Colm O'sulleabhain
- Listed as
- architect, engineer
- Firm
- Benchmark Engineering
- Based in
- Sf
- On San Francisco permits
- Sep 2017 to Sep 2026
57 permits since 2000 (engineer on 52 permits, architect on 5 permits): 22 completed, 32 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 1 Garcia Av | reconfig (e) habitale space on g/f and convert (e) unconditioned storage space into habitable space to add 2 bedrooms, 1 bathroom, 1 wetbar & 1 laundry closet. all work w/in the (e) bldg footprint.Details
reconfig (e) habitale space on g/f and convert (e) unconditioned storage space into habitable space to add 2 bedrooms, 1 bathroom, 1 wetbar & 1 laundry closet. all work w/in the (e) bldg footprint. | $195,126 | |
| Aug 25, 2026 | In progress issued Sep 2026 | 255 Hearst Av | Fornari Inc Dba Bold Construction | renovation of a portion of the (e) 1st floor,converting it from unconditioned to conditioned space.a new interior stair is proposed to provide access between the upper & lower levels. the (e) 2nd floor kitchen will be removed, a new kitvhen will be installed on the 1st flr. 2nd flr bathroom will beDetails
renovation of a portion of the (e) 1st floor,converting it from unconditioned to conditioned space.a new interior stair is proposed to provide access between the upper & lower levels. the (e) 2nd floor kitchen will be removed, a new kitvhen will be installed on the 1st flr. 2nd flr bathroom will be | $100,000 |
| Aug 25, 2026 | In progress issued Sep 2026 | 221 Clipper St | Pristine Builders Group | replacement in kind of wood portion of (e) non- conforming, deteriorating front+ entry stair per sfbc 1011.12.3. all replacement in kind. (no interior work).Details
replacement in kind of wood portion of (e) non- conforming, deteriorating front+ entry stair per sfbc 1011.12.3. all replacement in kind. (no interior work). | $40,000 |
| Aug 14, 2026 | In progress issued Aug 2026 | 779 43rd Av | revision to pa# 202605070845: revise rear doors to windows. eliminate steps. document revised stair layout. 2/f - bathroom remodel. elminate pantry. new skylight. no change to egress path or sffd 22' laddex path.Details
revision to pa# 202605070845: revise rear doors to windows. eliminate steps. document revised stair layout. 2/f - bathroom remodel. elminate pantry. new skylight. no change to egress path or sffd 22' laddex path. | $5,000 | |
| Aug 7, 2026 | In progress issued Aug 2026 | 823 Kansas St | Spiers & Sons Inc | structural repair to existing roof beam at rear of the property. replace existing failed beam with new steel beam.Details
structural repair to existing roof beam at rear of the property. replace existing failed beam with new steel beam. | $30,000 |
| Aug 7, 2026 | In progress filed Aug 2026, not yet issued | 716 Page St | kitchen remodel of 1 unit in condo building. replace all appliances and cabinets, move door opening, enlarge opening to dining roomDetails
kitchen remodel of 1 unit in condo building. replace all appliances and cabinets, move door opening, enlarge opening to dining room | $30,000 | |
| Jul 31, 2026 | In progress issued Aug 2026 | 424 Tocoloma Av | convert 58 sq ft first floor storage space to full bathroom.Details
convert 58 sq ft first floor storage space to full bathroom. | $10,000 | |
| Jul 17, 2026 | In progress issued Aug 2026 | 1226 08th Av | Douglas Gower Dba Mesa Construction | partial voluntary strengthenening at ground floor. new voluntary plywood shearwalls at (e) walls.Details
partial voluntary strengthenening at ground floor. new voluntary plywood shearwalls at (e) walls. | $45,000 |
| Jul 17, 2026 | In progress issued Jul 2026 | 70 Grand View Tr | Pjd Construction Inc | structural repairs to (e) decks at rear of the building. replace (e) deteriorated framing members. replace (e) cantilvered beams w/ new beams & columns.Details
structural repairs to (e) decks at rear of the building. replace (e) deteriorated framing members. replace (e) cantilvered beams w/ new beams & columns. | $50,000 |
| Jul 14, 2026 | In progress filed Jul 2026, not yet issued | 2728 Vicente St | 1200sqf 2-story horizontal addition of (e) sfh. 1/f addition includes 2 bedrooms, 2 baths, closets, laundry room, mech room.2/f addition includes kitchen, dining, living room, new deck. interior remodel of (e) spacesDetails
