Block 3619, lot 034
985 Church St
- City’s use
- Multi-Family Residential
- Built
- 1928
- Stories
- 2
- Units
- 7
- Rooms
- 7 bathrooms
- Building
- 5,417 sq ft
- Lot
- 2,596 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 23, 2026 | Completed final sign-off Apr 2026 | 985 Church St | Citywest Construction Inc. | unit 5: interior remodel - kitchen remodel. remove wall between kitchen and dining.Details
unit 5: interior remodel - kitchen remodel. remove wall between kitchen and dining. | $15,000 |
| May 16, 2025 | Completed final sign-off Sep 2025 | 985 Church St | Citywest Construction Inc. | replacement in-kind deteriorating rear egress stair per sfbc 1011.12.3 no interior workDetails
replacement in-kind deteriorating rear egress stair per sfbc 1011.12.3 no interior work | $40,000 |
| Sep 9, 2024 | Completed final sign-off Sep 2024 | 985 Church St | All Bay Solar | reroofingDetails
reroofing | $17,000 |
| Sep 6, 2017 | Completed final sign-off Aug 2018 | 985 Church St | Crime Watch Security Sys Llc | installation of a new sprinkler monitoring system. ref pa 2016-0503-6406 and 2017-0821-5414Details
installation of a new sprinkler monitoring system. ref pa 2016-0503-6406 and 2017-0821-5414 | $3,000 |
| Aug 21, 2017 | Completed final sign-off Aug 2018 | 985 Church St | M L S Builder Inc. | install new fire sprinkler system on 1st fl per nfa 13r. new underground 2" fire water service from sidewalk. ref pa #201605036406.Details
install new fire sprinkler system on 1st fl per nfa 13r. new underground 2" fire water service from sidewalk. ref pa #201605036406. | $13,000 |
| May 3, 2016 | Completed final sign-off May 2018 | 985 Church St | Yiu Cheong Construction Co Inc | per ordinance# 30-15. add a residential unit in 1st floor with a bedroom, a full bath, a kitchen, dining & living area. separated soft bldg pa# 2015/02/05/7657.Details
per ordinance# 30-15. add a residential unit in 1st floor with a bedroom, a full bath, a kitchen, dining & living area. separated soft bldg pa# 2015/02/05/7657. | $78,000 |
| Feb 5, 2015 | Completed final sign-off May 2018 | 985 Church St | soft story compliance: method - 2012 iebc appenx 4a. mandatory seismic retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, install grade beams ssw and 1 steel rigid frame on g/f, at front garage door opening & shear walls to rear & side walls of bldg. per plan.Details
soft story compliance: method - 2012 iebc appenx 4a. mandatory seismic retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, install grade beams ssw and 1 steel rigid frame on g/f, at front garage door opening & shear walls to rear & side walls of bldg. per plan. | $60,000 | |
| May 17, 2012 | Completed final sign-off Aug 2012 | 985 Church St | Yiu Cheong Construction Co Inc | #6- change bathroom tile to fix leak and replace water saving toilet, change part of old cabinets, new stove, new paint and sand hardwood floor.Details
#6- change bathroom tile to fix leak and replace water saving toilet, change part of old cabinets, new stove, new paint and sand hardwood floor. | $7,500 |
| Mar 16, 2012 | Completed final sign-off May 2012 | 985 Church St | Yiu Cheong Construction Co Inc | apt #4-change bathroom tile with new vanity & change cabinets in the kitchen wuth same layoutDetails
apt #4-change bathroom tile with new vanity & change cabinets in the kitchen wuth same layout | $7,000 |
| Mar 5, 2012 | Expired or cancelled cancelled Jan 2026 | 985 Church St | renovation in unit # 2: relocate extg kitchen kitchen, convert extg dining area into bedroom, renovate extg bath.Details
renovation in unit # 2: relocate extg kitchen kitchen, convert extg dining area into bedroom, renovate extg bath. | $18,000 | |
| Feb 17, 2012 | Completed final sign-off May 2012 | 985 Church St | Yiu Cheong Construction Co Inc | change bathroom with new tile , variety and change cabinets in that kitchen with the same layout. apt. 2Details
change bathroom with new tile , variety and change cabinets in that kitchen with the same layout. apt. 2 | $3,000 |
| May 19, 2010 | Completed final sign-off Feb 2011 | 985 Church St | Yiu Cheong Construction Co Inc | to comply the nov #200868096 and install a sump pump in the basement level with new pipes and outlets change the existing service panel 100 amp to 200 amp as to upgrade the supply. repair rear stair less than 50% repair in kindDetails
to comply the nov #200868096 and install a sump pump in the basement level with new pipes and outlets change the existing service panel 100 amp to 200 amp as to upgrade the supply. repair rear stair less than 50% repair in kind | $2,000 |
| Feb 3, 2010 | Never finaled issued Feb 2010, no final | 985 Church St | street spaceDetails
street space | ||
| Jan 15, 2010 | Never finaled filed Jan 2010, never issued | 985 Church St | comply with nov 200868096 at property lineDetails
comply with nov 200868096 at property line | $5,000 | |
| Dec 18, 2009 | Completed final sign-off Jan 2010 | 985 Church St | American Home Renewal Inc | install vinyl siding to the back nly not visible from the street no structural changes 6000 sqft.Details
install vinyl siding to the back nly not visible from the street no structural changes 6000 sqft. | $15,000 |
| Sep 29, 2009 | Never finaled issued Sep 2009, no final | 985 Church St | street spaceDetails
street space | ||
| Sep 25, 2009 | Completed final sign-off Nov 2009 | 985 Church St | Fox Brothers Construction Inc | reinforce existing exterior foundation. fire dept plan review only. no insp. required.Details
reinforce existing exterior foundation. fire dept plan review only. no insp. required. | $50,000 |
| Aug 5, 2009 | Completed final sign-off Aug 2009 | 985 Church St | Fox Brothers Construction Inc | repair rear wooden stairs & landings. total area less than 40%. inspction report findings item 4a h r wellington 3/04/09.Details
repair rear wooden stairs & landings. total area less than 40%. inspction report findings item 4a h r wellington 3/04/09. | $4,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Yiu Cheong Construction Co Inc (5), Citywest Construction Inc. (2), Fox Brothers Construction Inc (2), All Bay Solar, American Home Renewal Inc, Crime Watch Security Sys Llc, M L S Builder Inc.
- Architects
- Jason Chan
- Engineers
- Colm O'sulleabhain (2), Young Kim
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.