghassemzadeh, Scott Pelichoff
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.