1200sqf 2-story horizontal addition of (e) sfh. 1/f addition includes 2 bedrooms, 2 baths, closets, laundry room, mech room.2/f addition includes kitchen, dining, living room, new deck. interior remodel of (e) spaces | $250,000 | |
| Jul 10, 2026 | In progress filed Jul 2026, not yet issued | 866 35th Av | Valex Construction | addition 402sf rear yard and remodel (e) home. new deck and new stairs to backyard. renovation and expansion of the kitchen on 1/f. construction of 1/2 bathroom on 1/f. renovation of 2/f to add 1 bedroom and 2 baths, walk-in closet and laundry.Details
addition 402sf rear yard and remodel (e) home. new deck and new stairs to backyard. renovation and expansion of the kitchen on 1/f. construction of 1/2 bathroom on 1/f. renovation of 2/f to add 1 bedroom and 2 baths, walk-in closet and laundry. | $400,000 |
| Jun 25, 2026 | In progress issued Jul 2026 | 311 Mangels Av | De Brus Construction Inc | interior remodel of (e) sfh. 1/f: remodel & expand (e) master bath & closet, add 95 sf conditioned space. 2/f: replace (e) rear window & sliding door in kind, new range hoodDetails
interior remodel of (e) sfh. 1/f: remodel & expand (e) master bath & closet, add 95 sf conditioned space. 2/f: replace (e) rear window & sliding door in kind, new range hood | $75,000 |
| Jun 24, 2026 | In progress issued Jun 2026 | 317 02nd Av | replace e) brick foundation, seismic upgrades at ground flDetails
replace e) brick foundation, seismic upgrades at ground fl | $100,000 | |
| Jun 24, 2026 | In progress issued Jun 2026 | 137 Lundys Ln | L Cabral Construction | detached rear garage: revision to 202508042260, add structural detail for repairs to field conditionsDetails
detached rear garage: revision to 202508042260, add structural detail for repairs to field conditions | $10,000 |
| May 27, 2026 | In progress filed May 2026, not yet issued | 3530 Moraga St | reconfigure the bedroom, bathroom, family room and laundry room and closets on first floor. remove redundant front door and reconfigure the staircase.Details
reconfigure the bedroom, bathroom, family room and laundry room and closets on first floor. remove redundant front door and reconfigure the staircase. | $131,000 | |
| May 20, 2026 | In progress issued May 2026 | 317 02nd Av | interior remodel of sfh . (n) stairs to 2nd floor: 2/f new stairs to 1st and 3rd floors. kitchen remodel, remove pantry, remove wall between kitchen and bedroom. 3/f add bathrooom, closets and office room. (n) skylightDetails
interior remodel of sfh . (n) stairs to 2nd floor: 2/f new stairs to 1st and 3rd floors. kitchen remodel, remove pantry, remove wall between kitchen and bedroom. 3/f add bathrooom, closets and office room. (n) skylight | $100,000 | |
| May 7, 2026 | In progress issued May 2026 | 779 43rd Av | interior remodel of (e) sfd 2nd fl - kitchen remodathroom & closet. demoe (e) deck to 1st fl; 1st fl - add 817 sf conditioned space behind garage; add bedroom, bathroom, office, family room & laundry; bathroom reodelDetails
interior remodel of (e) sfd 2nd fl - kitchen remodathroom & closet. demoe (e) deck to 1st fl; 1st fl - add 817 sf conditioned space behind garage; add bedroom, bathroom, office, family room & laundry; bathroom reodel | $150,000 | |
| May 7, 2026 | In progress issued Sep 2026 | 657 Arguello Bl | Abbeyside Construction Inc | horizontal addition and new 3rd flr expanision; expansion of conditined living space to 1/f with new bedroom, bath, exercise & media room; reconfigure 2/f with living/dining, kitchen, bath & study; & new 3/f with 3-bedrooms & 2-baths.Details
horizontal addition and new 3rd flr expanision; expansion of conditined living space to 1/f with new bedroom, bath, exercise & media room; reconfigure 2/f with living/dining, kitchen, bath & study; & new 3/f with 3-bedrooms & 2-baths. | $400,000 |
| Apr 22, 2026 | Completed final sign-off Sep 2026 | 887 Faxon Av | Barry O Mahony Construction | partial voluntary seismic upgrades in basementof sfh partial foundation. repair/upgrades. to comply nov 202649902. legalize replacement of (e)water heater.Details
partial voluntary seismic upgrades in basementof sfh partial foundation. repair/upgrades. to comply nov 202649902. legalize replacement of (e)water heater. | $35,000 |
| Apr 14, 2026 | In progress issued Jun 2026 | 7 Edna St | Abacus Group Builders Inc | ref 202508193330: replace foundation at garage, excavate northeast corner of garage to increase ceiling height, remove/replace posts/ beam at center of garag. replace furnace (revise per previous permit) w/heat pump. no work at 2nd/fDetails
ref 202508193330: replace foundation at garage, excavate northeast corner of garage to increase ceiling height, remove/replace posts/ beam at center of garag. replace furnace (revise per previous permit) w/heat pump. no work at 2nd/f | $10,000 |
| Mar 25, 2026 | Completed final sign-off Aug 2026 | 44 Lynch St | interior remodel. (e) bathroom fixtures to be relaced, (e) dining room & kitchen to reconfigures, electrical & plumbing work to be performed.Details
interior remodel. (e) bathroom fixtures to be relaced, (e) dining room & kitchen to reconfigures, electrical & plumbing work to be performed. | $120,000 | |
| Feb 23, 2026 | Completed final sign-off Apr 2026 | 985 Church St | Citywest Construction Inc. | unit 5: interior remodel - kitchen remodel. remove wall between kitchen and dining.Details
unit 5: interior remodel - kitchen remodel. remove wall between kitchen and dining. | $15,000 |
| Nov 18, 2025 | Completed final sign-off Aug 2026 | 50 Willard North St | C & J's Custom Builds Inc | interior remodel of (e) sfd. 1st floor add 771 sf of living space- (n) bedroom , bathroom, closets, wc, family room. 2nd floor (n) stairs to 1st floor, reconfgirue walls to accommadate stairs laundry closetDetails
interior remodel of (e) sfd. 1st floor add 771 sf of living space- (n) bedroom , bathroom, closets, wc, family room. 2nd floor (n) stairs to 1st floor, reconfgirue walls to accommadate stairs laundry closet | $100,000 |
| Oct 28, 2025 | In progress filed Oct 2025, not yet issued | 531 Gennessee St | 151 sqft horizontal addition & interior remodel at 2nd fl of (e) sfh. new interior stairs to 1st fl. infill northside lightwell against adjacent neighbors blind wall. new 2nd fl decks at the rear & south side. interior remodel includes kitchen & bath remodel. new skylight.Details
151 sqft horizontal addition & interior remodel at 2nd fl of (e) sfh. new interior stairs to 1st fl. infill northside lightwell against adjacent neighbors blind wall. new 2nd fl decks at the rear & south side. interior remodel includes kitchen & bath remodel. new skylight. | $95,000 | |
| Oct 2, 2025 | Completed final sign-off Feb 2026 | 456 Kansas St | Gmc Constrcutinon Inc | structural repairs at garage door & front facade after car impact collision. replace garage door and stucco. abate nov #202540777Details
structural repairs at garage door & front facade after car impact collision. replace garage door and stucco. abate nov #202540777 | $20,000 |
| Sep 23, 2025 | Completed final sign-off Mar 2026 | 1731 32nd Av | Abbeyside Construction Inc | add (n) deck in rear yard. enclose entry vestiblue and add (n) front door entryDetails
add (n) deck in rear yard. enclose entry vestiblue and add (n) front door entry | $7,100 |
| Sep 9, 2025 | Completed final sign-off Apr 2026 | 560 47th Av | Shane Muldoon Construction Inc. | interior remodel of (e) sfd 1st floor add (n) bedroom , bathroom, closet. (n) french door to rear yard. no work on 2nd floorDetails
interior remodel of (e) sfd 1st floor add (n) bedroom , bathroom, closet. (n) french door to rear yard. no work on 2nd floor | $50,000 |
| Sep 3, 2025 | In progress issued Jan 2026 | 3845 Ocean Av | Alfa Building Solutions Inc | repairs to the garage and building affected by a car collision. replace affected structural beams and posts and foundation repairs as needed. to comply with nov 202537192Details
repairs to the garage and building affected by a car collision. replace affected structural beams and posts and foundation repairs as needed. to comply with nov 202537192 | $47,500 |
| Aug 20, 2025 | Completed final sign-off Mar 2026 | 1731 32nd Av | Abbeyside Construction Inc | reconfigure existing bathroom and closet, add new bathroom, add new built in kitchen peninsula counter.Details
reconfigure existing bathroom and closet, add new bathroom, add new built in kitchen peninsula counter. | $38,000 |
| Aug 12, 2025 | In progress issued May 2026 | 1262 41st Av | S And L Remodeling And Design Inc | add 1 bed, 1 bath, 371 sq. ft unit per density at ground floor. add 2 bed, 1 bath, 490 sq. ft. adu per ca state program at ground floor. 151 sq. ft. added conditioned space at ground flooor.Details
add 1 bed, 1 bath, 371 sq. ft unit per density at ground floor. add 2 bed, 1 bath, 490 sq. ft. adu per ca state program at ground floor. 151 sq. ft. added conditioned space at ground flooor. | $70,000 |
| Aug 4, 2025 | In progress issued Apr 2026 | 137 Lundys Ln | L Cabral Construction | detached garage: demolition of (e) detached garage and rebuild in kind. existing foundation to remain.Details
detached garage: demolition of (e) detached garage and rebuild in kind. existing foundation to remain. | $18,000 |
| May 29, 2025 | Completed final sign-off Feb 2026 | 1620 Dolores St | Spiers & Sons Inc | convert existing closet area into new bathroom on 3rd floor.construct vertical expansion to accomodate bathroom.Details
convert existing closet area into new bathroom on 3rd floor.construct vertical expansion to accomodate bathroom. | $40,000 |
| May 28, 2025 | Completed final sign-off Feb 2026 | 159 Russ St | Current Construction | modification to (e) garage door. move garage door forward 5'0" to front facade of buildling to eliminate recess area to remain within property lineDetails
modification to (e) garage door. move garage door forward 5'0" to front facade of buildling to eliminate recess area to remain within property line | $15,000 |
| May 28, 2025 | In progress issued Jun 2025 | 92 Keystone Wy | 820 sf conditioned living space addition @ ground floor of (e) 2 story sfh. convert storage rooms to living space. 1 bedroom; 1 family room addition, 1 laundty, 1 bathDetails
820 sf conditioned living space addition @ ground floor of (e) 2 story sfh. convert storage rooms to living space. 1 bedroom; 1 family room addition, 1 laundty, 1 bath | $50,000 | |
| May 16, 2025 | Completed final sign-off Sep 2025 | 985 Church St | Citywest Construction Inc. | replacement in-kind deteriorating rear egress stair per sfbc 1011.12.3 no interior workDetails
replacement in-kind deteriorating rear egress stair per sfbc 1011.12.3 no interior work | $40,000 |
| May 8, 2025 | Completed final sign-off May 2026 | 815 26th Av | Cdr Builders Inc | interior remodel: convert (e) flex space & office to master bedroom, bath remodel. add closets & powder room. 2nd fl: infll blind lightwells, at east & west sides, convert bedroom to sun room, kitchen & bath remodel. new rear deckDetails
interior remodel: convert (e) flex space & office to master bedroom, bath remodel. add closets & powder room. 2nd fl: infll blind lightwells, at east & west sides, convert bedroom to sun room, kitchen & bath remodel. new rear deck | $150,000 |
| Feb 4, 2025 | In progress issued Feb 2025 | 66 Granada Av | Macken Construction, Current Construction | demo and rebuld in kind front entry stairs side walls and landing . demo garage door and create (n) recess for (n) garage door. (n) window at front facade replace 7 windows and relocate gas meterDetails
demo and rebuld in kind front entry stairs side walls and landing . demo garage door and create (n) recess for (n) garage door. (n) window at front facade replace 7 windows and relocate gas meter | $25,000 |
| Feb 4, 2025 | Expired or cancelled expired Jun 2026 | 1417 21st Av | Current Construction | revision 202410173179 to inlcude adding a wall to create (n) hallway at 1st floor and to replace (e) wood column for a steel column located at living room.Details
revision 202410173179 to inlcude adding a wall to create (n) hallway at 1st floor and to replace (e) wood column for a steel column located at living room. | |
| Jan 30, 2025 | In progress filed Jan 2025, not yet issued | 1420 11th Av | construct (n) 170 sf 2nd floor deck at rear of property . (n) stairs to rear yard, (n) door to deck, demo (e) rear yard deck.Details
construct (n) 170 sf 2nd floor deck at rear of property . (n) stairs to rear yard, (n) door to deck, demo (e) rear yard deck. | $20,000 | |
| Jan 7, 2025 | Completed final sign-off Aug 2025 | 889 Corbett Av | Corkcon Llc | interior remodel at 1st floor apt #891. convert closet to bathroom. add larager closet to (e) bedroom. no scope at 2nd and 3rd floor.Details
interior remodel at 1st floor apt #891. convert closet to bathroom. add larager closet to (e) bedroom. no scope at 2nd and 3rd floor. | $25,000 |
| Nov 13, 2024 | Expired or cancelled expired Apr 2026 | 939 Greenwich St | revision to permit 202405202486. replace (e) slab on grade (sog) and add bathroom and wetbar at basement conditioned area. add framed platform at 1/f. add skylights at top floor.Details
revision to permit 202405202486. replace (e) slab on grade (sog) and add bathroom and wetbar at basement conditioned area. add framed platform at 1/f. add skylights at top floor. | $35,000 | |
| Sep 25, 2024 | Completed final sign-off Sep 2025 | 2826 Sacramento St | Pristine Builders Group | interior remodel to 2nd level kitchen, dining and powder room area including back stairs. remodel upper level bedrooms, closets, and bathrooms. add laundry, bathroom, and storage to 1st level.Details
interior remodel to 2nd level kitchen, dining and powder room area including back stairs. remodel upper level bedrooms, closets, and bathrooms. add laundry, bathroom, and storage to 1st level. | $75,000 |
| Aug 20, 2024 | In progress issued Sep 2024 | 686 15th Av | Pjd Construction Inc | replace (e) 3rd fl bay window/roof on front facade, reframe front bay and replace 5 front windows. demolish e glass construction and replace with new framing and windows. replace front facade sidingDetails
replace (e) 3rd fl bay window/roof on front facade, reframe front bay and replace 5 front windows. demolish e glass construction and replace with new framing and windows. replace front facade siding | $50,000 |
| Aug 19, 2024 | In progress issued Aug 2024 | 1743 10th Av | Macken Construction | revision to pa#: 202404129876. infill south wall lightwell at 3rd floor against neighor's blind wall. add skylight to 3rd flr bath. remove master bath windows.Details
revision to pa#: 202404129876. infill south wall lightwell at 3rd floor against neighor's blind wall. add skylight to 3rd flr bath. remove master bath windows. | $10,000 |
| Aug 19, 2024 | In progress issued Aug 2024 | 557 Wisconsin St | interior remodel of (e) sfr. 2/f convert (e) bedroom to master bath and closet, kitchen remodel. 1/f convert (e) storage area to conditional space, add/1 bedroom, 1 bath, creat new 467sft2 conditional space, new stairs to ground floor.Details
interior remodel of (e) sfr. 2/f convert (e) bedroom to master bath and closet, kitchen remodel. 1/f convert (e) storage area to conditional space, add/1 bedroom, 1 bath, creat new 467sft2 conditional space, new stairs to ground floor. | $65,000 | |
| Jul 10, 2024 | Completed final sign-off Sep 2024 | 2715 Scott St | O'neill & Neville Construction Inc | rev to pa# 202406204861. add (n) concrete grade beam at front of garage. update structural detail per field conditionsDetails
rev to pa# 202406204861. add (n) concrete grade beam at front of garage. update structural detail per field conditions | $15,000 |
| Jun 12, 2024 | Completed final sign-off Apr 2026 | 939 Greenwich St | interior remodel of (e) duplex. 3rd & 2nd fl- convert (e) closet to master bath, bathroom remodel. 1f- partially convert (e) garage/storage area to bedroom & bathroom. create new 551 sq ft conditioned space. basement-convert 954 sq ft of (e) unfinished storage to conditioned space.Details
interior remodel of (e) duplex. 3rd & 2nd fl- convert (e) closet to master bath, bathroom remodel. 1f- partially convert (e) garage/storage area to bedroom & bathroom. create new 551 sq ft conditioned space. basement-convert 954 sq ft of (e) unfinished storage to conditioned space. | $75,000 | |
| Jun 10, 2024 | Completed final sign-off Mar 2026 | 888 Haight St | Toolbox | structural: voluntary strengthen (e) post to beam connections at garage. architectural: at rear room behind garage - add (1) full bath, replace windows, insulate walls and add 5/8 type x gyp bd. w/ fire door to garage. this ground level rear room to be "unconditioned storage" not habitable space.Details
structural: voluntary strengthen (e) post to beam connections at garage. architectural: at rear room behind garage - add (1) full bath, replace windows, insulate walls and add 5/8 type x gyp bd. w/ fire door to garage. this ground level rear room to be "unconditioned storage" not habitable space. | $35,000 |
| May 21, 2024 | Completed final sign-off Oct 2024 | 1840 29th Av | 2nd floor interior remodel of extg s.f.d. convert extg closet to bathroom, add skylight, raise extg low roof level in lightwell. add closet to extg bedroom.Details
2nd floor interior remodel of extg s.f.d. convert extg closet to bathroom, add skylight, raise extg low roof level in lightwell. add closet to extg bedroom. | $46,500 | |
| May 1, 2024 | Completed final sign-off Nov 2024 | 787 Green St | rev 202111222961- unit 787- interior remodel on 3rd floor to include some wall relocation. enlarge closet. demo faux fireplace. add pantry at kitchen. combine kitchen and dining room. replacing doors.Details
rev 202111222961- unit 787- interior remodel on 3rd floor to include some wall relocation. enlarge closet. demo faux fireplace. add pantry at kitchen. combine kitchen and dining room. replacing doors. | $10,000 | |
| Apr 24, 2024 | Completed final sign-off Oct 2024 | 2345 Turk Bl | Valex Construction | kitchen remodel. remove wall between kitchen & dining room. replace three street facing windows at the kitchen.Details
kitchen remodel. remove wall between kitchen & dining room. replace three street facing windows at the kitchen. | $25,000 |
| Apr 12, 2024 | In progress issued Apr 2024 | 1743 10th Av | Macken Construction | interior remodel of (e) sfh. 3rd fl - convert (e) reading room to master bath & closet. bath remodel; 2nd fl - bathroom remodel & create new pantry; 1st floor (n) slab on grade @ rear storage roomDetails
interior remodel of (e) sfh. 3rd fl - convert (e) reading room to master bath & closet. bath remodel; 2nd fl - bathroom remodel & create new pantry; 1st floor (n) slab on grade @ rear storage room | $60,000 |
| Jan 22, 2024 | In progress filed Jan 2024, not yet issued | 565 Banks St | crawl space retrofit per crmp ebb program, fema p-1100 chapter 4.5 - simplified engineered vulnerablility-based retrofit. ebb retrofit per engineered plans. engineered seismic retrofit per fema p-1100.Details
crawl space retrofit per crmp ebb program, fema p-1100 chapter 4.5 - simplified engineered vulnerablility-based retrofit. ebb retrofit per engineered plans. engineered seismic retrofit per fema p-1100. | $20,000 | |
| Dec 14, 2023 | Completed final sign-off Jan 2025 | 1342 28th Av | Ceres Construction Inc | in garage only soft story retrofit per crmp ess program, fema p-1100. chapter 5.5, ess retrofit per engineered plans.Details
in garage only soft story retrofit per crmp ess program, fema p-1100. chapter 5.5, ess retrofit per engineered plans. | $13,000 |
| Oct 18, 2023 | Completed final sign-off May 2024 | 2028 14th Av | Current Construction | voluntary seismic upgrade at g/f of existing sfh. add foundation bolting and shearwalls at 1/f garage. no exterior work.Details
voluntary seismic upgrade at g/f of existing sfh. add foundation bolting and shearwalls at 1/f garage. no exterior work. | $20,000 |
| Sep 7, 2023 | Expired or cancelled withdrawn Dec 2023 | 41 Park St | interior remodel and infill 2 blind lightwells. first flr - convert (e) flex space and storage space to master bedroom, bathroom remodel, new stairs. second flr- infill blind lightwells and east and west sides.Details
interior remodel and infill 2 blind lightwells. first flr - convert (e) flex space and storage space to master bedroom, bathroom remodel, new stairs. second flr- infill blind lightwells and east and west sides. | $65,000 | |
| Sep 18, 2017 | In progress issued Oct 2023 | 1000 Ashbury St | O'neill Construction Inc | mandatory soft story retrofit per sfebc chapter 4d engineering criteria: 2016 cebc appendix a4. na for maher. install 2 steel moment frames at garage door openings,add shearwalls in garage. adddress complaint 201992451Details
mandatory soft story retrofit per sfebc chapter 4d engineering criteria: 2016 cebc appendix a4. na for maher. install 2 steel moment frames at garage door openings,add shearwalls in garage. adddress complaint 201992451 | $100,000 |